s.no Plant Problem Solution Remarks
maintaince
1 karim Baksh Membrane Choke Replacement of membrane requred
Membrane Choke+ Control Replacement of membrane +Valve maintaince
2 Rab Dino Valve requred
maintaince
4 M.saddiue Membrane Choke Replacement of membrane requred
Vacuum problem in maintaince
5 Inayat Replacement of Vessel
Carbon Vessel requred
maintaince
6 Zohaib Khan High pressure Pump issue 13 x 54'' vessel replaced requred
maintaince
7 A.Ghafoor High Pressure Fitting Service of H.p Fitting requred
maintaince
8 Sher problem in vessel+bettry Replacement of Vessel requred
Low Recoverys and carbon Replacement of Vessel & maintaince
9 M.Ali
vessel issue membrane requred