01 Ground Floor Plan Fire Fighting System: Issued For
01 Ground Floor Plan Fire Fighting System: Issued For
Stages Date
FOR CONSTRUCTION 2016.05.05
1 2 3 4
CO2 ABC
N
Key Plan :
CO2
ABC
5.5M
ROAD
B
Check all measurements on site. Do not scale
off drawing This drawing is to be read in
conjunction with the Specification and any
discrepancies are to be immediately reported
GFL:0.000 to the Architect. This drawing remains the
copyright property of the Architect and is not
H=297.38 to be reproduced in whole or in part without
CO2 ABC permission of the Architect.
FIRE HOSE
Beijing Zhongrui Electronics System Engineering
Design Institute Co.,Ltd
CO2 ABC No. 74 Lugu Road Beijing
Tel: +010 68609588 Fax: +010 68633784
FHR Web: WWW.ESEDI.CN
A Project Title:
2nd GENERATION FIBER OPTICAL
& CABLING PRODUCTION AND
FIRE PIPE/DN 50/GI SPECIAL FIBER R&D BASE PROJECT
F F F F F F F F
EL.-0.700 BOP Location:
A
CONNECT FROM UPC SITE OFFICE Building Number : 99-02
8908
TEMPORARY
UPC SITE RESTAURANT
5300 3608
M.E.P DRAWINGS
Drawing Title :
APPROVAL TO PROCEED
MEP PRINCIPAL