JINDAL POWER LIMITED

CHECKLISTS
Doc. No. TMD/CL/011
TITLE : CHECKLIST FOR PREVENTIVE MAINTENANCE OF EQUIPMENTS Issue No. / Date 01 / 01-09-2008
TG & BOP MAINTENACE DEPARTMENT Rev No. / Date 00 / 01-09-2008
UNIT : EQUIPMENT : HYDRAZINE DOZING PUMPS
WORK ORDER NO. : DATE :

PERMIT NO. : PTW ISSUE DATE : PTW CLOSING DATE :

Sl. Design Actual


Work Instructions Frequency Remarks
No. Value Value
Work to be done/carried out when the equipment is isolated
1 Carry out external cleaning of equipment. Monthly

2 Check all joints for leakages if any arrest it. Monthly

Check all holding down bolts for tightness and take corrective action if required
3 Monthly

Check gland leakages if any arrest it if leakage is to be observed, same to be attended


4 Monthly
either by replacing the glands or by tightening it.
5 Check coupling spider for damage, if necessary replace it. Monthly

6 Servicing of mixing tank agitators. Monthly

7 Replacement of bearings, Gland pickings, Internal of pumps / Agitator, etc. Monthly


Spill over oil / water / grease / cotton waste / etc in surrounding area and floor to be
8 Monthly
cleaned and disposed

Signature of Contractor Signature of JPL Engineer Signature of JPL Engineer in charge


Page No. : 01

Prepared By : Reviewed & Approved By : HOD