Professional Documents
Culture Documents
CONSOLIDATION TEST (Time - Compression Data)
CONSOLIDATION TEST (Time - Compression Data)
Project : Consolidation
Location : Fakultas Teknik UI Sample No. :
Description of Soil : Depth of Sample (m) :
Tested By : R6 Date of Testing :
Settlement Data
Date
Load (kg) 1 2 4 8 16 32
kg/cm2 0.3157 0.6315 1.2630 2.5261 5.0522 10.1044
0.00 2757.00 2841.00 2977.00 3257.00 3625.00 4673.00
0.10 2802.00 2908.00 3030.00 3305.00 3887.00 4695.00
0.25 2805.00 2914.00 3081.00 3315.00 3899.00 4707.00
0.50 2806.00 2918.00 3085.00 3335.00 3927.00 4747.00
1 2808.00 2924.00 3089.00 3358.00 4213.00 4805.00
2 2810.00 2929.00 3095.00 3495.00 4265.00 4877.00
Loading
4 2818.00 2936.00 3101.00 3528.00 4314.00 4961.00
8 2821.00 2940.00 3106.00 3547.00 4355.00 5048.00
15 2824.00 2945.00 3112.00 3559.00 4382.00 5105.00
30 2827.00 2951.00 3116.00 3562.00 4402.00 5148.00
60 2831.00 2958.00 3126.00 3584.00 4418.00 5177.00
end 2841.00 2977.00 3257.00 3625.00 4673.00 5220.00
gr
gr
gr
gr
%
%
0.15133
Time Penurunan (10-3 mm)
Time
(minute)
1 kg % strain 2 kg % strain 4 kg % strain 8 kg % strain
0.00 0.00 2757.00 0.00% 2841.00 0.00% 2977.00 0.00% 3257.00 0.00%
0.10 0.32 2802.00 53.57% 2908.00 49.26% 3030.00 18.93% 3305.00 13.04%
0.25 0.50 2805.00 57.14% 2914.00 53.68% 3081.00 37.14% 3315.00 15.76%
0.50 0.71 2806.00 58.33% 2918.00 56.62% 3085.00 38.57% 3335.00 21.20%
1 1.00 2808.00 60.71% 2924.00 61.03% 3089.00 40.00% 3358.00 27.45%
2 1.41 2810.00 63.10% 2929.00 64.71% 3095.00 42.14% 3495.00 64.67%
3 1.73 2818.00 72.62% 2936.00 69.85% 3101.00 44.29% 3528.00 73.64%
8 2.83 2821.00 76.19% 2940.00 72.79% 3106.00 46.07% 3547.00 78.80%
15 3.87 2824.00 79.76% 2945.00 76.47% 3112.00 48.21% 3559.00 82.07%
30 5.48 2827.00 83.33% 2951.00 80.88% 3116.00 49.64% 3562.00 82.88%
60 7.75 2831.00 88.10% 2958.00 86.03% 3126.00 53.21% 3584.00 88.86%
1440 37.95 2841.00 100.00% 2977.00 100.00% 3257.00 100.00% 3625.00 100.00%
Beban 1kg Be
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 0.00 1.00 2.00 3.00
0.00% 0.00%
10.00% 10.00%
20.00% 20.00%
30.00% 30.00%
40.00% 40.00%
50.00% 50.00%
60.00% 60.00%
70.00% 70.00%
80.00% 80.00%
90.00% 90.00%
100.00% 100.00%
10.00% 10.00%
20.00%
20.00%
30.00%
40.00% 30.00%
50.00%
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 0.00 1.00 2.00 3.00
0.00% 0.00%
10.00% 10.00%
20.00%
20.00%
30.00%
40.00% 30.00%
50.00% 40.00%
60.00%
50.00%
70.00%
60.00%
80.00%
90.00% 70.00%
100.00% 80.00%
Time
(minute) delta H
1 kg
0.00 0
0.10 0
0.25 0
0.50 0
1 0
2 0
3 0
8 0
15 0
30 0
60 0
1440 0
16 kg % strain 32 kg % strain beban x 1.15x Akar t t90 (menit)
3625.00 0.00% 4673.00 0.00% 1 0.55 0.63 0.31 0.10
3887.00 25.00% 4695.00 4.02% 2 0.62 0.71 0.38 0.14
3899.00 26.15% 4707.00 6.22% 4 0.52 0.60 0.65 0.42
3927.00 28.82% 4747.00 13.53% 8 2.2 2.53 1.90 3.61
4213.00 56.11% 4805.00 24.13% 16 1.35 1.55 1.50 2.25
4265.00 61.07% 4877.00 37.29% 32 3.3 3.795 2.35 5.52
4314.00 65.74% 4961.00 52.65%
4355.00 69.66% 5048.00 68.56%
4382.00 72.23% 5105.00 78.98%
4402.00 74.14% 5148.00 86.84%
4418.00 75.67% 5177.00 92.14%
4673.00 100.00% 5220.00 100.00%
5183 5220
% 10.00%
%
20.00%
%
% 30.00%
%
% 40.00%
%
50.00%
%
% 60.00%
0% 10.00%
20.00%
0%
30.00%
0%
40.00%
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 0.00 1.00 2.00 3.00 4.00 5.00 6.00
0% 0.00%
0% 10.00%
20.00%
0%
30.00%
0%
40.00%
0% 50.00%
60.00%
0%
70.00%
0%
80.00%
0% 90.00%
0% 100.00%
Beban 4kg
3.00 4.00 5.00 6.00 7.00 8.00 9.00
Beban 32kg
3.00 4.00 5.00 6.00 7.00 8.00 9.00
3.00 4.00 5.00 6.00 7.00 8.00 9.00
CONSOLIDATION TEST (Computation Sheet for e and cv)
Project :
Location : Sample No. :
Description of Soil : Depth of Sample :
Tested By : Date of Testing :
Sample Data
61.092 cm 59.39 gr
3
Sample Volume (V) : Dry Wt of Soils (Ws) :
Ht of Soils (Hi) : 1.90 cm Ht of Solid (Ho) : 0.69 cm
Initial Ht of voids (Hv) : 1.21 cm Initial Void Ratio (eo) : 1.76
a
Final dial reading of preceding load = initial dial reading of following load
b
Average ht. for load increment = Ht. at beginning of load - H
H = length of longest drainage path; for floating ring consolidation = average ht. for given load increment
c
d
From the dial reading vs log t curves
1.50
1.45
1.40
1.35 1.34
1.32
1.30 1.28
id Rato (e)
1.25
1.23
1.20
loading
1.15
1.50
1.45
1.40
1.35 1.34
1.32
1.30 1.28
1.00
0.80
0.60
0.40
0.20
0.00
0.10 1.00 10.00 100.00
Pressure (kg/cm2)
1.2630 0.35
2.5261 0.04
5.0522 0.06
10.1044 0.02
5.0522 0.05
Unloading
2.5261 0.03
1.2630 0.28
0.6315 0.84
0.3157 1.27
CONSOLIDATION TEST (Determination of Pra-consolidation Pressure)
Project :
Location : Sample No. :
Description of Soil : Depth of Sample :
Tested By : Date of Testing :
Result
w : 52.05 % Cc : 0.3654 kemiringan komp
Gs : Cr : 0.0531 kemiringan rekomp
Sr : 84.92 % Po : 0.15
eo : 1.76 OCR : 16.52 OC
1.50
1.45
1.40 5
1.34
1.35 1.32
1.28
1.30 3
Void Rato (e)
ec
1.25 1.23
4
1.20
loading
1.15 1 2
1.08 unloading
1.10 1.06 1.05
1.04 1.02
1.05 1.00 1.00 1k
1.00
0.95
Pc 8k
0 1 10 100
Pressure [kg/cm2]
32k
FAKULTAS TEKNIK UNIVERSITAS INDONESIA
LABORATORIUM MEKANIKA TANAH
Kampus UI-Depok 16424 Telp. (021) 7270029, 78849102 Fax. (021) 7270028
e1 0.88
e2 0.77
p2 10.1044
p1 5.0522
e0 0.85
p0 0.3157
Cr
e 1.34 delta e 0.11 cr 0.120875
p 0.3157 delta p 0.903176
e 1.23
p 2.5261
cc
e 1.00 delta e 0.23 cc 0.38439
p 10.1044 delta p 0.60206