Plot No 997,
Inf0@aesl.co.tz
SEAP ID No: 0142/17 QUARTER REPORT I

ACKNOWLEDGEMENT

Firstly, I thank almighty God for helping me being a part of the structured Engineering
Apprenticeship Programme (SEAP) as a trainee.
I would like to also pass my sincere gratitude to the Engineers Registration Board (ERB)
for granting me a chance to undertake Structured Engineers Apprenticeship Programme
(SEAP)
I cannot forget to thank management of ADVANCED ENGINEERING SOLUTION,
AES, under Eng. GERALD MAREGESI, who is company Managing Director (MD) for
granted me the opportunity to undergo training at his company.
Lastly, I pass my special thanks to all staffs at ADVANCED ENGINEERING
SOLUTION for their contribution and support during my training.

TABLE OF CONTENTS

ACKNOWLEDGEMENT .............................................................................................. i

TABLE OF CONTENTS................................................................................................ i
i
SEAP ID No: 0142/17 QUARTER REPORT I

ABBREVIATIONS AND ACRONYMS ...................................................................... ii

1.0 INTRODUCTION .................................................................................................... 1

General........................................................................................................................1

Report Layout .............................................................................................................1

2.0 DETAILS OF TRAINING AGREEMENT ........................................................... 2

3.0 TRAINING SCHEME ............................................................................................. 3

4.0 RECORD OF TECHNICAL AND PROFESSIONAL EXPERIENCE ............. 4

5.0 DETAILS OF THE PROJECTS ............................................................................... 5

5.1 INTRODUCTION ...........................................5 .


5.2 DESIGN PROCEDURE ................................ 6
5.3 DESIGN INFORMATION AND SELECTION OF
STANDARD..7. .
5.4 CHALLENGES FACED AND SOLUTIONS TAKEN DURING THE
TRAINNING.8

6.0 CONCLUSION....................................................................................................... 10

APPENDICES .............................................................................................................. 11

APPENDIX I ................................................................................................................ 12

LOGBOOK...............................................................................................................12

APPENDIX II ............................................................................................................... 13

STRUCTURAL DETAILED DRAWINGS .............................................................13


ABBREVIATIONS AND ACRONYMS

BS: British Standard

CAD: Computer Aided Draft

ii
SEAP ID No: 0142/17 QUARTER REPORT I

ERB: Engineers Registration Board.

GoT: Government of Tanzania.

MD: Managing Director

SEAP: Structured Engineers Apprenticeship Programme.

RC: Reinforced Concrete

GE: Graduate Engineers

PE: Professional Engineer

iii
SEAP ID No: 0142/17 QUARTER REPORT I

1.0 INTRODUCTION

General
Structured Engineers Apprenticeship Programme (SEAP) was established in Tanzania
by Engineers Registration Board (ERB) with the views of helping Graduate Engineers to
become Professional Engineers.
This programme provides the opportunity to the graduate engineers to be trained within
three years with some relevant ERBs SEAP requirements and guidelines. Once a
graduate Engineer has met the terms and conditions will be accredited to Professional
Engineer by Engineers Registration Board (ERB).
This programme enables the graduate engineers to enter into job market with greater
confidence after completing the three years of training.
Also this programme needs the graduate engineers to prepare a quarterly reports to be
submitted to Engineers Registration Board (Tanzania) already signed and commented on
by the supervisor. The quarterly report was prepared to give an overview on the work
done in the three (3) months. This report covers the training undertaken at ADVANCED
ENGINEERING SOLUTION for the duration of three months from August, 2017 to
November, 2017 in the areas of Structural Design and Structural detailing of Reinforced
Concrete (RC) parts as listed below
Reinforced concrete slab
Reinforced concrete beams
Reinforced concrete columns
Pad foundation and strip footings

Report Layout
This report consists of six sections as stipulated in ERB Practical guideline.
Section One: Introduction of the report.
Section Two: Details of the Training Agreement
Section Three: Training scheme
Section Four: Record of Technical and Professional Experience
Section Five: Details of the Projects
Section Six: Conclusion

1
SEAP ID No: 0142/17 QUARTER REPORT I

2.0 DETAILS OF TRAINING AGREEMENT

Trainee: Emiliana Nkulizahe


Address: P.O.BOX 2085, Iringa
Mobile: +255 (0)653 103 000
Email: emmynkulizahe@gmail.com
Reg. No: GE 8724
SEAP ID: 0142/17

Training Organization:
ADVANCED ENGINEERING SOLUTION.
P.O.BOX 19074, Dar es Salaam
Tel: 255 784280010
Mikocheni B area, OFF COCACOLA ROAD
Plot No 997,
Inf0@aesl.co.tz

Training Supervisor: Eng. Gerald Maregesi


Address: ADVANCED ENGINEERING SOLUTION.
P.O.BOX 19074, Dar es Salaam
Tel: 255 784280010
Mikocheni B area, OFF COCACOLA ROAD
Plot No 997,
Inf0@aesl.co.tz

Period of Training: August ,2017 November, 2017

2
SEAP ID No: 0142/17 QUARTER REPORT I

3.0 TRAINING SCHEME


Summary of relevant ERB approved Training Scheme as per ERB Training guidelines
for civil engineering. All elements of SEAP training scheme covered in this period have
being highlighted accordingly.
a) Design office.
Project planning and appraisal including environmental impact assessment.
Tracing and checking of designs and drawings.
Knowledge and ability to judge on application of various design standard codes
of practices.
Development of design data assumptions, calculation, specifications and
drawings, including application of aided design (CAD)
Estimation of quantities and costs
Preparation of contract documents
Damage research, including trouble shooting, damage/failure analysis and design
of solutions to the damages/ failures.

b) Construction site
Setting out and surveying
Processing supply, scheduling utilization and recording of Materials, Labour and
Plant
Weighting and Batching.
Preparation and implementation of Work Schedules (programs)
Production of Building/Civil works components.
Quality control by field/Laboratory testing of materials and building/civil works
component
Measuring up works, costing and preparation of accounts
Use of explosives and Quarry operations.
Staff and labour relations

c) Maintenance
Infrastructure condition evaluation by visual inspection and equipment.
Design/planning of resultant maintenance interventions.
Development of work quantities and specifications
Processing supply, scheduling utilization and recording of materials, labour and
plant
Preparation and implementations of work programs
Measurement and costing of the work
Quality Control
Staff and labor relations
d) General Management
3
SEAP ID No: 0142/17 QUARTER REPORT I

General office routines/administration


Organization structures and their translation in practice.
Communication skills
Staff regulations and labor laws
Materials/equipment procurement, management, storage and handling
Safety practices at site
Production planning and control resources (labour, equipment, material, funds)
Tendering procedures including tender preparation and tender evaluation
Knowledge of various types of contracts and the applicable conditions of contract
Contract administration
Quality management

4
SEAP ID No: 0142/17 QUARTER REPORT I

4.0 RECORD OF TECHNICAL AND PROFESSIONAL EXPERIENCE


PERIOD BRIEF DESCRIPTION OF TIME SPAN SUPERVISOR
WORKDONE IN MONTH

Traffic count performance at Kilombero


bridge
August 2017 The elements involved were:
to September Traffic count data collection
2 Weeks Eng. Maregesi
2017 Traffic count data analysis
Report writing on traffic data
analyzed

Designing and preparation of detailed


structural drawings for upgrading of
September
KONGWA NMB TO MLANGA ROAD
2017 to
October 2017 The elements designed and detailed were 2 Weeks Eng. Maregesi
Pavement design
Geometric design
Structural design

Traffic count performance at Kilombero


bridge
The elements involved were:
Traffic count data collection
October 2017
Traffic count data analysis
to November
2017 Report writing on traffic data 2 Weeks Eng. Maregesi
analyzed
OD survey data performance

PTSs Comments
---------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------
5
SEAP ID No: 0142/17 QUARTER REPORT I

........
Supervisors signature

Date.
5.0 DETAILS OF THE PROJECTS

5.1 INTRODUCTION

This Chapter describe briefly the projects stated in the previous chapter, the project
discussed in this chapter include, Design of Reinforced Concrete structure and
preparation of Expression of Interest.
5.1.1 PROJECT - 01
Traffic count performed at KILOMBERO BRIDGE
5.1.1.1 Objectives
This project was given to me and to be performed hence to know the traffic load crossing
the bridge in order to be capable to design pavement layers and strength of the materials.
The tasks were to carry out traffic count activity and after that analysing the data found
from traffic count data and writing a report.
5.1.1.2 Technical Descriptions
The traffic count data performed at Kilombero Bridge was aimed to provide the traffic
class load of the road so that to be assured with the traffic load class predicted during the
design. During traffic count data were collected where by data were entered on the sheet
showing all vehicle type classification.
The task involved the collection of data for seven days here by 3 days were done for
24hours and other four days were done for twelve hours.
After data collection those data were to be analysed by the guide of pavement manual
and geometric design manual so as to obtain the traffic load class.
After data analysis then report was written was done by following all the good skills on
writing the official report.

5.1.1.3 My roles and participation


In this project my roles and participation included;
Performing traffic count(data collection)
Analyzing the data found from traffic count
Designing the Traffic Load Class depending on the results found from data
collected and analyzed.
Writing a good report on Traffic count at Kilombero Bridge.
6
SEAP ID No: 0142/17 QUARTER REPORT I

Providing any required technical advice on Traffic load at Kilombero Bridge.

5.1.1.4Technical knowledge and experience achieved


Through involvement as Traffic Engineer, I was able to achieve the following
professional experiences;
Knowing all the skills on how to perform traffic count
Gaining knowledge on data analysis of traffic count data as guided by pavement
design manual and geometric design manual
To know how good report on a task should be well composed

5.1.1.5 Challenges encountered


Rainfall during the task of counting traffic

5.1.2 PROJECT 02
DESIGN OF UPGRADING OF NMB KONGWA TO MLANGA ROAD TO
SURFACE DESSING LEVEL
5.1.2.1 Objectives
This project was given to me that I can prepare all the engineering drawings for the
project as structural engineer. Also as structural engineer I prepared all the detailing for
road structures and preparation of its bar bending schedule.
5.1.2.2 Technical Descriptions
The drawings were well prepared by the use of AutoCAD software.
5.1.23 My roles and participation.
In this project my roles and participation included;
Preparing Structural drawings.
Producing detailed structural drawings by using Auto CAD 2017.
5.1.2.4 Technical knowledge and experience achieved
Through involvement as Assistant Structural Engineer, I was able to achieve the
following professional experiences;
To know the quality required for structural drawings
Management of General office routines/administration.

5.1.3 PROJECT - 03

Traffic count and original and destination survey at MTWARAPACHANI TO


TUNDURU PROJECT ROAD.
5.1.3.1 Objectives
7
SEAP ID No: 0142/17 QUARTER REPORT I

This project was given to me and to be performed hence to know the traffic load crossing
the bridge in order to be capable to design pavement layers and strength of the materials.
The tasks were to carry out traffic count activity and after that analysing the data found
from traffic count data and writing a report.
5.1.3.2 Technical Descriptions
The traffic count was performed at MTWARAPACHANI TO TUNDURU ROAD and
was aimed to provide the traffic class load of the road so that to be assured with the traffic
load class hence to consider it during design. During traffic count data were collected
where by data were entered on the sheet showing all vehicle type classification on the
three different stations.
The task involved the collection of data for seven days here by 3 days were done for
24hours and other four days were done for twelve hours.
After data collection those data were to be analysed by the guide of pavement manual
and geometric design manual so as to obtain the traffic load class.
After data analysis then report was written was done by following all the good skills on
writing the official report.
Also original destination survey were performed at two different stations so that to get
number of vehicles which can divert to the new designed road.
5.1.3.3 My roles and participation
In this project my roles and participation included;
Performing traffic count(data collection)
Analyzing the data found from traffic count
Designing the Traffic Load Class depending on the results found from data
collected and analyzed.
Writing a good report on Traffic count at Kilombero Bridge.
Providing any required technical advice on Traffic load at Kilombero Bridge.
Performing ORIGINAL and DESTINATION survey
Analysis of OD data and report writing

5.1.3.4 Technical knowledge and experience achieved


Through involvement as Assistant Structural Engineer, I was able to achieve the
following professional experiences;
Knowing all the skills on how to perform traffic count
Gaining knowledge on data analysis of traffic count data as guided by pavement
design manual and geometric design manual
To know how good report on a task should be well composed

8
SEAP ID No: 0142/17 QUARTER REPORT I

Gaining knowledge of original and destination survey as its important on


pavement design procedures.
New knowledge on how to analyze OD survey data.

5.2 PREPARATION OF EXPRESSION OF INTEREST


During the training, as trainee I understand that EoI is the first procedure towards
delivering of application to the project developer for intention of providing services to
the advertised work requested expression of interest. The aim of this EoI was to inform
the clients our eligibilities, capacities and experience for the intended project.
In order to meet the clients requirements some consecutive activities were performed,
these are as listed below;
Preparation of the response statement as per advertised assignment. This
statement entails the existence of a firm (with supporting documents) willing to
execute the intended assignment.
Providing the documents to demonstrates illegibility of the company to deliver
such type of service
Updating and formulation of company profile that describe the recent, on-going
and completed projects of similar assignment.
Preparation of Curriculum Vitae (CV) of professional staff expected to execute
the intended assignment.
Providing the evidence of the invitation by attaching the copy of EoI advert.
5.2.1 Challenges and Solution made
Preparation of EoI is challenging task on meeting deadline and quality required to the
clients satisfactory. These challenges were solve by self-commitment.
Other challenges encountered were;
5.2.2 Lesson Learnt
I have learnt that the EoI is the selling documents towards shortlisted by client for
Request for Proposal (RFP). Hence it should be neatly, well organized and
understandable.

9
SEAP ID No: 0142/17 QUARTER REPORT I

6.0 CONCLUSION

+During these three (3) months of the training, I was able to acquire the skills and
knowledge on:
Load estimation
Load analysis
Structural design
Structural engineering drawings preparation
Structural engineering detailing preparation
Traffic count and Original and Destination survey performance.
More knowledge on application of AutoCAD
Project report preparation
Reinforcements detailing of structural members by using AutoCAD
Preparation of Expression of Interest (EoI)
Generally the training gave me the opportunity of transferring theoretical knowledge
gained at college into real life practices in designing industry. Also it exposed to various
structural design challenges which needs creativity and cooperation which brings us to
work as team on solving the encountered problems.

ct
PTSs Comments

---------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------

........
Supervisors signature

10
SEAP ID No: 0142/17 QUARTER REPORT I

Date.

APPENDICES

11
SEAP ID No: 0142/17 QUARTER REPORT I

APPENDIX I

LOGBOOK

12
SEAP ID No: 0142/17 QUARTER REPORT I

APPENDIX II

STRUCTURAL DETAILED DRAWINGS

13
THE UNITED REPUBLIC OF TANZANIA
ENGINEERS REGISTRATION BOARD
STRUCTURED ENGINEERS APPRENTICE PROGRAMME
TRAINEES DAILY LOGBOOK
Week No: 1
DAY/DATE JOB DESCRIPTION HOURS
Monday
Training on how to prepare expression of interest for a project 9
14/08/2017
Tuesday No work
9
15/08/2017
Wednesday
Traffic count performance at Kilombero bridge- Morogoro 24
16/08/2017
Thursday
Traffic count performance at Kilombero bridge- Morogoro 24
17/08/2017
Friday Traffic count performance at Kilombero bridge- Morogoro
24
18/08/2017
Saturday Traffic count performance at Kilombero bridge- Morogoro 24
19/08/2017
Sunday Traffic count performance at Kilombero bridge- Morogoro 12
20/08/2017

PTS Comments:
........

Signature:. Date: ............ Stamp:


THE UNITED REPUBLIC OF TANZANIA
ENGINEERS REGISTRATION BOARD
STRUCTURED ENGINEERS APPRENTICE PROGRAMME
TRAINEES DAILY LOGBOOK
Week No: 2
DAY/DATE JOB DESCRIPTION HOURS
Monday
Traffic count performance at Kilombero bridge- Morogoro
12
21/08/2017
Tuesday
Traffic count performance at Kilombero bridge- Morogoro 12
22/08/2017
Wednesday
Analysis and Designing traffic load class from traffic count data of Kilombero bridge. 9
23/08/2017
Thursday
Analysis and Designing traffic load class from traffic count data of Kilombero bridge. 9
24/08/2017
Friday
Report writing on Traffic count analysis result of Kilombero bridge traffic count. 9
25/08/2017
Saturday 9
26/08/2017 Report writing on Traffic count analysis result of Kilombero bridge traffic count.
Sunday No work
27/08/2017

PTS Comments:
........

Signature:. Date: ............ Stamp:


THE UNITED REPUBLIC OF TANZANIA
ENGINEERS REGISTRATION BOARD
STRUCTURED ENGINEERS APPRENTICE PROGRAMME
TRAINEES DAILY LOGBOOK
Week No: 3
DAY/DATE JOB DESCRIPTION HOURS
Monday
Report writing on Traffic count analysis result of Kilombero bridge traffic count. 9
28/08/2017
Tuesday
Site supervision at Kilombero bridge, supervision on finishing activities. 9
29/08/2017
Wednesday
Site supervision at Kilombero bridge, supervision on finishing activities 9
30/08/2017
Thursday
Material test and supervision on construction of accesses roads at Kilombero bridge. 9
31/08/2017
Friday
holiday. 9
1/09/2017
Saturday 9
2/09/2017 Review of engineering drawing of bukoba project
Sunday No work
3/09/2017

PTS Comments:
........

Signature:. Date: ............ Stamp:


THE UNITED REPUBLIC OF TANZANIA
ENGINEERS REGISTRATION BOARD
STRUCTURED ENGINEERS APPRENTICE PROGRAMME
TRAINEES DAILY LOGBOOK
Week No: 4
DAY/DATE JOB DESCRIPTION HOURS
Monday
Review of engineering drawing of bukoba project 9
4/09/2017
Tuesday
Review of engineering drawing of bukoba project 9
5/09/2017
Wednesday
Engineers day preparation at Dodoma 9
6/09/2017

Thursday Engineers day at Dodoma


9
7/09/2017

Friday
Engineers day 9
8/09/2016
Saturday No work 9
9/09/2017
Sunday No work
10/09/2017

PTS Comments:
........

Signature:. Date: ............ Stamp:


THE UNITED REPUBLIC OF TANZANIA
ENGINEERS REGISTRATION BOARD
STRUCTURED ENGINEERS APPRENTICE PROGRAMME
TRAINEES DAILY LOGBOOK
Week No: 5
DAY/DATE JOB DESCRIPTION HOURS
Monday
No work performed 9
11/09/2017
Tuesday
Review ad practice of BOQ preparation 9
12/08/2017
Wednesday
Review ad practice of BOQ preparation 9
13/09/2017
Thursday
Review ad practice of BOQ preparation 9
14/09/2017
Friday
Review ad practice of BOQ preparation 9
15/09/2017
Saturday 9
16/09/2017 Review ad practice of BOQ preparation
Sunday
17/09/2017 No work

PTS Comments:
........

Signature:. Date: ............ Stamp:


THE UNITED REPUBLIC OF TANZANIA
ENGINEERS REGISTRATION BOARD
STRUCTURED ENGINEERS APPRENTICE PROGRAMME
TRAINEES DAILY LOGBOOK
Week No: 6
DAY/DATE JOB DESCRIPTION HOURS
Monday
Preparation of Kongwa project engineering drawings.(all cross culverts and access culverts) 9
18/09/2017
Tuesday 9
Preparation of Kongwa project engineering drawings.(all drainage structures)
19/09/2017
Wednesday 9
Preparation of detailings and bar bending schedule for all road structures at Kongwa project.
20/09/2017
Thursday 9
Preparing of schedules for all road structures at Kongwa road project.
21/09/2017
Friday 9
BOQ preparation of Kongwa project
22/09/2017
Saturday Review of all Kongwa engineering drawings 9
23/09/2017
Sunday No work
24/09/2017

PTS Comments:
........

Signature:. Date: ............ Stamp:


THE UNITED REPUBLIC OF TANZANIA
ENGINEERS REGISTRATION BOARD
STRUCTURED ENGINEERS APPRENTICE PROGRAMME
TRAINEES DAILY LOGBOOK
Week No: 7
DAY/DATE JOB DESCRIPTION HOURS
Monday
No work. 9
25/09/2017
Tuesday
No work 9
26/09/2017
Wednesday
Site visiting at MTWARAPACHANI TO TUNDURU ROAD. 9
27/09/2017
Thursday
Site visiting at MTWARAPACHANI TO TUNDURU ROAD.
9
28/09/2017

Friday
Manual traffic count performance at MTWARAPACHANI TO TUNDURU ROAD.
24
29/09/2017
Saturday 24
30/09/2017 Manual traffic count performance at MTWARAPACHANI TO TUNDURU ROAD.
Sunday 24
1/10/2017 Manual traffic count performance at MTWARAPACHANI TO TUNDURU ROAD.

PTS Comments:
........

Signature:. Date: ............ Stamp:


THE UNITED REPUBLIC OF TANZANIA
ENGINEERS REGISTRATION BOARD
STRUCTURED ENGINEERS APPRENTICE PROGRAMME
TRAINEES DAILY LOGBOOK
Week No: 8
DAY/DATE JOB DESCRIPTION HOURS
Monday
Manual traffic count performance at MTWARAPACHANI TO TUNDURU ROAD. 12
2/10/2017
Tuesday
Manual traffic count performance at MTWARAPACHANI TO TUNDURU ROAD. 12
3/10/2017
Wednesday
Manual traffic count performance at MTWARAPACHANI TO TUNDURU ROAD. 12
4/10/2017
Thursday
Manual traffic count performance at MTWARAPACHANI TO TUNDURU ROAD.
12
5/10/2017

Friday
Performance of Original and Destination survey (OD survey) at TUNDURU STATION
12
6/10/2017
Saturday Performance of Original and Destination survey (OD survey) at TUNDURU STATION 12
7/10/2017
Sunday
8/10/2017

PTS Comments:
........

Signature:. Date: ............ Stamp:


THE UNITED REPUBLIC OF TANZANIA
ENGINEERS REGISTRATION BOARD
STRUCTURED ENGINEERS APPRENTICE PROGRAMME
TRAINEES DAILY LOGBOOK
Week No: 9
DAY/DATE JOB DESCRIPTION HOURS
Monday
Performance of Original and Destination survey (OD survey) at MTWARAPACHANI 9
9/10/2017
Tuesday
Performance of Original and Destination survey (OD survey) at MTWARA PACHANI STATION 9
10/10/2017
Wednesday
Performance of levelling survey at MTWARAPACHANI TO TUNDURU ROAD. 9
11/10/2017
Thursday
No work. 9
12/10/2017
Friday
Site visiting at MLOWO to KAMSAMBA road at SONGWE. 9
13/10/2017
Saturday No work.
14/10/2017
Sunday
15/10/2017

PTS Comments:
........

Signature:. Date: ............ Stamp:


THE UNITED REPUBLIC OF TANZANIA
ENGINEERS REGISTRATION BOARD
STRUCTURED ENGINEERS APPRENTICE PROGRAMME
TRAINEES DAILY LOGBOOK
Week No: 10
DAY/DATE JOB DESCRIPTION HOURS
Monday
Report writing on site visit conducted at MLOWO TO KAMSAMBA ROAD, SONGWE.
9
16/10/2017
Tuesday
Analysis of Original and Destination Survey (OD SURVEY) data of MTWARAPACHANI TO
9
TUNDURU ROAD for traffic road design.
17/10/2017
Wednesday
Report writing on data analyzed from original and destination survey conducted at
9
MTWARAPACHANI TO TUNDURU ROAD
18/10/2017
Thursday
Analysis of Manuel traffic count data of MTWARA PACHANI TO TUNDURU road for traffic road
9
design.
19/10/2017
Friday Continuation of analysis of Manuel traffic count data and start of report writing on Manuel traffic
count data. 9
20/10/2017
Saturday Report writing on Manuel traffic count of vehicles at MTWARAPACHANI TO TUNDURU ROAD. 9
21/10/2017
Sunday
22/10/2017

PTS Comments:
........

Signature:. Date: ............ Stamp:


THE UNITED REPUBLIC OF TANZANIA
ENGINEERS REGISTRATION BOARD
STRUCTURED ENGINEERS APPRENTICE PROGRAMME
TRAINEES DAILY LOGBOOK
Week No: 11
DAY/DATE JOB DESCRIPTION HOURS
Monday Preparation of proposal for for consultancy services for feasibility study, detailed engineering
design and preparation of tender documents for upgrading of MLOWO TO KAMSAMBA road, 9
23/10/2017 R.548,130KM including CHITETE SPUR ROAD.
Continuation of Preparation of proposal for for consultancy services for feasibility study, detailed
Tuesday
engineering design and preparation of tender documents for upgrading of MOWO TO KAMSAMBA 9
24/10/2017 road, R.548, 130KM including CHITETE SPUR ROAD.
Wednesday Preparation of proposal for consultancy services for feasibility study and detailed engineering
design for new airport in MANYARA REGION. 9
25/10/2017
Thursday
NO WORK
9
26/10/2017
Friday
Preparation of drawings for Kilombero resident houses. 9
27/10/2016
Saturday Review of TOR for Sanza bridge-Singida design and box culvert expansion at Mabatini -Mwanza 9
28/10/2017
Sunday
29/10/2017

PTS Comments:
........

Signature:. Date: ............ Stamp:


THE UNITED REPUBLIC OF TANZANIA
ENGINEERS REGISTRATION BOARD
STRUCTURED ENGINEERS APPRENTICE PROGRAMME
TRAINEES DAILY LOGBOOK
Week No: 12
DAY/DATE JOB DESCRIPTION HOURS
Monday
Preparation of engineering drawings for extension of box culvert of Mabatini at
9
Mwanza region (layouts preparation and sections) and inception report review.
30/10/2017
Tuesday Preparation of engineering drawings for extension of box culvert of Mabatini at
Mwanza region (layouts preparation and sections) and inception report review. 9
31/10/2017
Wednesday
Preparation of engineering drawings for extension of box culvert of Mabatini at
9
Mwanza region (layouts preparation and sections) and inception report review.
01/11/2017
Thursday 9
Preparation of engineering drawings for extension of box culvert of Mabatini at
Mwanza region (layouts preparation and sections).
02/11/2017
Friday 9
BOQ preparation for Mabatini extension of box culvert at Mwanza.
03/11/2017
Saturday Training for global mapper software for hydrology design purpose 9
04/11/2017
Sunday
05/11/2017

PTS Comments:
........

Signature:. Date: ............ Stamp:


CLIENT CLIENT APPROVAL REVISION DESCRIPTION BY DATE CONSULTANT: PROJECT: TITLE: SCALE DESIGNED BY: SHAHAME, D DRAWING no:

001 SERVICE DUCTS TYPICAL DRAWN BY: NKUIZAHE, E


THE UNITED REPUBLIC OF TANZANIA DETAILED ENGINEERING DESIGN FOR
DIRECTOR RESPONSIBLE STANDARD DETAILS
KONGWA DISTRICT COUNCIL UPGRADING OF KONGWA NMB TO ULANGA GM/ED/SD-01/1
C:\Users\H_Paul\Desktop\tanroad logo.jpg FOR HIGHWAY DESIGN 1:50 CHECKED BY: MAREGESI, G
P.O.Box 57,DODOMA-TANZANIA ADVANCED ENGINEERING SOLUTIONS LTD ROAD;
Mikocheni B, off Coca cola Road, Plot No.997, (1km) TO BITUMEN STANDARD
SIGNATURE P.O.Box 19074, DAR ES SALAAM - TANZANIA APPROVED BY: MAREGESI, G
Tel. +255 779 505011
STAMP Email. info@aesl.co.tz Website: www.aesl.co.tz DATE: SEPT, 2017 SHEET No: 8 OF 29
FALL
OUTFALLREQUIRED
WHERE DRAIN
MIN.3.00
CU
T
SL
OP
E

CLIENT CLIENT APPROVAL REVISION DESCRIPTION BY DATE CONSULTANT: PROJECT: TITLE: SCALE DESIGNED BY: SHAHAME, D DRAWING no:
THE UNITED REPUBLIC OF TANZANIA 001 DETAILED ENGINEERING DESIGN FOR STANDARD DETAILS DRAWN BY: NKULIZAHE, E
KONGWA DISTRICT COUNCIL DIRECTOR RESPONSIBLE UPGRADING OF KONGWA NMB TO ULANGA CATCH WATER DRAIN
ROAD; GM/ED/CD-01/1
P.O.Box 57,DODOMA-TANZANIA C:\Users\H_Paul\Desktop\tanroad logo.jpg FOR HIGHWAY DESIGN 1:50 CHECKED BY: MAREGESI, G
ADVANCED ENGINEERING SOLUTIONS LTD (1km) TO BITUMEN STANDARD
Mikocheni B, off Coca cola Road, Plot No.997,
SIGNATURE P.O.Box 19074, DAR ES SALAAM - TANZANIA APPROVED BY: MAREGESI, G
Tel. +255 779 505011
Email. info@aesl.co.tz Website: www.aesl.co.tz DATE: SEPT, 2017
STAMP SHEET No: 7 OF 29
CLIENT CLIENT APPROVAL REVISION DESCRIPTION BY DATE CONSULTANT: PROJECT: TITLE: SCALE DESIGNED BY: SHAHAME, D DRAWING no:

001 DETAILED ENGINEERING DESIGN FOR PIPE CULVERT SINGLE DRAWN BY:
THE UNITED REPUBLIC OF TANZANIA FELIX, A
DIRECTOR RESPONSIBLE UPGRADING OF KONGWA NMB TO ULANGA CELL GENERAL LAYOUT
KONGWA DISTRICT COUNCIL KM/ED/CPC/GD-01/1
FOR HIGHWAY DESIGN ROAD; DETAILS; 1:25 CHECKED BY: MAREGESI, G
P.O.Box 57,DODOMA-TANZANIA
ADVANCED ENGINEERING SOLUTIONS LTD (1km) TO BITUMEN STANDARD CROSS CULVERT
Mikocheni B, off Coca cola Road, Plot No.997,
SIGNATURE P.O.Box 19074, DAR ES SALAAM - TANZANIA APPROVED BY: MAREGESI, G
Tel. +255 779 505011
STAMP Email. info@aesl.co.tz Website: www.aesl.co.tz DATE: SEPT, 2017 SHEET No: 9 OF 29
CLIENT CLIENT APPROVAL REVISION DESCRIPTION BY DATE CONSULTANT: PROJECT: TITLE: SCALE DESIGNED BY: DRAWING no:
SHAHAME, D
DETAILED ENGINEERING DESIGN FOR
THE UNITED REPUBLIC OF TANZANIA 001 DRAWN BY: NKULIZAHE, H
DIRECTOR RESPONSIBLE UPGRADING OF KONGWA NMB-MLANGA GENERAL WORKS FOR
KONGWA DISTRICT COUNCIL ROAD; KM/ED/AC/GW-01/1
FOR HIGHWAY DESIGN CONCRETE PIPE CULVERT 1:25 CHECKED BY: MAREGESI, G
P.O.Box 57,DODOMA-TANZANIA (1km) TO BITUMEN STANDARD
ADVANCED ENGINEERING SOLUTIONS LTD
Mikocheni B, off Coca cola Road, Plot No.997,
SIGNATURE P.O.Box 19074, DAR ES SALAAM - TANZANIA APPROVED BY: MAREGESI, G
Tel. +255 779 505011
STAMP Email. info@aesl.co.tz Website: www.aesl.co.tz DATE: SEPT, 2017 SHEET No: 16 OF 29
CLIENT CLIENT APPROVAL REVISION DESCRIPTION BY DATE CONSULTANT: PROJECT: TITLE: SCALE DESIGNED BY: DRAWING no:
SHAHAME, D

DETAILED ENGINEERING DESIGN FOR DRAWN BY: NKULIZAHE,E


THE UNITED REPUBLIC OF TANZANIA DIRECTOR RESPONSIBLE ACCESS CULVERT
UPGRADING OF KONGWA NMB-MLANGA
KONGWA DISTRICT COUNCIL FOR HIGHWAY DESIGN REINFORCEMENT DETAIL 1:25 GM/ED/AC/RD-01/1
ROAD; CHECKED BY: MAREGESI, G
P.O.Box 57,DODOMA-TANZANIA ADVANCED ENGINEERING SOLUTIONS LTD (1km) TO BITUMEN STANDARD
Mikocheni B, off Coca cola Road, Plot No.997,
SIGNATURE P.O.Box 19074, DAR ES SALAAM - TANZANIA APPROVED BY: MAREGESI, G
Tel. +255 779 505011
STAMP Email. info@aesl.co.tz Website: www.aesl.co.tz DATE: SEPT, 2017
SHEET No: 15 OF 29
B

1% 1%

CLIENT CLIENT APPROVAL REVISION DESCRIPTION BY DATE CONSULTANT: PROJECT: TITLE: SCALE DESIGNED BY: DRAWING no:
SHAHAME, D
THE UNITED REPUBLIC OF TANZANIA 001 NKULIZAHE,E
DRAWN BY:
KONGWA DISTRICT COUNCIL DIRECTOR RESPONSIBLE DETAILED ENGINEERING DESIGN FOR ACCESS CULVERT LAYOUT GM/ED/AC/PS-01/1
P.O.Box 57,DODOMA-TANZANIA FOR HIGHWAY DESIGN UPGRADING OF KONGWA NMB-MLANGA PLAN AND SECTION 1:25 CHECKED BY: MAREGESI, G
ADVANCED ENGINEERING SOLUTIONS LTD ROAD;
Mikocheni B, off Coca cola Road, Plot No.997, (1km) TO BITUMEN STANDARD
SIGNATURE P.O.Box 19074, DAR ES SALAAM - TANZANIA APPROVED BY: MAREGESI, G
Tel. +255 779 505011
STAMP Email. info@aesl.co.tz Website: www.aesl.co.tz DATE: SEPT, 2017
SHEET No: 14 OF 29
CLIENT CLIENT APPROVAL REVISION DESCRIPTION BY DATE CONSULTANT: PROJECT: TITLE: SCALE DESIGNED BY: SHAHAME, D DRAWING no:

THE UNITED REPUBLIC OF TANZANIA 001 DETAILED ENGINEERING DESIGN FOR DRAWN BY:
DROP INLETS DTEAIL PAUL, H
KONGWA DISTRICT COUNCIL DIRECTOR RESPONSIBLE UPGRADING OF KONGWA NMB-MLANGA
ROAD; KM/ED/DO-DI-O1/1
P.O.Box 57,DODOMA-TANZANIA FOR HIGHWAY DESIGN 1:25 CHECKED BY: MAREGESI, G
ADVANCED ENGINEERING SOLUTIONS LTD (1km) TO SURFACE DRESSING STANDARD
Mikocheni B, off Coca cola Road, Plot No.997,
SIGNATURE P.O.Box 19074, DAR ES SALAAM - TANZANIA APPROVED BY: MAREGESI, G
Tel. +255 779 505011
STAMP Email. info@aesl.co.tz Website: www.aesl.co.tz DATE: SEPT, 2017 SHEET No: 10 OF 29

You might also like