Professional Documents
Culture Documents
JSA For Demobilization Works
JSA For Demobilization Works
Action/
Step Who Or What Control Measures/
Description of Task Step Hazard Responsible
No. Might Be Harmed Recovery Measures
Party
1. Removal/demolition of Slip, trip and falls. Personnel injury. Follow method statement. TRAGS
existing chain link fence Sharp edges and sharp Equipment. Follow CPW.
and supports. objects. Adequate supervision.
Cuts, nips, due to Tool box talk prior to start the
unsafe and incorrect task.
handling of hand tools. Avoid unauthorised entry to the
Tripping hazard due to area.
cables. Provide signage for restrict
Dust (Inhalation ) unauthorised personnel to enter
Particles penetrating . area.
into the eye. Awareness shall be provided to
. the personnel who ever involved
in the activities.
JSA briefing shall be done prior to
the job along with the toolbox
talks.
Use appropriate personal
protective equipment (Hand
gloves, eye protection, and hard
hat).
Inform Client for approval before
start the job.
Action/
Step Who Or What Control Measures/
Description of Task Step Hazard Responsible
No. Might Be Harmed Recovery Measures
Party
2. Housekeeping and site Trip, slip and fall/struck Personnel injury. Housekeeping will be maintained TRAGS
clearance. by. in a good and orderly manner.
Keep the tools and equipments in
appropriate place.
Remove all tools and equipment
as soon as reasonably practicable
after usage