Professional Documents
Culture Documents
Design
Design
TYP DENOTE
STEEL FRAMING PURLIN 3PN1 STEEL BEAM SCHEDULE IN mm (U.N.O)
MARK SIZE REMAKS
3HB1 3SG1
3R1 WF 200x100x6x9 RAFTER
3R-1
3R-1
3SB1 CNP 150x75x20x2.3 PURLIN
3R-1
3R-1
3R-1
3R-1
3R-1
3SG1 ROD 12 SAG ROD
3IHB1 ROD 16+TURN BUCKLE PURLIN
KEY PLAN
2000
L E G E N D &N O T E S
THE CONTENTS OF THIS DRAWING REMAIN THE INTELLECTUAL
PROPERTY OF PT MEINHARDT INDONESIA. REPRODUCTION OR
C1
C1
C1
C1
C1
C1
3S
3S
3S
3S
3FP1
3S
3S
UNAUTHORISED USE IS NOT PERMITTED EXCEPT WITH THE
WRITTEN AUTHORISATION OF PT MEINHARDT INDONESIA.
C1
3S
3P1
3400
3R-1
3R-1
3R-1
3R-1
3R-1
3R-1
3R-1
2
S.8-1-08
C1
C1
C1
C1
C1
C1
C1
3S
3S
3S
3S
3S
3S
3S
3 4 5 3 6
S.8-1-08
CFLD Indonesia
200
1000
6D13
DRAWING TITLE
4 MAIN BUILDING
1300
D10-150 S.8-1-08
ROOF FRAMING
ROAD LEVEL EL +0.000
GROUND FLOOR FRAMING VIP PARKING
EL 0.000 m
PLAN, SECTION, AND DETAILS
DISCIPLINE STRUCTURAL
C:\Users\Irfa\Documents\MI117521_A_PW_2016_irfa.rvt
D10-200 INITIAL SIGNATURE NO. JOB
JOB NO.
PLAN 3FP1 & 3P1 PERENCANA
DESIGNED
ER
117521
200
SCALE1 : 15
DIGAMBAR NBA
DRAWN
1000
DIPERIKSA AR NO. GAMBAR
CHECKED DRAWING NO.
D13-200
SECTION -3 DISETUJUI
SCALE 1 : 50
DETAIL 3FP1 & 3P1 FOR TENDER APPROVED
JH/ASM
S.8-1-08
SCALE1 : 15 REFERENCE DRAWINGS: DATE: SKALA As indicated
SCALE
ARCHITECTURAL BASEPLAN
UKURAN
SIZE
A1 ISSUE