Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 13

634436

2000 71 142,000
1,420,000
2000 71 142,000
1,420,000
govt. -1,278,000
10+90 100

10 Nava
Wadaj

Ward
Zone Ward Contact Area (in
Sr. No Ward No Office
Name Name No sq.Kms)
Adress

Nr.
7 West 10 New Bharvad 27640179 3.42
Wadaj Vas
12,780,000 12,922,000 269800
1,292,200.00

90 0.0111111111 100 1
10 0.1 100 9

90 0.9

142000 0.1

90 0.000063
no l b qty
1 main two line 2 243.4 12 5,841.60
first line 1 158.21 12 1,898.52
kara 6 56 12 4,032.00
kara 6 56 12 4,032.00

sf 15,804.12
10.76
trimix smt 1,468.78 0.1 5000
0.20
pcc cmt 293.76
0.30
exc cmt 440.64
0.10
rmc 146.88

2 shuttering 4 243.4 0.1 97.36


2 158.21 0.1 31.64
12 56 0.1 67.20
12 56 0.1 67.20

sf 263.40
10.76
smt 24.48

3 paver 4 243.4 2 1,947.20


2 158.21 2 632.84
12 56 2 1,344.00
12 56 2 1,344.00

sf 5,268.04
10.76
smt 489.59

4 rmt 4 243.4 1 973.60


2 158.21 1 316.42
12 56 1 672.00
12 56 1 672.00

sf 2,634.02
3.76
smt 700.54
widht-two home hetal
two kara the tender
one home lenth
one home widht

734,392.19
Sr. Item
Unit
No. No.

1 2 3

1 1.01.a Cum

5 1.09 cum

9 1.14.a Cum

10 1.14.b Cum

11 1.14.c Cum

13 2.01.c Cum

14 2.01.d Cum
15 2.08 Kg

16 2.26.02 Cum

17 2.26.03 Cum

18 2.26.04 Cum

19 2.26.05 Cum

23 2.28a Rmt

24 2.28b Rmt

25 2.28c Rmt

26 2.28d Rmt

28 3.01.a Sqm.

77 9.45a Sqm

158 16.03 cum


37 4.12 Sqm.

38 4.13 Rmt.

39 4.16 Rmt.

75 9.26 Sqm

270 P54 No.

28 1.22 Rmt.

350 20.05 Sqm.


Item Of Work

EARTH WORKS.
Excavation for foundation / pits / raft / trenches / mass areas, basements, water tanks, septic tanks, soak wells, rain
water harvesting pit etc. for following depth, by mechanical or manual including sorting out and stacking of useful
materials, dressing of the sides, ramming of bottom, disposing of the excavated stuff up to 50 m. lead including lifts, for
all kind of soil, all complete as per drawing, specifications, instruction & directions of the Engineer-in-charge. For all civil,
plumbing, electrical & infrastructure works.
a) Upton 1.5 mtrs

Filling/Backfilling with available selected/approved excavated earth the quantity of earth stacked any inside the campus
(excluding rock and black cotton soil) in foundation, trenches, plinth & plot etc, in layers not exceeding 20 cm. in depth,
including breaking the clods, watering to optimum moisture content, ramming and compacting by mechanical means of
suitable type of vibrator, including freight, transportation, loading, unloading, screening, passes etc. all complete as
instruction & directions of the Engineer-in-charge (Consolidated measurements of fill shall be paid for under this item). The
rates shall include for all leads and lifts including transporting using mechanical / manual means within the campus area.
Note: Using excess available excavated earth from foundations and dressing of the plot area.

Disposing of the surplus excavated earth and/or debris etc. including all lifts and leads, loading at site, transporting by
mechanical or manual means & disposal, unloading, spreading, dressing and compacting etc. complete, all as per
specifications and direction of Engineer-in-charge. For disposing outside campus, non-objectionable place shall be found and
selected by the contractor. The rate shall also include for arranging dumping ground as approved by municipal / local
authorities, paying all statutory fees, obtaining disposal certificates and observing all statutory rules & regulations thereof
as required by the concerned authorities, keeping the site and approach roads neat and clean to the satisfaction of Engineer
- in - charge. a) Inside the campus as directed by Engineer in charge (200 mt. to 300 mt distance)

b) Outside the campus (Upto 0 to 5 KM)

c) Extra over and above item No. 1.14 (b) for disposing the earth and/or debris etc outside the campus for lead from 5 to
10KM.

CONCRETE WORKS PCC Providing and laying Plain Cement Concrete 1:4:8 (1 cement : 4 coarse river sand : 8 stone
aggregates - using 40 mm nominal size blck trap hard crushed stone aggregate obtained from approved quarry) including
compaction, finishing top surface to the required level curing including cost of formwork etc. complete as per specifications
and directions of Engineer - in - charge. Rate shall be for all size and shape in foundations, plinth, sub base of floors etc. for
all civil, plumbing, electrical & infrastructure works.(on site concrete - without pumping) a) Foundation, plinth, sub base of
floors etc.

Providing and laying Plain Cement Concrete 1:3:6 (1 cement : 3 coarse river sand : 6 stone aggregates - using 40mm
nominal size blck trap hard crushed stone aggregate obtained from approved quarry) including compaction, finishing top
surface to the required level curing including cost of formwork etc. complete as per specifications and directions of
Engineer - in - charge. Rate shall be for all size and shape in foundations, plinth, sub base of floors etc. for all civil,
plumbing, electrical & infrastructure works.(on site concrete - without pumping) a) Foundation, plinth, sub base of floors
etc.
Supplying, fabricating and placing / fixing in position TMT reinforcement bars FE-500 D (Ductile) of TATA or equivalent
(Min. elongation 14.5% as per relevant latest IS standards for manufacturing of reinforcement) confirming to IS-1786
reinforcement for RCC structures / items as per design including transporting steel to the work site, handling, de-coiling,
cutting-bending-cranking by machines, fabricating to required shape, placing in position and tying / binding the system with
MS 18 gauge wires, welding if necessary, keeping it in position during concreting by means of stays, blocks, ties, spacers,
chairs, hangars, etc. for all floors / all levels / all heights complete as per drawings, specifications and direction of Engineer
in Charge. Measurement will be paid on the length basis and converted into weight by using standard co-efficient (rolling
margin's and wastage shall not be paid). The quoted rate should be inclusive of the cost of Binding wire, and the same will
not be measured and paid separately. For all civil, plumbing, electrical & infrastructure works.

Providing and laying Ready Mixed Concrete as per mix design of specified grade in fully automatic batching plant as per
the design mix standards installed outside the campus (at nearest possible space)
and ...................................................................................................................................................
........................................................................................ scrupulously followed during the concreting. The
work shall be carried out at all heights / all places / all shapes / all elements. (viii) All design mix shall be based on OPC
cement only.
1) M15 Grade

2) M20 Grade

3) M25 Grade

4) M30 Grade

Providing in position PVC sleeves of 6kg/cm2 UPVC pipes of following diameters for taking out service pipelines, cables
etc. in slabs, beams, brickwork as per drawing in required level and gradient for all floors / all levels / all heights.
a) 50mm dia

b) 75mm dia

c) 110mm dia

d) 160mm dia

Centering & Form Works Providing form work of ordinary timber planking and/or shuttering plywood and /or steel plates
with supporting system of adjustable steel props and steel spans (purlin) so as to give smooth/ fair finish, including
centering, shuttering, strutting and propping, etc. complete, height of propping and centering below supporting floor to
ceiling not exceeding 5.0m., and removal of the same for in-situ reinforced concrete and plain concrete work, in
foundations, footings, bases of columns, retaining walls etc. and mass concrete. All concrete surfaces shall be fair finished
concrete.
Extra for carrying out vacuum dewatering & Power floater treatment in floors, well compacted, mechanically vibrated,
finished to required levels, floated with neat cement and power trowelled to get desired smooth finishing/broom finish,
over a leveling course, including MS shuttering, curing for 7 days etc complete. The reinforcement for Tremix floor to be
installed as shown shall be paid in relevant item. The suitable size of panel should be approximately 3.75 m x 5 m or as
directed by Engineer. The Construction joints to be formed at every 5m distance by grooving with mechanical saw within 48
hrs. Groove/sawed joints shall be made of 5 mm width and 25 mm depth min (1/3 rd depth of the pavement) as shown in
the drawing and shall be filled with ready to use PU sealant of UV grade which shall be paid in relevant item. The sawing
operation should be carried out as soon as concrete is ready to accept the saw cut without trowelling etc as directed by
Architect and Engineer-in-charge. The construction joint is formed by square edge and painted with bitumen. The rate shall
be inclusive of labour, grooves and machinery cost. Reinforcement , concrete and expansion joint shall be paid in relevant
tender item.
Demolition including stacking of serviceable materials and disposal or unserviceable materials with all leads and lifts : RCC
Works. (including surface finishes like plaster, paint , electrical fixtures conduits, clamps, inserts etc.)
Providing and fixing in expansion joints, 50mm thick - Capcell HD 100 Supreme or equivalent (Polyethylene foam filler) of
the best quality, including cutting to required size and shape, at all levels / all floors / all heights, etc. complete, as per
drawings / specification and / or as directed by Engineer in Charge.

Providing and filling the expansion joints, with polysulphide sealant/PU (UV grade of approved colour and make), including
cleaning, scraping the expansion filler materials from joints, repairing of the edges with polymer mortar for plaster & micro
concrete or epoxy mortar for concrete with necessary polyurethane bacor rod and abro tape on the sides to a line, etc.
complete as per sample approved & as directed. Expansion joint shall be tested for their watertight property & the same
shall be watertight for a period of five years. For all floors / all levels / all heights etc., complete and as per the direction
of EIC.
b) 50x25mm size
Providing and installing expansion joint / seismic joint treatment of vexcolt React 300 series or equivalent as per
manufacturer's specifications,recommendation and compitable for wall to wall, wall to corner and floor to floor,etc., for
100mm wide expansion joint. Sample shall be approved from the architect/EIC before procurement and installation. Rate
shall be inclusive of all surface preparation, as wells as materials, labour, scaffolding and wastages etc. at all heights, all
levels etc complete.

Providing and laying shot blasted interlocking/ Non- interlocking, Colored paver blocks of high density 60 mm thick M-40
grade for footpath, parking areas, service lanes and other areas as mentioned in the drawing. Including providing and laying
50 mm thick average bedding layer of coarse sand below paver block as per required grading and specification. Laid paver
block shall be mechanically compacted. The work of the paving blocks shall be executed in line and level by skilled mason o
flooring work only. It should be laid in such a way that the no cutting of the paver block to be necessary. Cutting of paver
block by machine cut only and laying to be done by skilled flooring mason. The Finished surface of the Paver Block shall have
Coarse Sand Texture Finish. Paver blocks shall be compacted and shall be re-laid if necessary.

Providing & fixing a precast fibre reinforced concrete frame & cover of specified size, shape & weight per manufacture with
suitable mild steel rims to prevent damaging of edges & provided with easy lifitng -hooks duly protected against corrosion of
approved make or equivalent including carting from store to site of work, fixing in CCM-15 and making good complete. For
carrying load up to 20.0 ton size of square frame of approx 830x830x150mm & round cover 75mm thickj OR round frame &
round cover as approved by Architect

Providing and filling the expansion joints, with polysulphide sealant, including cleaning, scraping the expansion filler materials from joints,
repairing of the edges with polymer mortar for plaster & micro concrete or epoxy mortar for concrete with necessary polyurethane bacor
rod and abro/ teflon tapes on the sides to a line, etc. complete as per sample approved & as directed. Expansion joist shall be tested for
watertight ness & the same shall be watertight for a period of five years. For all floors / all levels / all heights etc., complete and as per the
direction of EIC

Roadsurface Removal Removal of Existing bitumnous road surface including asphalt layers, metalling etc. till the depth up to natural earth
and to accomodate the paving item including subbase for new paving works. The rate includes carting, loading, unloading outside the
campus or to the R&B store as directed by the Engineer in charge.
T
e
n
d
e
r
e As per A As per AAs per
As per Estimate As per Tender
d Estimate m Tender mEstimate
Q Rate o o
Rate Qty
u u u Amount Amount
###
a 6 n
### 8 n
###
n t t
t
i
t
y
### 76.76
### 150.00
### 440.64 33,823 66,095

### 39.39
### 125.00
### 440.64 17,357 55,079

### 27.27
### 50.00
###

### 164.80
### 160.00
### 440.64 72,617 70,502

### 214.14
### 215.00
###

### 2,905.77
### 4,000.00
### 293.76 853,590 1,175,028

### 3,184.53
### 4,500.00
###
### 63.03
### 75.00
### 1,468.78 92,577 110,159

### 4,348.05
### 5,000.00
###

### 4,656.10
### 5,500.00
###

### 4,925.77
### 5,900.00
### 146.88 723,489 866,583

### 5,124.74
### 6,500.00
###

### 126.25
### 200.00
###

### 226.24
### 300.00
### 600.00 135,744 180,000

### 409.05
### 500.00
###

### 494.90
### 600.00
###

### 362.59
### 550.00
### 24.48 8,876 13,464

### 92.92
### 150.00
### 1,468.78 136,479 220,318

### 333.30
### 4,500.00
### - -
### 1,800.83
### 2,200.00
###

### 509.04
### 1,000.00
###

### 6,736.70
### 7,000.00
###

### 857.49
### 1,000.00
###

### 3,030.00
### 4,000.00
### 11.83 35,855 47,333

- -

### 485.87
### 450.00
### 300.00 145,761 135,000

### 2.52### 10.00### 1,468.78 3,701 14,688

2,259,870 2,954,248