Date: 5/9/2017 NCR No:'NFPC- P02.

1-AFS-FF-NCR-0001-R00
Package: P02.1 - EXTERNAL FIRE-FIGHTING SYSTEMS
Project Name: NFPC Mega Plant- MILCO / LACNOR / OASIS Factory
FROM: NEB- National Engineering Bureau TO: CES General Contracting co.

Non Conformance Report


Site location / Area : Milco Factory Discipline: F.Fighting Work

Activity: Painting and Flashing for Pipes Initiated by: Eng. Nabeel Qutub

ENGINEER'S USE
Description of Non Conformance : During site visit, Mechical team have observed that the G.I Pipes is not painted by
redoxide (primer) before executing the final paint, also the flashing process should
be carried out before fixing the sprinker system, Al Rashidya is requested to do the
above and rectifing non conformance work.

ENGINEERS INITIATORS :
NAME : Nabeel Qutub - Eng. Esmail Salam DESIGNATION SIGNATURE DATE TIME
P.M. 5/Sep/2017 10 AM
Distribution: Contractor Engineer PMC Cost Consultant Employer File

CONTRACTORS RECEIVER
NAME : DESIGNATION SIGNATURE DATE TIME

CONTRACTORS ACTION TO REMEDY NON CONFORMANCE

CONTRACTORS INITIATOR
NAME : DESIGNATION SIGNATURE DATE TIME

SUPERVISED BY ENGINEER
NAME
DESIGNATION
TIME
Cheked by the Initiator:
Corrective action implimented Yes No
Completed and documented Yes No
Engineer comments :

NCR Status: Closed Not Closed Going on


Name: Date :
Closed by Engineer Designation: Time
Signature:
Distribution: Contractor Engineer PMC Cost Consultant Employer File
NAME: SIGNATURE: DATE:
Received by Contractor

Distribution: Contractor Engineer PMC Cost Consultant Employer File