Installation Qualification
Operational Qualification
Pre-Run Checks.............................................................................................................. 10
Functional Tests.............................................................................................................. 11
Calibration ....................................................................................................................... 12
Training ........................................................................................................................... 13
Unstirred Water Bath SUB Aqua Plus SAMPLE COPY 29570 Version 1 March 2010
Installation and Operational Qualification 1
Installation Qualification
Instrument Origin and Identification
http://www.grant.co.uk
Serial Number:
New
Condition When Received:
Used
Reconditioned
Date Received:
Installed Location:
Unstirred Water Bath SUB Aqua Plus SAMPLE COPY 29570 Version 1 March 2010
Installation and Operational Qualification 2
Installation Qualification
Instrument Specification
Unstirred Water Bath SUB Aqua Plus SAMPLE COPY 29570 Version 1 March 2010
Installation and Operational Qualification 3
Installation Qualification
Unstirred Water Bath SUB Aqua Plus SAMPLE COPY 29570 Version 1 March 2010
Installation and Operational Qualification 4
Installation Qualification
Unpack the instrument carefully. Are any items missing against the Packing List?
Yes No
If yes, state missing items: __________________________________________________
Yes No
If yes: Description of damage: ____________________________________________
Instrument Safety
Unstirred Water Bath SUB Aqua Plus SAMPLE COPY 29570 Version 1 March 2010
Installation and Operational Qualification 6
Installation Qualification
Assembled and
Installed By:
User Specialised Engineer
Installation Procedure: OK Discrepancy N/A
Unstirred Water Bath SUB Aqua Plus SAMPLE COPY 29570 Version 1 March 2010
Installation and Operational Qualification 7
Installation Qualification Serial Number:
Summary Report
Successful completion of the preceding activities and checks indicates that this instrument
has been satisfactorily delivered and installed. The instrument has passed the Installation
Qualification procedure and may now be submitted for Operational Qualification.
This instrument conforms to the following standards and is supplied fully tested by the
manufacturer:
BS EN 61326:2006 Electrical equipment for measurement, control and laboratory
use EMC requirements.
BS EN 61010 Part 2-010:2003 Safety requirements for electrical equipment for
measurement, control and laboratory use particular requirements for laboratory
equipment for the heating of material.
The following electrical safety tests should also be carried out by a competent person after
installation.
Unstirred Water Bath SUB Aqua Plus SAMPLE COPY 29570 Version 1 March 2010
Installation and Operational Qualification 9
Operational Qualification
Pre-Run Checks
Unstirred Water Bath SUB Aqua Plus SAMPLE COPY 29570 Version 1 March 2010
Installation and Operational Qualification 10
Operational Qualification
Functional Tests
Unstirred Water Bath SUB Aqua Plus SAMPLE COPY 29570 Version 1 March 2010
Installation and Operational Qualification 11
Operational Qualification
Calibration
This instrument is supplied fully calibrated by the manufacturer, using equipment traceable
to national standards. Calibration by the user directly following standard installation is not
usually required.
Comments:
Unstirred Water Bath SUB Aqua Plus SAMPLE COPY 29570 Version 1 March 2010
Installation and Operational Qualification 12
Operational Qualification
Training
Read
Practical
Trained Operators Operator Authorising Signature
Training
Manual
Comments:
Unstirred Water Bath SUB Aqua Plus SAMPLE COPY 29570 Version 1 March 2010
Installation and Operational Qualification 13
Operational Qualification Serial Number:
Summary Report
Successful completion of the preceding activities and checks indicates that this instrument
is operating satisfactorily following delivery and installation. The instrument has passed the
Operational Qualification procedure and may now be released for use.