WELCOME

A SESSION ON
CYME
By
N.K.SHYAMSUNDER
CYME

z PSAF Power system analysis framework


z CYMTCC CYME time current co-ord.
z CYMVIEW Graphical Plot program
CYME - PSAF

z PSAF-FAULT:FAULT SYSTEM ANALYSIS


z PSAF-FLOW:LOAD FLOW ANALYSIS
z PSAF-MOTORSTART:MOTOR STARTING STUDY
z PSAF-STAB:TRANSIENT STABILITY ANALYSIS
z PSAF-HARMO:HARMONIC ANALYSIS (NOT
AVAILABLE)
z PSAF-CYMTCC INTERFACE, Protective devices
Inputs for PSAF

z Final single line diagram


z Fix the bus nodes
Generator Details
Transformer Details
Induction load
Constant load
Largest motor to be started

z Type of Faults Decide in consultation with


client
CYME CREATE ONE LINE DIAGRAM-
ILLUSTRATION

z CLICK NEW STUDY FILE OPTION


z DIALOG BOX- LOADING NETWORK DATA- a) USE TABULAR FORMAT b)
SHOW ONE LINE DIAGRAM
z SELECT ONE LINE DIAGRAM
z NEW STUDY DIALOG BOX CLICK ON CREATING A NEW NETWORK
z SELECT DEFAULT BUS 1 IN THE DIALOG BOX
z SELECT THE CORNER TO ROTATE THE SLD
z DOUBLE CLICK ON THE LINE TO ENTER THE VOLTAGE PARAMETERS
z SELECT THE END OF THE BUS AND DRAG TO STRETCH THE BUS
z TO MOVE THE BUS LEFT CLICK HOLD THE BUS AND MOVE TO NEW
LOCATION.
z CREATE AS MANY BUSES AS REQUIRED TO CONNECT THE
EQUIPMENTS
CYME CREATE ONE LINE DIAGRAM-
ILLUSTRATION -GENERATOR

z SELECT GENERATOR ICON ON THE NETWORK EQUIPMENT SELECTION


TOOLBOX
z DOUBLE CLICK ON THE ICON TO ACCESS THE DATABASE DIALOGBOX
z TWO TABS PRESENT
z TAB-1 : ENTER DETAILS OF NAME PLATE DATA, MVAR LIMITS,WINDING
CONNECTION,POWER FACTOR, GROUNDING IMPEDANCE DATAS
REQUIRED FOR LOAD FLOW, SHORT CIRCUIT, MOTOR
STARTING,HARMONIC ANALYSIS.
z TAB-2 : DETAILS REQUIRED IF STABILITY ANALYSIS HAS TO BE
PERFORMED.
z TRANSIENT, SUBTRANSIENT REACTANCES AS AVAILABLE SHALL BE
PROVIDE DEPENDING ON THE TYPE OF GENERATOR USED
z H - INERTIA CONSTANT EXPRESSED IN SECONDS - REQUIRED FOR
STABILITY ANALYSIS TYPICALLY 1 H 9.
CYME CREATE ONE LINE DIAGRAM-
ILLUSTRATION-LOAD FLOW

z TWO DIALOG BOX STUDY AND SOLVE ICONS IN THE GUI


z OPEN TRBASECASE .STU STUDY FILE FROM FILE MENU
z SELCT POWER FLOW ANALYSIS FROM DROP DOWN BOX
z CLICK STUDY ICON
z ENTER THE STUDY NAME AND DESCRIPTION OF THE STUDY IN
THE TITLE
z ENSURE THE DATABASE FILE IS IN LINKED TO THE SAME
DIRCTORY
z CLICK ON LOAD FLOW PARAMETER TAB AND ENTER DETAILS
ACCORDINGLY
z IN THE REPORT TAB OPTIONS SELECT THE REPORT OPTIONS
LIKE VOLTAGE (p.u, v, kV), CURRENT ( pu, amp, ka), POWER (p.u,
kVA, mVA), POWER FACTOR (pu, %), AMPACITY (amp, kVA, mVA)
z REPORTS CAN BE EXPORTED TO EXCEL AND FORMATED.
Power Flow Analysis

z Load flow study determines how the electrical


system will perform during normal and emergency
operating conditions, providing the information
needed to:
z Optimize circuit usage
z Develop practical voltage profiles
z Minimize kW and kVar losses
z Develop equipment specification guidelines
z Identify transformer tap settings
POWER FLOW ANALYSIS

z Gauss Seidel
z Newton Raphson
z Fast Decoupled
SHORT CIRCUIT STUDY

z The short-circuit study calculates the short-


circuit capacity at designated locations within
the power delivery infrastructure.
z This data may also be utilized to select
equipment ratings and may serve as the
basis for protective device coordination
study.
FAULT LEVEL

z Planning the future configuration of the


power system.
z Safeguarding the Equipment
z Introducing new Equipment to restrict the
fault current at critical locations in the
network.
z Used with Protective device co-ordination
FAULT SYSTEM ANALYSIS - CYME

z In the short circuit dialog box in Generator


Impedances always select subtransient
z Fault report can be generated as below
Summary on all buses
Detailed on all buses
Detailed on selected bus
Global report on selected bus
Sliding fault along a line
FAULT SYSTEM ANALYSIS - CYME

z IEC AND ANSI


a) LLL FAULT- Required at all situations
b) LG FAULT Earth fault coordination
IEC
a) Initial Symmetrical fault
b) Peak current
c) Breaking current at different time intervals
d) Steady state current Relay co-ordinaton
MOTOR STARTING STUDY

z Voltage profile at various points


z The following parameters are to be provided
z Name plate data of motor
z Equivalent circuit parameters : R & X of rotor and stator
z Induction motor Mechanical load data : a) moment of inertia of
the rotating parts b) Slip torque characteristics
z Results can be plotted in CYMVIEW
z Different options of the report like Time vs Voltage, Current,
Power Factor, Torque can be generated.

z Run load flow prior to motor start


MOTOR STARTING STUDY

z Voltage profile at various points

z Run load flow prior to motor start


Transient Stability

z Planning the future configuration of the


power system.
z Adding large individual items of Dynamic
equipment eg. Large Ind. Motor or gen.
z Modifying the main interconnections within
the system
a) Critical switching time of CBs
b) Starting V.D & run up performance of large
motors
TRANSIENT STABILITY ANALYSIS

System disturbances due to


z Fault at buses
z Starting of largest motor
z Stopping of motor etc.

z Run load flow prior to transient stability.


EDSA & CYME

z EDSA
EXCEPT TRANSIENT STABILITY
ANALYSIS ALL OTHER PACKAGES IN
CYME ARE AVAILABLE IN EDSA.
Protective Device Coordination

z Making modifications in the system like


replacing outdated equipment
z To identify local problem areas for the
selection of suitable devices eg. Relays,
fuses, C.Bs etc.
CYMTCC

z Checks the coordination of the system and


enables in fixing the setting points in relay

z RUN SHORT CIRCUIT STUDY PRIOR TO


COORDINATION
RELAY CO-ORDINATION
FORMULA USED

z Moment of inertia = 0.04 x (kW)0.9 x (No of


Pole pairs)2.5 -as per IEC 34-12
z Torque in lb.ft = HP x 5250
rpm
z H = 2.31 x 10-10.(RPM)2.WR2
Machine MVA
Where Rotor WR2 = (Weight in lbs).(radius of gyration in feet)2
END

THANK YOU