ABSTRACT ESTIMATE
Approach road
1
Excavation including removal and satisfactory
disposal of all materials necessary for the
construction of road way and side drains in
accordance with specifications and the lines ,
grades and cross sections shown in the
drawings or as indicated by the Engineer for
Carted Eath with a lead of 8km for formation of
Approach Road.
210991
39.44 m3 5350.00
7 Providing and laying Bituminous Concrete
Grade-II using 0.13 cum of 19.00-9.50mm
graded metal, 0.17 cum of 9.50-2.36mm graded
metal and 0.26 cum of 2.36 and below metal by
adding the shredded plastic 6% of bitumen
quantity 3.02Kg (50.30x6%=3.02Kg) shredded
plastic waste over the aggregate heated in the
central hot mix plant mixed well with 47.28 Kgs
of VG30-40 grade bitumen for premixing per
10m2 to lay bituminous concrete including the
cost of materials to CMP site, heating the
bitumen and aggregate to the required
temperature and mixing in Central Hot Mix plant,
conveying the mix by tipper trucks to paver site,
spreading the mix to uniform thickness with
mechanical paver to the specified grades and
cross sections and consolidated by 80-100 kn
vibratory roller / pneumatic roller to the require
density etc. including labour for loading bitumen
into bitumen tank and metal to feeder unit,
labour for attending to paver to site etc.,
including hire charges and fuel charges for CMP
with bitumen boiler, tipper trucks, paver finisher /
vibratory / pneumatic roller and all other tools
and plants required, including fuel and all other
incidental charges etc. complete as per
specification using CMP as per clause 507 of
MORTH Rev-5 and IRC SP 98-2013.
23.66 /MT 157356
m3 6650.00
Sub total = 1077013
Sl. Measurement
Description No Qty Unit
No L B D
0.5/2
1 x 1 20.000 12.900 0.250 64.50
(14.8+11.0)/2
1 x 1 25.000 12.900 0.500 161.25
1 x 1 80.000 12.900 0.500 516.00
Deduct GSB -177.81
Deduct WMM -158.56
405.38 m3
Providing and Laying Granular Sub base as per table No 400-1/400-2 and
Grading III of MORTH Revision IV with and any other Granular material or a
2 combination those of for 150 mm thick to give a CBR of 20 on prepared sub
grade in accordance with the requirements of the specifications For Aggregate
Mix
Providing and laying Wet Mix Macadam Base Course 0f 250mm thickness in
two layers of 125mm each or else as specified on the prepared sub-Base with
graded stone aggregate and granular materials of quality size and grading
placed in layers as specified including mixing in Base mix plant,spreading in
3 nuiform layer in motor grader and compacting with Vibrating Roller of 80 to
100kN static weight and ffine dressing for required grade and cross slope as
shown on the drawing,equipment safety measures, testing and incidentals
necessary to complete the work as per Technical Specification Clause 406 and
as directed by Engineer.
Proivding and applying tack coat with Bitumen Emulsion (RS-1) Emulsion
distributor at the rate of 0.25kg/sq.m on the prepared Surface & cleaned
5
with Hydraulic broom as per Technical Specification clause 503 and as
directed by the Engineer - in - charge
Providing and laying Bituminous Concrete 30mm thick which shall consist of
construction of single course on a previously prepared bitumenous base to the
7
requirement of the specfication in cclause 511 of MORT&H using crumb
rubber modified bitumen 55 grade etc., complete.
3.48
0.90
3 #VALUE! #VALUE! 3 12 130 #VALUE! #REF! #VALUE! 0.888 #VALUE!
#REF!
4
4 Bar not used
0.2 #REF!
#REF!
6 #VALUE! 6 12 180 #VALUE! #REF! #VALUE! 0.888 #VALUE!
0.20 0.2
7
7 Bar not used
17
17 Bar not used
18 0.15 18 10 150 1.092 #VALUE! #VALUE! 0.617 #VALUE!
0.45
2.60
20 1.30 20 10 150 4.207 #VALUE! #VALUE! 0.617 #VALUE!
1.1 1.556
0.20
2.60
#VALUE!
#VALUE!
(or) #VALUE!