Professional Documents
Culture Documents
Resume of Ashikur Rahman
Resume of Ashikur Rahman
Resume of Ashikur Rahman
More than 4 years’ NDT experience in pressure vessels, storage tanks, the pressure piping systems
including heat exchanger and heating boiler in Petrochemicals and Oil & Gas industry, Power Plant, Steel
structure Building, Construction.
Direct coordinate activities of departments concerned with the quality, production & pricing, manage staff,
preparing work schedules, assisting tender submission and assigning specific duties of employees. Review
financial statements, activity reports, and other performance data to measure productivity and goal
achievement and to determine areas needing cost reduction and program improvement. Establish and
implement departmental policies, goals, objectives, and procedures, conferring with board members,
5) Professional Course : Radiation Protection for the Radiation Control Officers (RCOs)
Duration : 4 Days
Institute : Bangladesh Atomic Energy Regulatory Authority (BAERA)
ACADAMIC BACKGROUND
SPECIALIZATION/RULES
Fields of Specialization/Skill Description
Classification Society Rules Familiar with RINA, GL, BV, NKK, DNV, Rules for ship building, repair & conversion of NDT
MS Office Package, Adobe Advance level user of MS Excel, Word, PowerPoint and mid level user of MS office package.
Acrobat, Emailing Excellent in internet browsing, communicating and emailing.
QA/QC inspection/welding Knowledge On
knowledge AWS Welding Inspection Technology
AWS VIW-M: 2008: Visual Inspection Reference Manual
API Standard 1104: Welding Of Pipelines and Related Facilities.
CSWIP-3.1(TWI WIS 5 Course: The Welding Inspection Of Steel)
Basic Metallurgy, Welding and NDT, Radiation Safety.
ASME Section IX, VIII, B 31.1, AWS D1.1, D1.2
Page 1 of 5
WORK EXPERIENCES: 4 YEARS (JANUARY, 2013 TO TILL NOW)
COMPANY:
Position:
01st November 2017 to Current
Work in that time the various type of project some of them are:
1. Max Power Ltd (KPCL)
Type of work: Radiographic Testing (RT), Penetrant Testing (PT), Magnetic Testing (MT),
Phased Array Ultrasonic Test (PAUT) etc.
2. Jamalpur 100 MW Power plant.
Type of work: Phased Array Ultrasonic Testing (PAUT), Ultrasonic Testing (UT),
Radiographic Testing (RT), Penetrant Testing (PT), Magnetic Testing (MT), Leak Testing (LT)
Oil and Chalk Test etc
3. Shikalbaha 150 MW power Plant, Chittagong
Type of work: Ultrasonic Testing (UT), Radiographic Testing (RT), Penetrant Testing (PT),
Magnetic Testing (MT), Leak Testing (LT), Oil and Chalk Test etc.
4. Bibiyana-III 400 MW CCPP project
Type of work: Taking Welding Procedure Record, Helping to develop Welding Procedure
Specification, Preparing Welder Certificate, Magnetic Testing etc.
5. Western Marine Shipyard Ltd, Chittagong
Type of work: Ultrasonic Testing (UT), Radiographic Testing (RT), Penetrant Testing (PT),
Magnetic Testing (MT), etc.
6. Sirajganj 225 MW CCPP-RMS 2
Type of work: Radiographic Testing (RT), Penetrant Testing (PT)
7. Dockyard & Engineering Works Limited
Type of work: Phased Array Ultrasonic Testing (PAUT), Radiographic Testing (RT),
Penetrant Testing (PT)
8. Omera cylinder limited at Hobigong,
Type of work: Radiography Testing (RT)
9. Podma oil tank at Dhaka Airport
Type of work: Thickness Gauging
10. TTCL (Boiler Company)
Type of work: Phased Array Ultrasonic Testing (PAUT)
11. Modern Erection Limited
Type of work: Phased Array Ultrasonic Testing (PAUT)
12. Jalalabad Gas at Hobigong,
Type of work: Radiography Testing (RT)
13. Khan Brothers Ship Building, Gazaria, Munsigonj
Type of work: Phased Array Ultrasonic Testing (PAUT)
14. Marine Trust Ltd, Gazaria, Munsigonj
Type of work: Phased Array Ultrasonic Testing (PAUT), Ultrasonic Testing (UT) etc.
15. Three angle Marine Ltd, Narayangonj
Type of work: Ultrasonic Testing (UT), Radiographic Testing (RT), Penetrant Testing (PT),
Magnetic Testing (MT) etc.
16. Azad Boiler Limited:
Page 3 of 5
Type of work: Phased Array Ultrasonic Testing (PAUT), Radiographic Testing (RT),
Penetrant Test (PT)
17. Alif Boiler
Type of work: Phased Array Ultrasonic Testing (PAUT), Radiographic Testing (RT)
Page 5 of 5