QAQC DECEMBER 2017 CALENDER (Rev 3 - 19/12/2017)

Sun 31 Mon Tues Wed Thu Fri 1 Sat 2


PREPARE WEEKLY REPORT
LiWeng, Safiz, Hussin
(P. HOLIDAY) – MAULID NABI

Sun 3 Mon 4 Tues 5 Wed 6 Thu 7 Fri 8 Sat 9


Weekly Construction Meeting Weekly Progress Meeting MMHE Weekly Meeting PREPARE WEEKLY REPORT
with Subcontractor Time: 2.30pm to 05.00pm Time: 3.00pm to 05.00pm LiWeng, Safiz, Hussin
4.00pm to 5.30pm Location: CPP Site Training Room Location: MMHE – ATB
Attend: Li Weng or Safiz Attend: Hussin Conference Room Hussin/ Safiz

Sun 10 Mon 11 Tues 12 Wed 13 Thu 14 Fri 15 Sat 16


Weekly Construction Meeting Weekly Progress Meeting Surveillance Review on Sub- MMHE Weekly Meeting PREPARE WEEKLY REPORT
with Subcontractor Time: 2.30pm to 05.00pm contractor Documentation. Time: 3.00pm to 05.00pm LiWeng, Safiz, Hussin
Time: 4.00pm to 5.30pm Location: CPP Site Training Room Location: CCM site Office Location: MMHE – ATB
Location: RAPID CPP Site Office Attend: Hussin Attend: Safiz, Siti Conference Room Hussin/ Safiz
Attend: Li Weng or Safiz

Sun 17 Mon 18 Tues 19 Wed 20 Thu 21 Fri 22 Sat 23


Weekly Construction Meeting Weekly Progress Meeting PRPC & CPP TOFD LEVEL II QSCM Tier III QSCM Tier II PREPARE WEEKLY REPORT
with Subcontractor (Supposed to be Every Tuesday Verify & Witness 5% of Time: 9am Time: 9.00am to 11.30am LiWeng, Safiz, Hussin
Time: 4.00pm to 5.30pm postpone to today 9.30 pm) Previous TOFD Inspection Location: RAPID CPP Site Office Location: IPMT Office Package 1
Location: RAPID CPP Site Office Attend: Hussin Activities. Attend: Hussin, Safiz, LiWeng Attend: Hussin, Safiz, LiWeng
Attend: Li Weng or Safiz Time: 9am Surveillance Review on Sub-
UPDATE MONTHLY RISK Location: MMHE-ATB contractor Documentation.
PREPARE MONTHLY REPORT ASSESSMENT REGISTER Attend: Hussin Time: 3.00pm to 5pm
LiWeng, Safiz, Hussin LiWeng, Safiz, Hussin Location: IJB site Office
Attend: Safiz, Siti
Mon 25 Tues 26 Wed 27 Thu 28 Fri 29 Sat 30
Weekly Construction Meeting MMHE-ATB Monthly Walkabout Surveillance Review on Sub- MMHE Weekly Meeting PREPARE WEEKLY REPORT
with Subcontractor Time: 9am contractor Documentation. Time: 3.00pm to 05.00pm LiWeng, Safiz, Hussin
Time: 4.00pm to 5.30pm Location: MMHE-ATB Time: 3pm-5pm Location: MMHE – ATB
Location: RAPID CPP Site Office Attend: Hussin/Li Weng/Safiz Location: DESB site Office Conference Room- Hussin/ Safiz
Attend: Li Weng or Safiz Weekly Progress Meeting Attend: Safiz, Siti
Time: 2.30pm to 05.00pm
(P. HOLIDAY) X’MAS Location: CPP Site Training Room
Attend: Hussin