Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 19

All documents and files can be found in DocVision below

market communications / competitior. (See picture on the left)


The presentations are in the GAS TURBINES folder
Brochures can be found in the folders for each manufacturer

Saving the presentations to your computer.


Powerpoint presentations can not be saved straight from the web-
DocVision. The two alternatives are to open DocVision at the location
explained above or follow these following instructions:

How to save PowerPoint documents in intranet docvision!

1. Right click over the PowerPoint icon.


2. Select open in a new window.
3. On this new window you can save PowerPoint file from menu. [File ->
Save As...]
Gas turbine performance & price. Results are estimates only

Made PEI
KJ
4/8/2003

Update PEl Present


JNKS Train
4/15/2004
Updates in the new versions of Gas Turbine 2.0 estimator :
Revision C
Industrial Maintenance Calculator

Combined Cycle selection alternatives updated

Revision B
Mechanical drives added

Links to GT Training presentation and other preserntation material

Revision A
GT prices and performance according to Gas Turbine World Handbook 2003

New temperature derating for aeroderivates (Derating according to Trent 50)

Possibility to select GT according to frequency and turbine type.

If the performance data for 50Hz and 60Hz differ, they are handled as separate
turbines

Links from the manufacturer name to DocVision, where available product


brochures can be found.

Comparison to the prior year price level is added.


Gas Turbine Combined Cycle Power Plants Turnkey equipment-only for a basic gas fired combined cycle with gas turbine,
unfired multi-pressure heat recovery boiler with no bypass stack, multi-pressure
Price Levels 2003 condensingTotal
steam turbine, electrical generators, step-up transformer, water cooled
2 1.0 2.0

Units
heat rejection, standard controls,
electrical starting system and plant auxiliaries, and
Total electrical
12/20/2017 14:35 generally with dry low NOx gas turbine. Quoted FOB the factory in 2003 USD.
power site power site
Depending on volume and scope of equipment, site specific requirements,
conditions
geographic conditions
location and competitive HZ these pricesType
market conditions, can vary NO
Total plant power, site 100 MW considerably.
>80 (Ratings <120 for these plants are at ISO conditions
60 of 59F (15C), sea2

F..
level and 60% relative humidity, base load, on natural gas fuel and with no fluid
injection for power augmentation or NOx/CO control. Computed /kW cost figures
ALL Two or more GT units are based on net plant power output measured across the generator terminals.)
Source: 2003 GTW Handbook
Range +- 20 %
Min search 80.0 MW

T..
50 Hz Max search 120.0 MW
60Hz
Altitude 40 m
All Ambient temperature 35 C
Industrial Relative humidity 60 %
Aeroderivate Inlet pressure loss 10 mbar default 10 mbar
Exhaust pressure loss 20 mbar default 20 mbar

MW MW MW kJ/kWh % % $ $ / kW % MW
GT power ST power Total electrical Heat rate Price site Price
Gas Turbine site site power site site Efficiency site Efficiency ISO Budget Price conditions change ISO Base Freque.
Manufacturer Model type conditions conditions conditions conditions conditions conditions 2003 2003 2002->2003 Output Hz
GE Aero Products CC2-6000 2xLM6000PC #ADDIN? #ADDIN? #ADDIN? #ADDIN? #ADDIN? 51.6 $62,800,000 #ADDIN? -10.0% 106.5 50/60
Demag Delaval (Siemens) KAX100-2 2xGTX100 #ADDIN? #ADDIN? #ADDIN? #ADDIN? #ADDIN? 54.3 $74,500,000 #ADDIN? -0.7% 124.5 50/60
GE Power systems S-206C 2xFrame 6C #ADDIN? #ADDIN? #ADDIN? #ADDIN? #ADDIN? 54.4 $86,000,000 #ADDIN? - 126.7 50/60
GE Power systems S-206B 2xFrame 6B #ADDIN? #ADDIN? #ADDIN? #ADDIN? #ADDIN? 49.8 $75,400,000 #ADDIN? -11.1% 130.7 50/60
Siemens 2x1 Trent DLE 2xTrent #ADDIN? #ADDIN? #ADDIN? #ADDIN? #ADDIN? 54.3 $78,200,000 #ADDIN? -8.0% 132 50/60
Siemens 2x1 251B11/12 2x251B11/12 #ADDIN? #ADDIN? #ADDIN? #ADDIN? #ADDIN? 48.0 $87,400,000 #ADDIN? -9.0% 143.5 50/60

Source: 2003 GTW Handbook


STIG Steam Injection
WI Water Injection
WS Water Sprint
GT combined cycle plant, site conditions

12 60.0

10 55.0

Efficiency % , site conditions


8 50.0
$ / KW, site conditions

6 45.0

4 40.0

2 Column K 35.0
Logarithmic (Column K)
Column H
Logarithmic (Column H)
0 30.0
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00

Total plant power, MW


Altitude 40 m
Altitude #ADDIN? m
Air pressure #ADDIN? Pa
Standard
Air temperature 35 C 15 C
Air temperature #ADDIN? K #ADDIN? K
Air temperature #ADDIN? C #ADDIN? C

Relative humidity 60 % 60 %
Water content #ADDIN? kg/kg

Wet bulb #ADDIN? K #ADDIN? K


Wet bulb #ADDIN? C #ADDIN? C

Inlet pressure loss 10 mbar 10 mbar default


Inlet pressure loss 10 mbar 10 mbar default

Exhaust pressure loss 20 mbar


Exhaust pressure loss 20 mbar

HRhumCorr #ADDIN? #ADDIN?


PowerhumCorr #ADDIN? #ADDIN?
MassflowHumCorr

HRInletCorr 1.005 1.005


PowerInletCorr 0.986 0.986
MassflowInletCorr 0.9900 0.9900

HROutletCorr 1.008 1.008


PowerOutletCorr 0.99 0.99
MassflowOutletCorr

HRTempCorr #ADDIN? #ADDIN?


PowerTempCorr #ADDIN? #ADDIN?
MassflowTempCorr #ADDIN? #ADDIN?

HRAltCorr
PowerAltCorr #ADDIN? #ADDIN?
MassflowAltCorr #ADDIN? #ADDIN?

WBSteamPowCorr #ADDIN? #ADDIN?

HRTotalCorr #ADDIN? #ADDIN?


PowerTotalCorr #ADDIN? #ADDIN?
MassflowTotalCorr #ADDIN? #ADDIN?
Steam total corr #ADDIN? #ADDIN?
Gas Turbine Simple Cycle Power Plants
Price Levels, 2003
12/20/2017 14:35
Equipment only for a skid-mounted single-fuel gas turbine, electric
Total plant power, site 40 MW generator, air intake with filter and silencer, exhaust stack, basic
starter and controls, conventional combustion system unless
Number of units in plant 1 otherwise designated as dry low emissions (DLE) models. FOB the
Unit size 40.0 MW factory in 2003 U.S. dollars. Prices can vary significantly2.0
depending1.0

F. G
Range +- 50 % upon the scope of plant
Elec. equipment,
Power geographical
site cond.
Elec. Power siarea, special
HZ site
Type
requrements and competive market conditions.
Min search 20.0 MW >20 <60 60
Max search 60.0 MW

50Hz All
Industial
60Hz
Aeroderivate

Altitude 0 m
Ambient temperature 15 C
Relative humidity 60 %
Inlet pressure loss 10 mbar 10 mbar default
Exhaust pressure loss 10 mbar 10 mbar default

Steam pressure, abs 7 bar Steam equipment not included in price


Saturation temperature #ADDIN? C

MW kJ/kWh % $ $ / kW kg/h %
Elec. Power Heat rate Efficiency Efficiency Budget Price Budget price Turbine Price change
Manufacturer Model site cond. site cond site cond. ISO cond. 2003 site cond. Steam flow Introduced 2002->2003
Demag Delaval (Siemens) GT10B #ADDIN? #ADDIN? #ADDIN? #ADDIN? $7,495,000 #ADDIN? #ADDIN? 1981 0.0%
Rolls-Royce RB211-6556 #ADDIN? #ADDIN? #ADDIN? #ADDIN? $7,900,000 #ADDIN? #ADDIN? 1990 0.0%
Mashproekt UGT-25000 #ADDIN? #ADDIN? #ADDIN? #ADDIN? $6,800,000 #ADDIN? #ADDIN? 1993 0.0%
GE Power systems PG5371PA #ADDIN? #ADDIN? #ADDIN? #ADDIN? $7,680,000 #ADDIN? #ADDIN? 1987 0.0%
Hitachi H-25 #ADDIN? #ADDIN? #ADDIN? #ADDIN? $7,563,000 #ADDIN? #ADDIN? 1988 -11.0%
GE Aero Products LM2500PH (STIG) #ADDIN? #ADDIN? #ADDIN? #ADDIN? $10,500,000 #ADDIN? #ADDIN? - -6.9%
GE Aero Products LM2500+PK #ADDIN? #ADDIN? #ADDIN? #ADDIN? $9,500,000 #ADDIN? #ADDIN? - -16.2%
Rolls-Royce RB211-6562 #ADDIN? #ADDIN? #ADDIN? #ADDIN? $8,900,000 #ADDIN? #ADDIN? 1993 0.0%
Demag Delaval (Siemens) GT10C #ADDIN? #ADDIN? #ADDIN? #ADDIN? $8,495,000 #ADDIN? #ADDIN? 1999 0.0%
GE Oil&Gas MS5002E #ADDIN? #ADDIN? #ADDIN? #ADDIN? $8,300,000 #ADDIN? #ADDIN? 2003 -
Rolls-Royce RB211-6762DLE #ADDIN? #ADDIN? #ADDIN? #ADDIN? $9,600,000 #ADDIN? #ADDIN? 1999 0.0%
Mitsubishi MF-221 #ADDIN? #ADDIN? #ADDIN? #ADDIN? $10,000,000 #ADDIN? #ADDIN? 1994 0.0%
Rolls-Royce RB211-6761DLE #ADDIN? #ADDIN? #ADDIN? #ADDIN? $10,300,000 #ADDIN? #ADDIN? 2000 -0.9%
IHI IM5000 #ADDIN? #ADDIN? #ADDIN? #ADDIN? $12,900,000 #ADDIN? #ADDIN? 1986 0.0%
GE Power systems PG6561B #ADDIN? #ADDIN? #ADDIN? #ADDIN? $10,100,000 #ADDIN? #ADDIN? - -23.0%
GE Power systems PG6581B #ADDIN? #ADDIN? #ADDIN? #ADDIN? $11,240,000 #ADDIN? #ADDIN? 1999 -23.3%
GE Power systems PG6591C #ADDIN? #ADDIN? #ADDIN? #ADDIN? $11,250,000 #ADDIN? #ADDIN? 2003 -
GE Aero Products LM6000PD #ADDIN? #ADDIN? #ADDIN? #ADDIN? $10,200,000 #ADDIN? #ADDIN? 1994 -30.2%
GE Aero Products LM6000PD(DLE) #ADDIN? #ADDIN? #ADDIN? #ADDIN? $10,770,000 #ADDIN? #ADDIN? 1994 -30.2%
Demag Delaval (Siemens) GTX100 #ADDIN? #ADDIN? #ADDIN? #ADDIN? $11,830,000 #ADDIN? #ADDIN? 1998 0.0%
GE Aero Products LM6000PC #ADDIN? #ADDIN? #ADDIN? #ADDIN? $10,200,000 #ADDIN? #ADDIN? 1992 -28.1%
GE Aero Products LM6000PC Sprint (WS) #ADDIN? #ADDIN? #ADDIN? #ADDIN? $12,900,000 #ADDIN? #ADDIN? 1997 -22.4%
Siemens W251B11/12 #ADDIN? #ADDIN? #ADDIN? #ADDIN? $12,400,000 #ADDIN? #ADDIN? 1982 -12.0%
IHI IM5000-STIG #ADDIN? #ADDIN? #ADDIN? #ADDIN? $15,200,000 #ADDIN? #ADDIN? 1986 0.0%
Pratt & Whitney FT8 Twin #ADDIN? #ADDIN? #ADDIN? #ADDIN? $14,800,000 #ADDIN? #ADDIN? 1990 -10.9%
Rolls-Royce Trent 50 ** #ADDIN? #ADDIN? #ADDIN? #ADDIN? $16,200,000 #ADDIN? #ADDIN? 1997 -1.0%
Alstom GT8C2 #ADDIN? #ADDIN? #ADDIN? #ADDIN? $16,100,000 #ADDIN? #ADDIN? 1998 0.0%
Rolls-Royce Trent 60 ** (WI) #ADDIN? #ADDIN? #ADDIN? #ADDIN? $17,350,000 #ADDIN? #ADDIN? 2001 -0.6%
Siemens V64.3 #ADDIN? #ADDIN? #ADDIN? #ADDIN? $14,175,000 #ADDIN? #ADDIN? - -19.9%
Siemens V64.3A #ADDIN? #ADDIN? #ADDIN? #ADDIN? $15,900,000 #ADDIN? #ADDIN? 1996 -23.4%

Source: 2003 GTW Handbook


* Investment prices for 60Hz version used. Prices for 50Hz version higher due to gearbox and lower sales volume
** Investment prices for 50Hz version used. Prices for 60Hz version higher due to gearbox.
STIG Steam Injection
WI Water Injection
WS Water Sprint
GT simple cycle plant, site conditions

12 12.0

10 10.0

Efficiency % , site conditions


8 8.0
$ / KW, site conditions

6 6.0

4 4.0

2 2.0
Column I
Logarithmic (Column I)
Column F
0 Logarithmic (Column F) 0.0
0.00 50.00 100.00 150.00 200.00 250.00 300.00

Total plant power, MW


Altitude 0 m
Altitude #ADDIN? m
Air pressure #ADDIN? Pa

Air temperature 15 C
Air temperature #ADDIN? K
Air temperature #ADDIN? C

Relative humidity 60 %
Water content #ADDIN? kg/kg

Inlet pressure loss 10 mbar 10 mbar default


Inlet pressure loss 10 mbar 10 mbar default

Exhaust pressure loss 10 mbar


Exhaust pressure loss 10 mbar

Industrial Aeroderivate
HRhumCorr #ADDIN? #ADDIN?
PowerhumCorr #ADDIN? #ADDIN?

HRInletCorr 1.005 1.005


PowerInletCorr 0.99 0.99

HROutletCorr 1.004 1.004


PowerOutletCorr 1.00 1.00

HRTempCorr #ADDIN? #ADDIN?


PowerTempCorr #ADDIN? #ADDIN?

HRAltCorr
PowerAlttCorr #ADDIN? #ADDIN?

HRTotalCorr #ADDIN? #ADDIN?


PowerTotalCorr #ADDIN? #ADDIN?

Steam press #ADDIN? #ADDIN? Pa


Steam temp sat #ADDIN? #ADDIN? K
Mechnical Drives
Equipment only for gas fired engine (without driven
Price Levels, 2003 equipment), with gearbox, skid, enclosure, inlet and exhaust
12/20/2017 14:35 ducts and exhaust silencer, basic engine controls, fire
protection and starting systems, conventional combustion
system unless otherwise designated as dry low emissions
Total plant power, site 15 MW (DLE) models. Quoted FOB the factory in 2003 U.S. dollars.
Number of units in plant 1 Prices can vary significantly depending upon the scope of
plant equipment, geographical area, special site requrements
Unit size 15.0 MW ###

G
and competive market conditions.
Range +- 20 % Power site cond.Power site cType
Min search 12.0 MW >12 <18
Max search 18.0 MW

All
Industial
Aeroderivate

Altitude 0 m
Ambient temperature 15 C
Relative humidity 60 %
Inlet pressure loss 10 mbar 10 mbar default
Exhaust pressure loss 10 mbar 10 mbar default

MW kJ/kWh % % $ $ / kW rpm
Efficiency Budget
Power site Heat rate site Efficiency Budget price site Turbine Pressure Turbine
Manufacturer Model cond. site cond cond. ISO cond. Price 2003 cond. Introduced ratio speed
Vericor ASE8 #ADDIN? #ADDIN? #ADDIN? #ADDIN? $323,000 #ADDIN? 1974 10.5 1500/1800
Pratt & Whitney ST6L-813 #ADDIN? #ADDIN? #ADDIN? #ADDIN? $505,000 #ADDIN? 1976 8.5 33000
Turbomecha Makila T1 #ADDIN? #ADDIN? #ADDIN? #ADDIN? $636,000 #ADDIN? 1988 9.6 6300
Solar Saturn 20 #ADDIN? #ADDIN? #ADDIN? #ADDIN? $690,000 #ADDIN? 1985 6.2 22300
Pratt & Whitney ST18A #ADDIN? #ADDIN? #ADDIN? #ADDIN? $980,000 #ADDIN? 1995 14 18900
Vericor ASE40 #ADDIN? #ADDIN? #ADDIN? #ADDIN? $1,438,500 #ADDIN? 1978 8.8 15400
Pratt & Whitney ST30 #ADDIN? #ADDIN? #ADDIN? #ADDIN? $1,460,000 #ADDIN? 1999 18 14875
Mashproekt UGT-3000 #ADDIN? #ADDIN? #ADDIN? #ADDIN? $1,250,000 #ADDIN? 1993 12 14000
Solar Centaur 40 #ADDIN? #ADDIN? #ADDIN? #ADDIN? $1,700,000 #ADDIN? 1992 10.3 15000
Vericor ASE50 #ADDIN? #ADDIN? #ADDIN? #ADDIN? $1,626,700 #ADDIN? 1999 10.2 15400
Pratt & Whitney ST40 #ADDIN? #ADDIN? #ADDIN? #ADDIN? $1,655,000 #ADDIN? 1999 16.9 14875
Rolls-Royce 501-KC5 #ADDIN? #ADDIN? #ADDIN? #ADDIN? $1,850,000 #ADDIN? 1996 9.4 13600
LM500 #ADDIN? #ADDIN? #ADDIN? #ADDIN? $1,950,000 #ADDIN? - - -
Solar Centaur 50 #ADDIN? #ADDIN? #ADDIN? #ADDIN? $1,851,000 #ADDIN? 1993 10.3 16500
Solar Centaur 50L #ADDIN? #ADDIN? #ADDIN? #ADDIN? $2,100,000 #ADDIN? 1995 10.5 14300
Demag Delaval (Siemens) Typhoon #ADDIN? #ADDIN? #ADDIN? #ADDIN? $2,170,000 #ADDIN? 1994 12.8 13000
Bahrat HE MS1002C #ADDIN? #ADDIN? #ADDIN? #ADDIN? $1,900,000 #ADDIN? 1992 8.2 10290
GE Oil&Gas PGT5 #ADDIN? #ADDIN? #ADDIN? #ADDIN? $2,000,000 #ADDIN? 1972 8.6 30000
Rolls-Royce 501-KC7 #ADDIN? #ADDIN? #ADDIN? #ADDIN? $2,000,000 #ADDIN? 1998 9.4 13600
Solar Taurus 60 #ADDIN? #ADDIN? #ADDIN? #ADDIN? $2,150,000 #ADDIN? 1993 12.2 15000
Kawasaki M7A-01 #ADDIN? #ADDIN? #ADDIN? #ADDIN? $2,175,000 #ADDIN? 1993 12.7 1500/1800
GE Aero Products GE5 #ADDIN? #ADDIN? #ADDIN? #ADDIN? $2,315,000 #ADDIN? 2002 14.6 12500
Rolls-Royce 601-KC9 #ADDIN? #ADDIN? #ADDIN? #ADDIN? $2,400,000 #ADDIN? 1999 14.8 11500
Orenda GT6000 #ADDIN? #ADDIN? #ADDIN? #ADDIN? $2,390,000 #ADDIN? 1978 13.9 7200/8200
Mashproekt UGT-6000 #ADDIN? #ADDIN? #ADDIN? #ADDIN? $1,800,000 #ADDIN? 1978 13.9 7200
Kawasaki M7A-02 #ADDIN? #ADDIN? #ADDIN? #ADDIN? $2,500,000 #ADDIN? 1996 15.9 1500/1800
Demag Delaval (Siemens) Tornado #ADDIN? #ADDIN? #ADDIN? #ADDIN? $2,945,000 #ADDIN? 1981 12.5 10450
Solar Taurus 70 #ADDIN? #ADDIN? #ADDIN? #ADDIN? $2,700,000 #ADDIN? 1994 16.1 12000
Bahrat HE MS1002B #ADDIN? #ADDIN? #ADDIN? #ADDIN? $1,640,000 #ADDIN? - - -
Rolls-Royce 601-KC11 #ADDIN? #ADDIN? #ADDIN? #ADDIN? $2,860,000 #ADDIN? 1999 19.4 11500
Mashproekt UGT-6000+ #ADDIN? #ADDIN? #ADDIN? #ADDIN? $1,950,000 #ADDIN? 1997 15.7 7700
MAN THM1304-10 #ADDIN? #ADDIN? #ADDIN? #ADDIN? $3,540,000 #ADDIN? 1980 10 8600
Solar Mars 90 #ADDIN? #ADDIN? #ADDIN? #ADDIN? $3,400,000 #ADDIN? 1992 16.1 9500
GE Oil&Gas PGT10 #ADDIN? #ADDIN? #ADDIN? #ADDIN? $3,620,000 #ADDIN? 1986 13.6 7900
Mashproekt UGT-10000 #ADDIN? #ADDIN? #ADDIN? #ADDIN? $2,400,000 #ADDIN? 1998 19.6 4900
Solar Mars 100 #ADDIN? #ADDIN? #ADDIN? #ADDIN? $3,900,000 #ADDIN? 1994 17.4 9500
MAN THM1304-11 #ADDIN? #ADDIN? #ADDIN? #ADDIN? $3,800,000 #ADDIN? 1999 11.3 8600
Bahrat HE M3142J #ADDIN? #ADDIN? #ADDIN? #ADDIN? $3,345,000 #ADDIN? 1988 8.2 6500
GE Oil&Gas PGT10B #ADDIN? #ADDIN? #ADDIN? #ADDIN? $4,220,000 #ADDIN? - - -
Mitsui SB60-2 #ADDIN? #ADDIN? #ADDIN? #ADDIN? $4,650,000 #ADDIN? 1981 12.1 5680
Demag Delaval (Siemens) Cyclone DLE #ADDIN? #ADDIN? #ADDIN? #ADDIN? $4,880,000 #ADDIN? 1997 16 9500
Solar Titan 130 #ADDIN? #ADDIN? #ADDIN? #ADDIN? $4,500,000 #ADDIN? 1998 16.1 11200
Rolls-Royce Coberra 2648 Avon #ADDIN? #ADDIN? #ADDIN? #ADDIN? $4,500,000 #ADDIN? 1988 8.8 5500
Rolls-Royce Coberra 2656 Avon #ADDIN? #ADDIN? #ADDIN? #ADDIN? $4,640,000 #ADDIN? 1988 8.8 4950
Mashproekt UGT-10000 STIG #ADDIN? #ADDIN? #ADDIN? #ADDIN? $3,650,000 #ADDIN? 1998 20 4800/6500
Mashproekt UGT16000 #ADDIN? #ADDIN? #ADDIN? #ADDIN? $2,860,000 #ADDIN? 1989 12.8 5200
Demag Delaval (Siemens) GT35 DLE #ADDIN? #ADDIN? #ADDIN? #ADDIN? $5,430,000 #ADDIN? 1968 12 3450
Mashproekt UGT-15000 #ADDIN? #ADDIN? #ADDIN? #ADDIN? $3,560,000 #ADDIN? 1988 19.6 5300
GE Aero Products LM2000 #ADDIN? #ADDIN? #ADDIN? #ADDIN? $5,300,000 #ADDIN? 1973 20 3600
Rolls-Royce Spey SM1 #ADDIN? #ADDIN? #ADDIN? #ADDIN? $5,700,000 #ADDIN? 1987 21.9 5500
GE Oil&Gas M5261RA #ADDIN? #ADDIN? #ADDIN? #ADDIN? $5,200,000 #ADDIN? 1958 7.5 4860
Mashproekt UGT-15000+ #ADDIN? #ADDIN? #ADDIN? #ADDIN? $3,700,000 #ADDIN? 1998 19.4 3500
GE Aero Products LM2500DLE #ADDIN? #ADDIN? #ADDIN? #ADDIN? $7,600,000 #ADDIN? 1976 18.4 3600
GE Aero Products LM2500PE #ADDIN? #ADDIN? #ADDIN? #ADDIN? $7,150,000 #ADDIN? 1976 18.4 3600
GE Oil&Gas PGT25 #ADDIN? #ADDIN? #ADDIN? #ADDIN? $7,200,000 #ADDIN? 1981 17.9 6500
Rolls-Royce WR-21 #ADDIN? #ADDIN? #ADDIN? #ADDIN? $8,800,000 #ADDIN? 1997 16.2 3600
Mashproekt UGT-15000 STIG #ADDIN? #ADDIN? #ADDIN? #ADDIN? $4,950,000 #ADDIN? 1995 17.9 3000
Demag Delaval (Siemens) GT10B DLE #ADDIN? #ADDIN? #ADDIN? #ADDIN? $6,510,000 #ADDIN? 1981 14 7700
Pratt & Whitney FT8 #ADDIN? #ADDIN? #ADDIN? #ADDIN? $7,200,000 #ADDIN? 1991 19.5 5500
Rolls-Royce Coberra 6556 #ADDIN? #ADDIN? #ADDIN? #ADDIN? $7,365,000 #ADDIN? 1990 20.1 4950
Mashproekt UGT-25000 #ADDIN? #ADDIN? #ADDIN? #ADDIN? $5,150,000 #ADDIN? 1993 21 3300
Rolls-Royce Coberra 6562 DLE #ADDIN? #ADDIN? #ADDIN? #ADDIN? $7,800,000 #ADDIN? 1993 20.8 4950
GE Oil&Gas M5382C #ADDIN? #ADDIN? #ADDIN? #ADDIN? $6,900,000 #ADDIN? 1967 8.8 4670
GE Aero Products Coberrra 6562 #ADDIN? #ADDIN? #ADDIN? #ADDIN? $7,300,000 #ADDIN? - - -
GE Aero Products LM2500+ #ADDIN? #ADDIN? #ADDIN? #ADDIN? $7,960,000 #ADDIN? 1997 22.6 3600
Demag Delaval (Siemens) GT10C DLE #ADDIN? #ADDIN? #ADDIN? #ADDIN? $7,230,000 #ADDIN? 1998 17.6 6500
Rolls-Royce Coberra 6762 #ADDIN? #ADDIN? #ADDIN? #ADDIN? $8,110,000 #ADDIN? 1990 21.5 4800
Rolls-Royce Coberra 6761 #ADDIN? #ADDIN? #ADDIN? #ADDIN? $8,850,000 #ADDIN? 2000 21.5 4850
IHI IM5000 #ADDIN? #ADDIN? #ADDIN? #ADDIN? $9,720,000 #ADDIN? - - -
GE Oil&Gas M6511B #ADDIN? #ADDIN? #ADDIN? #ADDIN? $10,200,000 #ADDIN? - - -
GE Oil&Gas M6581B #ADDIN? #ADDIN? #ADDIN? #ADDIN? $10,300,000 #ADDIN? - - -
GE Aero Products LM6000 #ADDIN? #ADDIN? #ADDIN? #ADDIN? $12,100,000 #ADDIN? 1992 28.5 3600
Rolls-Royce Trent50 DLE #ADDIN? #ADDIN? #ADDIN? #ADDIN? $12,900,000 #ADDIN? 2003 35 2380/3570
Rolls-Royce Trent60 WI #ADDIN? #ADDIN? #ADDIN? #ADDIN? $14,000,000 #ADDIN? - - -
GE Oil&Gas M7111EA #ADDIN? #ADDIN? #ADDIN? #ADDIN? $17,300,000 #ADDIN? - - -
GE Oil&Gas M7121EA #ADDIN? #ADDIN? #ADDIN? #ADDIN? $18,400,000 #ADDIN? 1984 12.6 3600

Source: 2003 GTW Handbook


STIG Steam Injection
WI Water Injection
WS Water Sprint
GT Mechanical Drive, site conditions

12 12.0

10 10.0

Efficiency % , site conditions


8 8.0
$ / KW, site conditions

6 6.0

4 4.0

2 2.0
Column I
Logarithmic (Column I)
Column F
0 Logarithmic (Column F) 0.0
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.00

Total plant power, MW


change
Heat rate

Actual Maintenance Interval for Industrial Gas Turbine

%
3
GE Industrial gas turbine
Industrial Industrial GE
0 0 0 0 Corresponding EOH
2 2160 1243 1.15 -2.5
4320 2486 1.5 -3.25
10080 5800 1.85 -3.8
1 15120 8700 2 -4.2
19920 11462 2.2 -4.4
0 24000 13810 2.25 -4.6 Actual Running hours [h]
024000.1
1000013810
20000 2.2530000 40000-4.6 50000 60000 70000 80000 90000
Output
change

-1 24960 14362 2.25 -4.65


48000 EOH 27619 2.5 -5.35
48000 EOH 27619 2.2 -3.6
-2 50016 28779 2.4 Major -4.5
Overhaul
54960 31624 2.45 -4.75
-3 60000 34524 2.5 -5
79920 45986 2.7 -5.5
-4 90000 51786 2.75 -5.7
96000 55238 2.75 -5.7
96000 55238 0 0
-5

-6

According to GE formula
Equivalent Operating Hours (EOH) is calculated from actual operating hours in order to se the effect of fuel and way of operation on the maintenance
interval.

Note that the formula is only valid for Industrial turbines! Aeroderivative turbines are not affected the same way by starts and loading due to their
design.

Siemens calculates the EOH for its gas turbines with this formula

Hekv = Hb + 4 Hp + 1,5 Hbo + 6 Hpo + 10*starts + 100*trips


Hekv = equivalent operation hours Hbo = base load hours by LFO
Hb = base load hours by gas fuel Hpo = peak load hours by LFO
Hp = peak load hours by gas fuel

GE has a different system for calculation of the equivalent operating hour. The effect of different fuels and different types of starts are handled
separately. The factor that first meets the service limit is then used.
Some factors used:
Fuel: Gas 1 Starts: Trip 8
Distillate 1,5 Fast load 2
Crude 2-3 Emergency start 20
Residual 3-4

Normal maintenance interval:


24000h hot section overhaul
48000h major overhaul.

The maintenance interval figure is an estimation of the interval in actual operating hours. In the figure GE calculation and deterioration formulas are used.
This is the only available data on
aeroderivative deterioration at the
moment

Source: GE GER-3695
Maintenance Interval Calculator
12/20/2017 14:35
This function is only valid for Industrial type Gas Turbines

Annual Opererating Hours


Annual hours on Natural Gas 7000
Annual hours on Distillate Fuel 100
Annual hours on Heavy Fuel 0 Crude Residual
Annual Peak Load hours on Natural Gas 100
Annual Peak Load hours on Distillate Fuel 50
Annual Peak Load hours on Heavy Fuel 0
Total operating hours/year 7250

Number Of
Number of starts/year 150
Peak Load start/year 0
Emergency starts/year 20
Number of trips/year 10
Fast loads/year 0

EOH according to Siemens 11300 h

EOH according to GE 8050 h


OR 630 starts

Actual Mantenance Interval Hot section Major Maintenace


Equivalen Operating Hours 24000 EOH 48000 EOH
Equivalent Starts 1200 starts 2400 starts
Siemens 15398 h 30796 h
GE 13810 h 27619 h
Starts limiting factor