Resume of Ashikur Rahman

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 5

RESUME OF

MD. ASHIKUR RAHMAN


E-mail: asikurndt@gmail.com
Cell: +8801723-097042

More than 4 years’ NDT experience in pressure vessels, storage tanks, the pressure piping systems
including heat exchanger and heating boiler in Petrochemicals and Oil & Gas industry, Power Plant, Steel
structure Building, Construction.
Direct coordinate activities of departments concerned with the quality, production & pricing, manage staff,
preparing work schedules, assisting tender submission and assigning specific duties of employees. Review
financial statements, activity reports, and other performance data to measure productivity and goal
achievement and to determine areas needing cost reduction and program improvement. Establish and
implement departmental policies, goals, objectives, and procedures, conferring with board members,

PROFESSIONAL TRAINING AND CERTIFICATION


1) Professional Course : ASNT NDT Level-II
Duration : 192 HRS (UT, RT, MT, PT, RTFI, TOFD, PAUT)
Institute : INDUSTRIAL INSPECTION & TRAINING SERVICES (IITS), Dhaka,

2) Professional Course : Safe Transport of Radioactive Material


Duration : 01 Day
Institute : Bangladesh Atomic Energy Regulatory Authority (BAERA)

3) Professional Course : Radiation Protection For Radiation Workers & RCOs


Duration : 05 Days
Institute : Atomic Energy Research Establishment (AERE), Savar, Dhaka

4) Professional Course : Preparatory Course for CSWIP 3.1


Duration : 10 Days
Institute : Industrial Inspection & Training Services (IITS), Dhaka, Bangladesh.

5) Professional Course : Radiation Protection for the Radiation Control Officers (RCOs)
Duration : 4 Days
Institute : Bangladesh Atomic Energy Regulatory Authority (BAERA)

ACADAMIC BACKGROUND

Course Name of Institute Result Passing Year


M.Sc. in Chemistry National University 2nd Class 2012

SPECIALIZATION/RULES
Fields of Specialization/Skill Description
Classification Society Rules Familiar with RINA, GL, BV, NKK, DNV, Rules for ship building, repair & conversion of NDT
MS Office Package, Adobe Advance level user of MS Excel, Word, PowerPoint and mid level user of MS office package.
Acrobat, Emailing Excellent in internet browsing, communicating and emailing.
QA/QC inspection/welding Knowledge On
knowledge AWS Welding Inspection Technology
AWS VIW-M: 2008: Visual Inspection Reference Manual
API Standard 1104: Welding Of Pipelines and Related Facilities.
CSWIP-3.1(TWI WIS 5 Course: The Welding Inspection Of Steel)
Basic Metallurgy, Welding and NDT, Radiation Safety.
ASME Section IX, VIII, B 31.1, AWS D1.1, D1.2

Page 1 of 5
WORK EXPERIENCES: 4 YEARS (JANUARY, 2013 TO TILL NOW)
COMPANY:
Position:
01st November 2017 to Current

COMPANY: INDUSTRIAL INSPECTION & TRAINING SERVICES (IITS)


Position: Technical Manager
01st March 2016 to Current
Responsibilities:
1. Ensuring teams follow the correct procedures, policies and documentation requirements
across project phases
2. Guiding the team through the development, testing and implementation stages and review
the completed work effectively
3. Providing direction and technical expertise in design, development and systems integration
4. Quick decisions and solve technical problems to provide an efficient environment for
project implementation
5. Identifying resource and equipment requirements, efficient capacity planning and manage
software and hardware availability
6. Providing Technical Training to teams when required and serve as a technical mentor to
team members
7. Ensuring standard operating procedures and project guidelines are in place
8. Task allocation and performance evaluation of team members
9. Project scheduling and resource management
10. Planning, budgeting and reporting on projects
11. Planning, budgeting and reporting on projects
12. Communicate effectively with teams and clients
13. Understand project requirements, coordinate with resources and direct the projects in the
right direction in a timely manner
14. Change and effectively pass on the information down the line to concerned teams for
smoother execution
15. Delegate and allocate responsibilities efficiently to manage projects end to end

COMPANY: INDUSTRIAL INSPECTION & TRAINING SERVICES (IITS)


Position: QA/QC Engineer/NDT Engineer
04th April 2014 to 01st March 2016
Responsibilities:
● Conduct, witness and review welding procedure specification and welder/welding operator’s
qualification test, ensure approval & field implementation.
● Ensure visual inspection of steel and other material during receiving, blasting, cutting and tack
welding.
● Verify material chemical composition and mechanical properties which shown on mill test reports.
● Ensure visual inspection before, during and after welding and deficiency report generation.
● Ensure accurate edge preparation, welding, proper grinding as per WPS, and approved drawings.
● Preparing NDE plan & monitoring NDE operation,
● Ensure daily and periodic third party inspection on the basis of ITP and above standard and
specification.
● Monitor the welding NDT (RT, UT, MPI, PT), PWHT, Mechanical test, Production test, Hardness test
etc. to ensure compliance with Code (API 1104, ASME IX, ASME B31.3 & D1.1 etc.) or Owner
specification requirement.
● Manage the team of QC Inspectors and work actively in the field with them.
Page 2 of 5
● Guide Quality Inspectors to expedite works.
● Attending meeting regarding daily activity, progress & production planning.
● Dealing with vendor and documentation.
● Review checklist of new building and monitor production progress.
● Prepare deficiency report status on the basis of daily inspection and clarify all remarks.
● Monitor and ensure proper documentation of project inspection and test report and review
delivery documents.

Work in that time the various type of project some of them are:
1. Max Power Ltd (KPCL)
Type of work: Radiographic Testing (RT), Penetrant Testing (PT), Magnetic Testing (MT),
Phased Array Ultrasonic Test (PAUT) etc.
2. Jamalpur 100 MW Power plant.
Type of work: Phased Array Ultrasonic Testing (PAUT), Ultrasonic Testing (UT),
Radiographic Testing (RT), Penetrant Testing (PT), Magnetic Testing (MT), Leak Testing (LT)
Oil and Chalk Test etc
3. Shikalbaha 150 MW power Plant, Chittagong
Type of work: Ultrasonic Testing (UT), Radiographic Testing (RT), Penetrant Testing (PT),
Magnetic Testing (MT), Leak Testing (LT), Oil and Chalk Test etc.
4. Bibiyana-III 400 MW CCPP project
Type of work: Taking Welding Procedure Record, Helping to develop Welding Procedure
Specification, Preparing Welder Certificate, Magnetic Testing etc.
5. Western Marine Shipyard Ltd, Chittagong
Type of work: Ultrasonic Testing (UT), Radiographic Testing (RT), Penetrant Testing (PT),
Magnetic Testing (MT), etc.
6. Sirajganj 225 MW CCPP-RMS 2
Type of work: Radiographic Testing (RT), Penetrant Testing (PT)
7. Dockyard & Engineering Works Limited
Type of work: Phased Array Ultrasonic Testing (PAUT), Radiographic Testing (RT),
Penetrant Testing (PT)
8. Omera cylinder limited at Hobigong,
Type of work: Radiography Testing (RT)
9. Podma oil tank at Dhaka Airport
Type of work: Thickness Gauging
10. TTCL (Boiler Company)
Type of work: Phased Array Ultrasonic Testing (PAUT)
11. Modern Erection Limited
Type of work: Phased Array Ultrasonic Testing (PAUT)
12. Jalalabad Gas at Hobigong,
Type of work: Radiography Testing (RT)
13. Khan Brothers Ship Building, Gazaria, Munsigonj
Type of work: Phased Array Ultrasonic Testing (PAUT)
14. Marine Trust Ltd, Gazaria, Munsigonj
Type of work: Phased Array Ultrasonic Testing (PAUT), Ultrasonic Testing (UT) etc.
15. Three angle Marine Ltd, Narayangonj
Type of work: Ultrasonic Testing (UT), Radiographic Testing (RT), Penetrant Testing (PT),
Magnetic Testing (MT) etc.
16. Azad Boiler Limited:

Page 3 of 5
Type of work: Phased Array Ultrasonic Testing (PAUT), Radiographic Testing (RT),
Penetrant Test (PT)
17. Alif Boiler
Type of work: Phased Array Ultrasonic Testing (PAUT), Radiographic Testing (RT)

UNDER TITAS GAS PROJECT:


1. Project: Dhaka Metro Rail (Ø16" Gas Pipe Line Agargoan-Mirpur-12)
Method(s): Radiographic Test (RT)
2. Project: Ø 8” x 50 psig x 3.325 km (GMSC)
Method(s): Radiographic Test (RT)
3. Project: Ø 8” x 150 psig x 1250 Ft (Unity Fabrics
Method(s): Radiographic Test (RT)
4. Project: Natural Gas Transmission Pipe Line Ø8” x 150 PSIG Kashimpur, Gazipur (Multifab Ltd)
Method(s): Radiographic Test (RT)
5. Project: Natural Gas Transmission Pipe Line Ø6” x 150 PSIG CFP, Kaliyaqure, Gazipur (Sadma
Fashion)
Method(s): Radiographic Test (RT)
6. Project: Natural Gas Transmission Pipe Line Ø 6” & Ø 4” 140 psig , Konabari, Gazipur (Greenland
Germents)
Method(s): Radiographic Test (RT)
7. Project: Natural Gas Transmission Pipe Line Ø 12” 150 psig Valuka, Mymonsingh (Ridisha
Spinning Mills Ltd)
Method(s): Radiographic Test (RT)
8. Project:Natural Gas Transmission Pipe Line Ø6” 150 psig Konabari, Gazipur (MM Knitwear Ltd)
Method(s): Radiographic Test (RT)
9. Project:Natural Gas Transmission Pipe Line Ø12” 150 psig Ulusara Chandra, Gazipur (DBDL)
Method(s): Radiographic Test (RT)
10. Project: Natural Gas Transmission Ø16" 150 psig Pipe Line Square Master Bari (N-R Group)
Method(s): Radiographic Test (RT)

COMPANY: INDUSTRIAL INSPECTION & TRAINING SERVICES (IITS)


Position: NDT Inspector
01st January 2013 to 04th April 2014
Responsibilities:
● Conduct, witness and review welding procedure specification and welder/welding operator’s
qualification test, ensure approval & field implementation.
● Ensure visual inspection of steel and other material during receiving, blasting, cutting and tack
welding.
● Verify material chemical composition and mechanical properties which shown on mill test reports.
● Ensure visual inspection before, during and after welding and deficiency report generation.
● Ensure accurate edge preparation, welding, proper grinding as per WPS, and approved drawings.
● Supervising NDT (RT, UT, MPI, PT), PWHT, Mechanical test, Production test, Hardness test etc. to
ensure compliance with Code (API 1104, ASME IX, ASME B31.3 & D1.1 etc.) or Owner specification
requirement.
Work in that time the various type of project some of them are:
1. GSK Bangladesh
Type of work: Ultrasonic Thickness Gauging (UTG), Magnetic Testing (MT) etc.
2. Nestle Bangladesh Limited
Type of work: Load Test
3. Siddhirgonj 330 MW power plant project
Type of work: Welding Inspection
4. National Development Engineers Limited etc.
Page 4 of 5
Type of work: Ultrasonic Testing (UT), Magnetic Testing (MT) etc.

Page 5 of 5

You might also like