ALPHA DRIVES PREVENTIVE MAINTENANCE SCHEDULE CUM RECORD Revision/Date 00/01.06.2016
Machine Name Horizontal Machining Center Machine No. Month & Year July 2016
Daily
5 Check LAVISA Super 90 Coolant oil level.
6 Open AC air Filter & clean with air.
7 Check any Tools are damaged
8 Clean dirt, chips in the Fixture.
9 Check any loose or damaged parts in Fixture.
Remarks if any
Operator sign
To be done on first working day of every week Week 1 Week 2 Week 3 Week 4
10 Remove filter from Coolant tank & remove dust / dirt using air
11 Clean chips, dirt in bottom side of Chip Conveyor
12 Clean Tool pockets using dry cloth
Weekly
- Checked and found OK X - Checked and found not OK. Details to be recorded in this sheet