GENERAL NOTES

1. READ ONLY FIGURED DIMENSIONS.

2. DIMENSIONS TO BE VERIFIED ON SITE BEFORE


2885 9920 COMMENCING ANY SITE WORK OR SHOP DRAWING
3000 3845 2115 3730

230 2770 230 3615 230 1885 230 3500 230


3. DIMENSIONS TO BE VERIFIED ON SITE BEFORE
COMMENCING ANY SITE WORK OR SHOP DRAWING

230

230
W3
SLUICE/DIRTY

LINEN STORE
+325mm Monolithic
115 3615 2085

Vinyl Floor Finish


W3
D1 UTILITY ROOM W4
+325mm Epoxy Floor Finish
3730
3730
MALE
3500
CHANGE
W3 ROOMS
+325mm Non-Slip
Ceramic Floor Finish
W4
(12.65m²) 11075 7460 3730 7460
115 900 3670
115

115
3615 3730 3730 3565 3895 3730 3730 3789

D2A
W3
LAUNDRY AUTO-CLAVE
10960 230 3335 230 1800 230 1635 230 3443 230 7287 230

1682
D2A
+325mm Monolithic

115 5088
+325mm Epoxy Floor Finish
FEMALE (16m²) Vinyl Floor Finish
W3
CHANGE
3730

1650
3730

115

ROOMS

230

230
D5
+325mm Non-Slip

D2A
115 893 1688

Ceramic Floor Finish


115

FEMALE

1550
1665
(13.20m²) W4
D2C
W3 ABLUTIONS
D5

3675
+325mm Non-slip Ceramic

3730
115

115

230
D6

115
D5 D5
Floor TilesD5
CLEAN IRON/PACKING
1742

LINEN +325mm Epoxy


1757

+325mm Marmoleum Vinyl

1720

1720
W1 Floor Finish W4

D3
+325mm Epoxy

3D
(8.25m²)

PASSAGE
Floor Finish

18593
3730

Floor Finish
115

115
115

230 800 230

230 800 230


SERVICE5365
DUCT

8720

8720
1260
D3
DOCTOR
D3

W1 W4 +50mm Paved Floor Finish


REST IN CHARGE 1635 230
+325mm Monolithic
3600

ROOM/DUTY

3705
Vinyl Floor Finish
STATION

1720
W4
+325mm Monolithic

1950
W1 Vinyl Floor Finish W4

3500
3730

115
D5 D5 D5
D6
MALE ABLUTIONS
3730

115

115
+325mm Non-slip Ceramic

1665
W4
Floor Tiles
W1
W5 W5

230

230
W4

230
3944
NURSE
RECOVERY/ IN CHARGE GENERAL
W1 230 3335 230 2030 1924
+325mm Monolithic
RESUSCITATION Vinyl Floor Finish W4
5825
STORE

4075

4075
4075

4075
3845
ROOM +250mm Hardwearing
3D
3730

7410

+325mm Monolithic 3730 3730 3730 3565 3895 3730 3730 Quarry Tiles (28m²) 3730
34628

115
Vinyl Floor Finish
715 115 2785 230 3788 115 3615 115 3615 115 2743 115 2565 230 1634 230 3558 115 7287 230
W1 1282
1397

W3
W4 W4 W4 W4 W4 W4 W4 W4 W4 W4
230

230
1100

W4
230
NURSE
IN-CHARGE CONSULTATION 2 CONSULTATION 3 INJECTION DRESSING TREATMENT D11 CHILDREN'S CHILDREN'S
3730

3500
3960
115

+325mm Polyurethane +325mm Polyurethane +325mm Polyurethane +325mm Polyurethane +325mm Polyurethane +325mm Polyurethane CONSULT. WELFARE CLINIC
NURSE'S Floor Finish Floor Finish Floor Finish Floor Finish Floor Finish Floor Finish

2400
+325mm Polyurethane +325mm Polyurethane
STATION (12.25m²) (12.45m²) (12.65m²) (12.65m²) (9.60m²) (9m²)
Floor Finish Floor Finish
1650

W1
+325mm Polyurethane (12.45m²) (19.85m²)

W4
Floor Finish D4 D4 D4 D4 D4 D4 D4 D4 D4
(6m²)
230

230

230
W5 W5 W5 W5 W5 230 3500 230

854
COVERED TERRACE
+250mm Hardwearing Quarry Tiles

3730
W1 STAGE 1 & 2 DESIGN
ISSUED FOR INFORMATION PURPOSES
RECEPTION

ENTRANCE PORCH
SF2

1511
+325mm Marmoleum
GENERAL WAITING

+250mm Quarry Tiles


W1 Floor Finish
AREA
+325mm Marmoleum Floor Finish

SIDE
6460

6230

6230

6230
6230
1500
D1
ENTRANCE
LOBBY

16150
W1
+325mm Marmoleum
Floor Finish

1511
SF2
REV. DESCRIPTION DATE
W1

854
CLIENT
SF1 SF1 W5 W5 W5 W5 W5 W5 W4 W4
230

230

230

230
D1
1330

REGISTRY & MEDICAL SCREENING/ CONSULTATION 1 COUNSELLING MEDICAL DRUG STORE


230

MAIN DISPENSARY MINISTRY OF HEALTH & WELLNESS


3730

3500

3500

3500
3960
ENTRANCE REVENUE RECORDS CONSULTATION 695 1200 1511 94 +325mm Monolithic +325mm Monolithic +325mm Monolithic +325mm Monolithic Vinyl Floor Finish PROJECT MANAGEMENT & PROCUREMENT UNIT
+325mm Monolithic +325mm Monolithic Vinyl Floor Finish Vinyl Floor Finish Vinyl Floor Finish PLOT No. 54609 GOVERNMENT ENCLAVE
PORCH +325mm Monolithic Vinyl Vinyl Floor Finish Vinyl Floor Finish PRIVATE BAG OO38, GABORONE
2170

+250mm Quarry Tiles Floor Finish

PROJECT TITLE
230

230

230
PROPOSED STAFF HOUSES FOR MAKGOPHANA CLINIC
W1 W1 W1 W1 W1 W1 W1 W1 W2 W2
WITHOUT MATERNITY IN MOCHUDI
2000

1770

1770
2000

2000

2000

2000
DWG TITLE
230

230
TYPCAL LEVEL 1 CLINIC FLOOR PLAN
W1 W1 W1 W1

SCALE nts JOB No. 1/2017


DATE JUNE 2017 DRAWN BY: APM
230 2770 230 5730 230 3500 230 3500 230 3500 230 3500 230 3392 115 3723 230 3500 230 7230 230
3000 5960 3730 3960 14690 3960 7460 REV. O CHECKED BY: NFT
3000 3845 2115 3730 3730 3730 3730 3565 3895 3730 3730 3730
42760 Project Team
Project Manager PPMU - MOHW
Architect PPMU - MOHW
Civil/Structural Engineer PPMU - MOHW
Electrical Engineer PPMU - MOHW
Mechanical Engineer PPMU - MOHW
Quantity Surveyor PPMU - MOHW

DRWG No.
MOHW/06/2017 - 01