2.0 Kos Kerja Kerja Am

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

2.

0 KOSKERJAKERJAAM

2.1 PERATUSANKOSKERJAAM(GENERALITEMS)KEATASKOSKERJAPEMBINAMengikutButiranTerperinci

*PURATA&JULAT
BIL KETERANGANKERJA UNIT PURATA&JULATHARGABAGITAHUN(%) KESELURUHAN(%)
2008 2009
Purata Julat Purata Julat Purata Julat

A ContractualRequirement
1 Contractor'sAllRisk 0.53 0.111.09 0.54 0.201.09 0.50 0.111.09

2 InsuranceOfWorks 0.40 0.080.90 0.34 0.140.90 0.40 0.080.90

3 PerformanceBond 0.62 0.201.23 0.60 0.201.23

4 Perkeso/SOCSO 0.18 0.030.45 0.18 0.100.27 0.20 0.030.45

5 PublicLiabilityInsurance 0.34 0.160.57 0.35 0.160.57 0.40 0.160.57

B Engineer/SO/PD'sRequirement
1 Establishment&RemovalOfSO'sSite 0.67 0.341.29 0.68 0.560.82 0.70 0.341.29
Office

2 Establishment,Maintenance&Removal 0.96 0.242.95 0.36 0.240.51 0.70 0.242.95


OfSO'sSiteOffice

3 MaintenanceOfSO'sSiteOffice 0.43 0.011.30 0.57 0.011.30 0.50 0.011.30

4 LaboratoryEquipment 0.15 0.15 0.15 0.15 0.20 0.20

5 Pre&PostSurvey 1.38 0.066.48 0.98 0.971.00 1.20 0.066.48

6 Preparation&SubmissionOf'AsBuilt 0.33 0.001.67 0.29 0.000.57 0.30 0.001.67


Drawings'

7 ProgressPhotographs 0.06 0.010.33 0.09 0.020.33 0.10 0.010.33

8 ProgressReport 0.13 0.020.33 0.16 0.080.33 0.20 0.020.33

9 ProjectSignboard 0.18 0.050.45 0.20 0.050.45

10 SettingOut 0.57 0.152.04 0.60 0.170.82 0.60 0.152.04

11 SurveyingEquipment 1.26 0.102.92 1.30 0.102.92

12 Testing&Sampling 0.14 0.120.16 0.14 0.120.16 0.20 0.120.16

13 WorkProgramme 0.07 0.010.13 0.10 0.10 0.10 0.010.13

*PurataKeseluruhan(%)(roundedup)yangditetapkan 5
2.0 KOSKERJAKERJAAM

2.1 PERATUSANKOSKERJAAM(GENERALITEMS)KEATASKOSKERJAPEMBINAMengikutButiranTerperinci

*PURATA&JULAT
BIL KETERANGANKERJA UNIT PURATA&JULATHARGABAGITAHUN(%) KESELURUHAN(%)
2008 2009
Purata Julat Purata Julat Purata Julat

C Contractor'sRequirement
1 Clearing&CleaningUpUponCompletion 0.2 0.050.39 0.16 0.070.33 0.20 0.050.39

2 Establishment,Maintenance&Removal 0.44 0.150.75 0.44 0.190.66 0.50 0.150.75


OfContractor'sOffice

3 Establishment,Maintenance&Removal 0.59 0.081.63 0.75 0.161.63 0.70 0.081.63


OfContractor'sOffice,Workmen
Accommodation,Storeetc

4 Establishment,Maintenance&Removal 0.34 0.150.61 0.40 0.150.61


OfWorkmen'sAccommodation

5 Moblization&DemobilizationOf 1.16 0.324.63 1.20 0.324.63


ConstructionPlant&Equipment

6 SiteAgent 1.01 0.231.79 1.79 1.79 1.40 0.231.79

7 TemporaryWorks 1.07 0.074.62 0.87 0.072.10 1.97 0.074.62

*PurataKeseluruhan(%)(roundedup)yangditetapkan 6