Format No.

DAILY SURVEILLANCE REPORT


OBSERVATION MADE BY BAY DATE & TIME SHIFT

Welder Name and No


Job No Joint No
FIT UP
Thickness Total Weld length

WPS No:

WELDING PROCESS GMAW/SAW/SAW-Tandem


Joint Type Butt/Fillet
Joint Cleanliness/Condition

SPECIFIED ACTUAL OBSERVED


CONSUMABLE TYPE/SIZE

CONSUMABLE BRAND/BATCH

PREHEAT TEMP.(OC)

INTERPASS TEMP.(OC)

CURRENT (Amp)

VOLTAGE (Volt)
TRAVEL SPEED (SAW/AUTO
GTAW)
SHIELDING GAS FLOW (LPM) PURGING Y / N / NA

WELDING POSITION QLFD TO WELD? Y / N / NA


POST HEAT TEMP. OK / NOT OK/NA PORTABLE OVEN HOT? Y / N / NA
ELECTRODE/ROD STUB LENGTH OK? Y / N / NA IS STUB BIN AVAILABLE Y / N / NA
ANY ARC STRIKE Y / N / NA WELDER ID PUNCHED? Y / N / NA
WELDING CABLE/EARTHING LUG OK / NOT OK M/C CALIBRATED ? Y / N / NA
WELD BEAD APPEARANCE OK / NOT OK ELECTRODE BAKING Y / N / NA
CONFORMITY TO VITAL DOCUMENTS Y / N / NA ELECTRODE IDENTIFICA Y / N / NA
CONSUMABL
WELD MAP AVAILABLE ? Y/N E ISSUE SLIP Y/N
AVAILABLE?

DISCREPANCY (IF ANY)


CORRECTIVE ACTION TAKEN/ PROPOSED.

CORRECTION DONE Y / N / NA

Shop Supervisor Welding Engineer

Y-YES , N-NO , NA-NOT APPLICABLE