TIM I
1 PRESERVASI REKONSTRUKSI JALAN TAMILOW-HAYA-TEHORU-LAIMU-WERINAMA
- Pemeliharaan Rutin Jalan KM 135.44 3,385,875,000.00
- Rehabilitasi Minor Tamilouw-Haya-Tehoru-Laimu-Werinama (Aspal oprit 4 Jembatan)
KM - -
- Rekonstruksi Jalan TEHORU - LAIMU (030) PSN KM 1.20 9,290,000,000.00
- Rekonstruksi Jalan LAIMU - WERINAMA (031) PSN KM 5.00 26,400,000,000.00
- Pemeliharaan Rutin Jembatan M 3,067.80 2,300,850,000.00
3 Supporting Staff
Operator Komputer Bln 12 -
Sub Total -
HARGA SATUAN TOTAL BIAYA
NO URAIAN SATUAN VOLUME
(Rp) (Rp)
13 Laporan
Laporan RMK Buku 7 -
Laporan Pendahuluan + foto (7xPaket) Buku 7 -
Laporan Bulanan (7x6x Paket) Buku 77 -
Laporan Teknis (7xPaket) + CD Buku 7 -
Laporan Pengujian Mutu (7xPaket) + CD Buku 7 -
Laporan Akhir (7xPaket) Set 7 -
Sub Total -
Total TIM I -
HARGA SATUAN TOTAL BIAYA
NO URAIAN SATUAN VOLUME
(Rp) (Rp)
TIM II
1 PEMBANGUNAN JEMBATAN WAI LAO M 120.00 23,970,000,000.00
2 PEMBANGUNAN JEMBATAN WAI HINA SALOLO M 61.00 46,000,000,000.00
3 Supporting Staff
Operator Komputer Bln 10 -
Sub Total -
12 Laporan
Laporan Pendahuluan + foto (7xPaket) Buku 21 -
Laporan Bulanan (7x7x Paket) Buku 154 -
Laporan Teknis (7xPaket) + CD Buku 21 -
Laporan Pengujian Mutu (7xPaket) + CD Buku 21 -
Laporan Akhir (7xPaket) Set 21 -
Sub Total -
Total TIM II -
REKAPITULASI BIAYA
HARGA PERHITUNGAN SENDIRI (HPS)
TIM I
TIM II
PPN 10 % -
TOTAL BIAYA -
DIBULATKAN -
TERBILANG :
PT …………………………………
…………………………………………………..
(Direktur Utama / Kepala Cabang)