RINCIAN BIAYA

PAKET : PENGAWASAN TEKNIS JALAN DAN JEMBATAN DI PULAU SERAM 2

HARGA SATUAN TOTAL BIAYA


NO URAIAN SATUAN VOLUME
(Rp) (Rp)

TIM I
1 PRESERVASI REKONSTRUKSI JALAN TAMILOW-HAYA-TEHORU-LAIMU-WERINAMA
- Pemeliharaan Rutin Jalan KM 135.44 3,385,875,000.00
- Rehabilitasi Minor Tamilouw-Haya-Tehoru-Laimu-Werinama (Aspal oprit 4 Jembatan)
KM - -
- Rekonstruksi Jalan TEHORU - LAIMU (030) PSN KM 1.20 9,290,000,000.00
- Rekonstruksi Jalan LAIMU - WERINAMA (031) PSN KM 5.00 26,400,000,000.00
- Pemeliharaan Rutin Jembatan M 3,067.80 2,300,850,000.00

A. BIAYA LANGSUNG PERSONIL


1 Profesional Staff
Site Engineer Bln 12 -
Ahli Kualitas Bln 9 -

2 Sub Profesional Staff


Inspector 1 Bln 12 -
Surveyor 1 Bln 8 -
Material & Lab Technician 1 Bln 8 -

3 Supporting Staff
Operator Komputer Bln 12 -

Sub Total -
HARGA SATUAN TOTAL BIAYA
NO URAIAN SATUAN VOLUME
(Rp) (Rp)

B BIAYA LANGSUNG NON PERSONIL


1 Mobilisasi / Demobilisasi
Site Engineer Return 1 -
Ahli Kualitas Return 1 -
Taxi from / to airport Return 2 -

2 Mobilisasi / Demobilisasi ke Lokasi


Site Engineer Return 1 -
Ahli Kualitas Return 1 -
Inspector Return 1 - -
Surveyor Return 1 -
Material & Lab Technician Return 1 - -
Operator Komputer Return 1 - -
3 Perjalanan Dinas + Akomodasi lainnya
Tiket/Ongkos Transportasi Return 12 - -
Uang Harian OH 0 -
Uang Penginapan OH 0 -
5 Biaya Perjalanan Ke Pusat
Tiket/Ongkos Transportasi Return 1 - -
Uang Harian OH 5 -
Uang Penginapan OH 4 -

6 Sewa Kantor Bln 12 -


7 Sewa Rumah Profesional Staff Bln 12 -

8 Sewa Kamar Sub Profesional Staff Bln 12 -


9 Sewa Mobil dan Sepeda Motor
Sewa Kendaraan Roda 4 dan operasional Bln 12 -
Sewa Kendaraan Roda 2 (4 unit) dan operasional Bln 37 -

10 Sewa Genset Bln 12 -

11 Perlengkapan K3 (Savety Health) org / psg 5 -


- Baju + Rompi + Kaos + Topi + Helm
- Mantel Hujan
- Sepatu
- Helm Proyek
- Masker
- Kacamata
12 Bahan Operasional Kantor
a. Sewa Komputer + Printer A4 & A3 1 unit Bln 12 -
b. Sewa Laptop + Printer utk Site Engineer 1 unit Bln 12 -
c. Bahan Operasional Kantor Bln 12 -
d. Komunikasi Kantor (Telp, Fax, Internet, Pos) Bln 12 -

13 Laporan
Laporan RMK Buku 7 -
Laporan Pendahuluan + foto (7xPaket) Buku 7 -
Laporan Bulanan (7x6x Paket) Buku 77 -
Laporan Teknis (7xPaket) + CD Buku 7 -
Laporan Pengujian Mutu (7xPaket) + CD Buku 7 -
Laporan Akhir (7xPaket) Set 7 -

Sub Total -
Total TIM I -
HARGA SATUAN TOTAL BIAYA
NO URAIAN SATUAN VOLUME
(Rp) (Rp)
TIM II
1 PEMBANGUNAN JEMBATAN WAI LAO M 120.00 23,970,000,000.00
2 PEMBANGUNAN JEMBATAN WAI HINA SALOLO M 61.00 46,000,000,000.00

A. BIAYA LANGSUNG PERSONIL


1 Profesional Staff
Site Engineer Bln 10 -
Ahli Kualitas Bln 9 -

2 Sub Profesional Staff


Inspector 1 Bln 9 -
Inspector 2 Bln 9 -
Surveyor 1 Bln 9 -
Surveyor 2 Bln 9 -
Material & Lab Technician 1 Bln 9 -
Material & Lab Technician 2 Bln 8 -

3 Supporting Staff
Operator Komputer Bln 10 -

Sub Total -

B BIAYA LANGSUNG NON PERSONIL


1 Mobilisasi / Demobilisasi
Site Engineer Return 1 -
Ahli Kualitas Return 1 -
Taxi from / to airport Return 2 -

2 Mobilisasi / Demobilisasi ke Lokasi


Site Engineer Return 1 -
Ahli Kualitas Return 1 -
Inspector Return 2 - -
Surveyor Return 2 -
Material & Lab Technician Return 2 -
Operator Komputer Return 1 - -
HARGA SATUAN TOTAL BIAYA
NO URAIAN SATUAN VOLUME
(Rp) (Rp)

3 Perjalanan Dinas + Akomodasi lainnya


Tiket/Ongkos Transportasi Return 10 - -
Uang Harian OH 0 -
Uang Penginapan OH 0 -

4 Biaya Perjalanan Ke Pusat


Tiket/Ongkos Transportasi Return 1 - -
Uang Harian OH 5 -
Uang Penginapan OH 4 -

5 Sewa Kantor Bln 10 -

6 Sewa Rumah Profesional Staff Bln 10 -

7 Sewa Kamar Sub Profesional Staff Bln 10 -

8 Sewa Mobil dan Sepeda Motor


Sewa Kendaraan Roda 4 dan operasional Bln 10 -
Sewa Kendaraan Roda 2 (10 unit) dan operasional Bln 62 -

9 Sewa Genset Bln 10 -

10 Perlengkapan K3 (Savety Health) org / psg 8 -


- Baju + Rompi + Kaos + Topi + Helm
- Mantel Hujan
- Sepatu
- Helm Proyek
- Masker
- Kacamata

11 Bahan Operasional Kantor


a. Sewa Komputer + Printer A4 & A3 1 unit Bln 10 -
b. Sewa Laptop + Printer utk Site Engineer 1 unit Bln 10 -
c. Bahan Operasional Kantor Bln 10 -
d. Komunikasi Kantor (Telp, Fax, Internet, Pos) Bln 10 -

12 Laporan
Laporan Pendahuluan + foto (7xPaket) Buku 21 -
Laporan Bulanan (7x7x Paket) Buku 154 -
Laporan Teknis (7xPaket) + CD Buku 21 -
Laporan Pengujian Mutu (7xPaket) + CD Buku 21 -
Laporan Akhir (7xPaket) Set 21 -

Sub Total -
Total TIM II -
REKAPITULASI BIAYA
HARGA PERHITUNGAN SENDIRI (HPS)

SATUAN KERJA : PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI MALUKU

PEKERJAAN : PENGAWASAN TEKNIS JALAN DAN JEMBATAN DI PULAU SERAM 2

LOKASI : PULAU SERAM

JANGKA WAKTU : 12 (DUA BELAS) BULAN

SUMBER DANA : APBN 2018

No. URAIAN JUMLAH (Rp.)

TIM I

1.1 BIAYA LANGSUNG PERSONIL -

1.2 BIAYA LANGSUNG NON PERSONIL -

TIM II

1.1 BIAYA LANGSUNG PERSONIL -

1.2 BIAYA LANGSUNG NON PERSONIL -

TOTAL SUB BIAYA -

PPN 10 % -

TOTAL BIAYA -

DIBULATKAN -

TERBILANG :

Ambon, ………………………………... 2017

PT …………………………………

…………………………………………………..
(Direktur Utama / Kepala Cabang)