This document provides quantity calculations for two items of Portland cement concrete pavement (PCCP) work for a road construction project in Basilan, Philippines. Item 1 is for 44,592.71 square meters of PCCP for the roadway section. Item 2 is for 12,649.34 square meters of PCCP at selected shoulder sections. The total quantity of PCCP calculated is 57,242.05 square meters. The calculations are attached and the document has been reviewed and approved by representatives of the contractor, consultant, and Department of Public Works and Highways.
This document provides quantity calculations for two items of Portland cement concrete pavement (PCCP) work for a road construction project in Basilan, Philippines. Item 1 is for 44,592.71 square meters of PCCP for the roadway section. Item 2 is for 12,649.34 square meters of PCCP at selected shoulder sections. The total quantity of PCCP calculated is 57,242.05 square meters. The calculations are attached and the document has been reviewed and approved by representatives of the contractor, consultant, and Department of Public Works and Highways.
This document provides quantity calculations for two items of Portland cement concrete pavement (PCCP) work for a road construction project in Basilan, Philippines. Item 1 is for 44,592.71 square meters of PCCP for the roadway section. Item 2 is for 12,649.34 square meters of PCCP at selected shoulder sections. The total quantity of PCCP calculated is 57,242.05 square meters. The calculations are attached and the document has been reviewed and approved by representatives of the contractor, consultant, and Department of Public Works and Highways.
CENTRAL OFFICE Manila CP 3B-Na: Construction/Improvement of Basilan Circumferential Road Canas - Maluso - Isabela Section Station 88 + 203.36 to Station 132 + 000 (with exceptions) CONTRACTOR : M. ABUBAKAR CONSTRUCTION AND ENGINEERING, INC AS - STAKED CONSULTANT : DESIGN SCIENCE INCORPORATED IN ASSOCIATION WITH ENGINEERING BASES OFFICE FOR CIVIL ENGINEER
DETAILED QUANTITY CALCULATIONS
ITEM 311 - PORTLAND CEMENT CONCRETE PAVEMENT
NO. DESCRIPTION QUANTITY REMARKS
See Attached Quantity
1 PCCP for Roadway Section 44,592.71 Calculations
See Attached Quantity
2 PCCP at Selected Shoulder Sections 12,649.34 Calculations
TOTAL 57,242.05
Submitted : Checked : Reviewed : Concurred :
MICHAEL R. ABUBAKAR GINO C. GALICINAO LEONARDO R. ENRIQUEZ MELCHOR T. ANQUILLANO