Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

10 11

A
6-24 Dia Drilled Holes for M20 x 500L Foundation Bolts

B
320.0 2-150 Dia Grout Holes
MS-2
MS-1 MS-3

305.0 570.0 255.4 12.0 12.0


12.0
EP-1
320.0
115.0

140.0
150.0 630.0 630.0 150.0 D

TOP VIEW

ABDUL FAHEEM
1 27/11/2016 GAFOOR NAWAZ ISSUED FOR REVIEW/APPRV
ABDUL
25.0 0 10/08/2016 GAFOOR RAHUL ISSUED FOR REVIEW/APPRV

PS-21 Rev DATE


Drawn Ckd. Appd.

(PS-22) 195.0 PB-1 PB-2


by by by DESCRIPTION
PB-1,(PB-2)
PS-3 F
PS-11,(PS-12) 60.0 107°
12.0
12.0 AS, 8 No's 30.0 12.0 MB-2,
MS-4, 12.0P.O. Box: 30111, Al Jubail 31951, Saudi Arabia
(MB-3) Website:- www.icomksa.com
427.0 C-1,(C-2) 75.0
(MB-1)
25.0CLIENT :- SAUDI ARAMCO
GP 51.4
PROJECT TITLE: SFC# 3000684652
50 PUMP SKID FABRICATION WORKDATE:25.12.2016 G
50
201.4
30 150.0PROJECT NO :- PROJ/RFQ-ICOM 16173
SLOPE 56.0
DRAWING TITLE :- SKID R 411- P1B
EP-2 150.0 75.0
1130.0 135.0 295.0 640.0 DRG NO:- DRG 004-R411-P1 B REV. R1

DRAWN SHEET 1 OF 1
CHECKED APPROVED NO.
1560.0 ABDUL FAHEEM SCALE
H
THIS DRAWING CONTAINS CONFIDENTIAL
INFORMATION OF ICOM GAFOOR NAWAZ NTS
THE COPYRIGHT,DESIGN RIGHT
AND/OR OTHER INTELLECTUAL PROPERTY

ELEVATION RIGHT SIDE VIEW RIGHTS OF THIS DRAWING BELONGS TO THE


COMPANY. THIS DRAWING MUST NOT BE
REPRODUCED, DISCLOSED OR USED FOR THE
PURPOSES OTHER THAN THOSE FOR WHICH
PRIOR CONSENT OF THE COMPANY HAS BEEN
GIVEN.

You might also like