1. General.
This specification covers the minimum requirements of surface preparation and painting of
out side surface of Carbon Steel Pressure Vessels or Exchanger fabricated at workshop.
2. References.
2.1. Customer Specification
2.2. SPCC-SP10
3. Applicable Items
Air Receiver Tank.
4. Procedure
4.1. Surface Preparation.
4.1.1. Surface preparation shall be done in accordance with the Steel Structure Painting
Council Specification (SSPC-SP) 10 (near white metal blast cleaning).
4.1.2. Before abrasive blasting, all surfaces shall be dry and free from deposit of oil,
grease, or other contaminant.
4.1.3. The abrasive shall be clean and dry.
4.1.4. Blast cleaning shall not be carried out in conditions, which are caused to surface
condensation.
4.1.5. All blast cleaned surface shall be primed coat before rusting.
4.1.6. Welded areas shall be blast cleaned or ground to prevent sharp rough areas. Weld
reinforcement shall not be removed. And base metal shall not be ground below the
surface.
4.2. Painting condition.
4.2.1. Surfaces that will be coated shall be free of all dust, oil, grease and other
contaminants.
4.2.2. Coating shall not be applied when ambient temperature, steel temperature and
coating material temperature are out of the range recommended by the paint
manufacturer.
4.3. Painting application.
4.3.1. Paint application shall be in accordance with Paint Manufacturers recommendation.
4.3.2. Various factors such as painting interval, temperature, relative humidity, necessary
drying time, mixing, thinning ratio, and other technical matters are to be in
accordance with the Paint Manufacturers technical instruction and
recommendation. Painting shall be applied within 4 (four) hours after surface
preparation.
4.3.3. Airless spray shall be applied, however un-spray portion such as corner, hole and
touch-up for damage portion are to be applied by brush.
4.3.4. Painting work shall be performed in accordance with following condition:
4.3.4.1. Temperature of area minimum 10C and maximum 38C.
4.3.4.2. Relative humidity of area maximum 80 %.
4.3.5. Painting work shall not be carried out under following condition:
Page 2 of 4
4.3.5.1. Raining, strong wind, and dust condition.
4.3.5.2. Relative humidity is over than 80 %.
4.3.5.3. Temperature below than 10C or over than 38C.
4.3.6. Painting application shall refer to attached painting schedule.
Grade of surface SA 2
preparation
Area prepared and coated All of external surfaces.
Page 3 of 4
Table 2
Inorganic Zink
Type of coat Polyamide Epoxy Acrylic Polyurethane
Silicate
Orifice nozzle - - -
Applicable - - -
pressure
Dry air As manufacture As manufacture As manufacture spec
temperature spec spec
Pot life As manufacture As manufacture As manufacture spec
spec spec
Page 4 of 4