Deviations in structure proposal

Sl No Design ch Prop. span Proposal Remarks


missing in new structure required on
1 188+210 1x6.0 schedule-B realignment
retained with
2 188+975 2 row 1200 reconstruction required
repair
retained with new structure required on
3 192+750 2 row 1200 repair realignment
retained with
4 193+300 2 row 1200 reconstruction required
repair
retained with new structure required on
5 196+455 1x6.0 repair realignment
retained with new minor bridge required on
6 197+325 6 row 1200 repair realignment
retained with wideing reqd. due to curve
7 201+350 1 row 1200 repair improvement/widening
retained with wideing reqd. due to curve
8 201+550 1 row 1200 repair improvement/widening
retained with wideing reqd. due to curve
9 201+630 1 row 1200 repair improvement/widening
retained with new structure required on
10 202+390 1 row 1200 repair realignment
retained with new minor bridge required due
11 203+350 1 row 1200 repair to realignment
retained with new slab culvert required on
12 203+500 2 row 1200 repair realignment
retained with new slab culvert required on
13 203+650 1 row 1200 repair realignment
retained with new slab culvert required on
14 203+880 1 row 1200 repair realignment
retained with new slab culvert required on
15 204+100 1 row 1200 repair realignment
retained with new slab culvert required on
16 204+200 1 row 1200 repair realignment
retained with new structure required on
17 204+280 1 row 1200 repair realignment
missing in new minor bridge required on
18 204+370 1x5.0 schedule-B realignment
retained with new structure required on
19 206+830 1 row 1200 repair realignment
retained with wideing reqd. due to curve
20 207+620 1 row 1200 repair improvement/widening
retained with wideing reqd. due to curve
21 207+640 2 row 1200 repair improvement/widening
retained with wideing reqd. due to curve
22 208+890 1 row 1200 repair improvement/widening
retained with new structure required on
23 209+240 1 row 1200 repair realignment
Deviations in structure proposal
Sl No Design ch Prop. span Proposal Remarks
retained with new structure required on
24 209+340 1x3.0 repair realignment
retained with new structure required on
25 209+500 1 row 1200 repair realignment
retained with wideing reqd. due to curve
26 209+690 1 row 1200 repair improvement/widening
retained with wideing reqd. due to curve
27 209+770 1 row 1200 repair improvement/widening
retained with wideing reqd. due to curve
28 209+900 1 row 1200 repair improvement/widening
retained with wideing reqd. due to curve
29 210+280 2 row 1200 repair improvement/widening
retained with wideing reqd. due to curve
30 210+460 1 row 1200 repair improvement/widening
retained with new structure required on
31 210+590 1 row 1200 repair realignment
retained with new structure required on
32 211+110 1 row 1200 repair realignment
retained with new structure required on
33 211+380 1 row 1200 repair realignment
New slab structure &
retained with
34 212+300 1 row 1200 underpass required on
repair realignment
new structure required on
35 219+000 2 row 1200 widening realignment
retained with new structure required on
36 222+030 1 row 1200 repair realignment
retained with wideing reqd. due to curve
37 223+460 2 row 1200 repair improvement/widening
retained with wideing reqd. due to curve
38 223+745 2 row 1200 repair improvement/widening
retained with wideing reqd. due to curve
39 228+420 2 row 1200 repair improvement/widening
retained with wideing reqd. due to curve
40 229+850 2 row 1200 repair improvement/widening
missing in new structure required on
41 234+800 1 row 1200 schedule-B realignment
From (Km)To (Km) From (Km)To (Km) Length (Km)
Various Other Issues
Sl no Design Chainage Remarks
Existing alignment followed and cutting avg. 5.5m, but
1 202+260 to 203+180 widening is proposed
Realignment in cutting section but according to site
2 203+180 to 204+00 avg. 10m filling required
3 206+800 to 207+100 Filling shown but as per site cutting required
Existing alignment followed and cutting avg. 3.0m, but
4 209+500 to 210+300 widening is proposed

5 211+900 to 212+000 Cutting shown in profile but as per site filling required

no new structure proposed on realignment. Proposed


6 215+600 to 216+300 FRL matches existing ground level but raising in profile
required on realignment
Existing alignment followed and cutting avg. 2.0m, but
7 220+720 to 221+000 widening is proposed

226+980 to 227+500 & Existing alignment followed and filling avg. 2.0m
8 227+500 to 228+380 proposed by cutting avg. 5.0m, but widening is
followed

Status of Forest Clearance


Status of LA
Major portion falls under hilly terrain where hill road
mannual should be adopted