TIMES DIM RESULT DESCRIPTION UNIT QTY

W.B.L.F.F.
Excvt. top soil
length
7.800
Add fdn. spr.
1.200/2
1.200/2 1.200
1.200 9.000

breadth
13450

Add fdn. spr.


1.200/2
0.900/2
1.050 1.050
14.5

9.00 [ Excvt. top soil for preservn. avg. 100


14.50 130.50 [ mm deep
m2 130.50
9.00 [Dep. preserved top soil in temp. spoil heaps avg.
14.50 15.000 m dist.
0.10 13.05 [ m3 13.05
Surc. excvn.
depth
conc. bed 0.100
hardcore 0.100
sand 0.025
0.225
Less top soil
excvn. 0.100
0.125

9.00 [ Exvct. to red. lev. max. depth n.e. 250mm


14.50 [& Rem. excvt. mat. from site.
0.13 16.97 [ m3 16.97

F1 pit excvn.
depth
lean 0.025
ftg. 0.300
stump 0.750
1.1
Less excvn.
top soil 0.100
red lev 0.125 0.225
0.875

10/ 0.90 [ Excvt. pit to rec. col. bases startg. from red. lev.
0.90 [ max. depth n.e. 0.50 m
0.88 7.13 [ (In No. 10) m3 7.13
[&
[ Fillg. to excvn. w. mat. arising from excvn.
10
10 0.90 [ E.o pit excvn. for excvtg. in rock
100 0.90 [ (Prov.)
10/ 0.88 0.71 [ m3 0.71

F2 pit excvn.
depth
lean 0.025
ftg. 0.300
stump 0.750
1.1
Less excvn.
top soil 0.100
red lev 0.125 0.225
0.875

8/ 1.20 [ Excvt. pit to rec. col. bases startg. from red. lev.
1.20 [ max. depth n.e. 0.50 m
0.88 10.14 [ (In No. 8) m3 10.14
[&
[ Fillg. to excvn. w. mat. arising from excvn.
8
10 1.20 [ E.o pit excvn. for excvtg. in rock
100 1.20 [ (Prov.)
8/ 0.88 1.01 [ m3 1.01

1-3/G,E,D,B Tr. Excvn

length
7.8
Less col.st 0.125
3/0.225 0.675
7.25

depth
0.35
Add blindg. 0.050
0.4

Less excvn
top soil 0.100
red. lev 0.125 0.225
0.175

4/ 7.25 [Excvt. tr. to rec. grd. bm. starting from red. lev.
0.13 [depth n.e. 0.175m
0.18 0.68 [ & Rem. excvtd. mat. from site m3 0.68

10 1.83 [ E.o tr. excvn. for excvtg. in rock


100 0.13 [ (Prov.)
4/ 0.18 0.02 [ m3 0.02

1-2/C Tr. Excvn

length
3.6
Less col.st 0.125
2/0.125 0.250
3.475

depth
0.175

Add blindg. 0.050


0.4

Less excvn
top soil 0.100
red. lev 0.125 0.225
0.175

[Excvt. tr. to rec. grd. bm. starting from red. lev.


[depth n.e. 0.175m
[ & Rem. excvtd. mat. from site

10 3.48 [ E.o tr. excvn. for excvtg. in rock


100 0.13 [ (Prov.)
4/ 0.18 0.03 [ m3 0.03

1-(A-G) & 3-(A-G) Tr. Excvn

length
11.35
Less col.st 0.125
2/0.125
3/0.225 0.925
10.55

depth
0.35

Add blindg. 0.050


0.4

Less excvn
top soil 0.100
red. lev 0.125 0.225
0.175

[Excvt. tr. to rec. grd. bm. starting from red. lev.


[depth n.e. 0.175m
[ & Rem. excvtd. mat. from site

10 10.55 [ E.o tr. excvn. for excvtg. in rock


100 0.13 [ (Prov.)
2/ 0.18 0.50 [ m3 0.50

1B-2B Tr. Excvn

length
2.7
Less.beam.st
0.125
2/0.125
2 1.125
2.7

depth
0.35

Add blindg. 0.050


0.4

Less excvn
top soil 0.100
red. lev 0.125 0.225
0.175
[Excvt. tr. to rec. grd. bm. starting from red. lev.
[depth n.e. 0.175m
[ & Rem. excvtd. mat. from site

10 2.70 [ E.o tr. excvn. for excvtg. in rock


100 0.13 [ (Prov.)
2/ 0.18 0.13 [ m3 0.13

1A Tr. Excvn

length
1.5
Less.beam.st
2/0.125
2
0.125
1.375

depth
0.35

Add blindg. 0.050


0.4

Less excvn
top soil 0.100
red. lev 0.125 0.225
0.175

[Excvt. tr. to rec. grd. bm. starting from red. lev.


[depth n.e. 0.175m
[ & Rem. excvtd. mat. from site

1.38 [ E.o tr. excvn. for excvtg. in rock


0.13 [ (Prov.)
0.18 0.03 [ m3 0.03

F1 fdn. col.bases

10/ 0.09 [ Conc. Gr. 25 blindg. n.e. 100mm thk. laid on earth.
0.09 [&
0.05 0.41 [ Rem. excvtd. mat. from site m3 0.41
[&
[ Ddt. Fillg. to excvn. w. mat. arising from excvn.

F2 fdn. col.bases
8/ 1.20 [ Conc. Gr. 25 blindg. n.e. 100mm thk. laid on earth.
1.20 [&
0.05 0.58 [ Rem. excvtd. mat. from site m3 0.58
[&
[ Ddt. Fillg. to excvn. w. mat. arising from excvn.

F1 fdn
10/ 0.90 [ Reinfd. insitu conc. Gr. 25 in isol. fdn. bases
0.90 [ (In No. 4)
0.30 2.43 [& m3 2.43
[ Rem. excvtd. mat. from site
[&
[ Ddt. Fillg. to excvn. w. mat. arising from excvn.

F2 fdn
8/ 1.20 [ Reinfd. insitu conc. Gr. 25 in isol. fdn. bases
1.20 [ (In No. 4)
0.30 3.46 [& m3 3.46
[ Rem. excvtd. mat. from site
[&
[ Ddt. Fillg. to excvn. w. mat. arising from excvn.

Stump 1
2/ 0.20 [
0.20 [ Reinfd. insitu conc. Gr. 20 in isol. col. stump
0.75 0.06 [ m3 0.06

Stump 2
16/ 0.13 [
0.23 [ Reinfd. insitu conc. Gr. 20 in isol. col. stump
0.75 0.34 [ m3 0.34

Stump 1 Vol. of stump inpit


ht.
0.75
Less excvn.
top soil 0.100
red. lev. 0.125 0.275
0.525

2/ 0.20 [ Rem. excvtd. mat. from site


0.20 [&
0.53 0.04 [ Ddt. Fillg. to excvn. w. mat. arising from excvn. m3 0.04

Stump 2 Vol. of stump inpit


ht.
0.75
Less excvn.
top soil 0.100
red. lev. 0.125 0.275
0.525

16/ 0.13 [ Rem. excvtd. mat. from site


0.23 [&
0.53 0.25 [ Ddt. Fillg. to excvn. w. mat. arising from excvn. m3 0.25

stump 1
gth.
4/ 0.200 0.800

2/ 0.80 [ Fwk. to sides of isol. col. stump


0.75 1.20 [ m2 1.20

stump 2
gth.
2/ 0.125 0.250
2/ 0.225 0.450
0.7
[ Fwk. to sides of isol. col. stump
16/ 0.70 11.20 [ m2 11.20

Reinft. bars in isol. col. stump


stump
length
fdn. 0.300
stump. 0.750
lap in col. 0.400
1.45
Less
conc. cov. 0.050
fdn. bars
2/ 0.010 0.020 0.070
1.38

Add bend
0.200
1.58

18/4/ 1.58 113.76 [ 10mm Dia. h.t. steel reinft. in strt. & bent bars in m 113.76
[ isol. col. stump
Stump 1 Links
gth.
width 0.200
Less
conc. cov. 2/ 0.025 0.050
4/ 0.150
= 0.600
Add
hooks 24/ 0.006 0.144
1.072

2/ [
6/ 8.93 8.93 [ 6mm Dia. m.s. reinft. in links in isol. col. stump m 8.93

Stump 2 Links
gth.
width 0.125
Less
conc. cov. 2/ 0.025 0.050
2/ 0.075
= 0.150

width 0.225
Less
conc. cov. 2/ 0.025 0.050
2/ 0.175
=0.350
0.15
0.35
=0.500
Add
hooks 24/ 0.006 0.144
0.644

16/ [
6/ 0.64 61.44 [ 6mm Dia. m.s. reinft. in links in isol. col. stump m 61.44

Blindg. to grd. bm.


length
7.8
0.125
Less col. stump
3/ 0.225 0.675
2/ 7.25 7.25
0.13 [
0.05 0.09 [ Conc. Gr. 25 blindg. n.e. 100mm thk. laid on earth m3 0.09
[

Blindg. to grd. bm.


length
11.475
Less col. stump
2/0.125
3/ 0.225 0.925
10.55

2/ 10.55 [
0.13 [ Conc. Gr. 25 blindg. n.e. 100mm thk. laid on earth
0.05 0.14 [ m3 0.14

2/ 7.25 [
0.13 [ Reinfd. In-situ conc. Gr. 25 in grd. bm.
0.35 0.66 [ m3 0.66

2/ 10.55 [
0.13 [ Reinfd. In-situ conc. Gr. 25 in grd. bm.
0.35 0.96 [ m3 0.96

Fwk. to fdns. & beds


Fdn.
4/ 0.900 3.600

10/ 3.60 36.00 [ Fwk. to edges & faces of fdn. exceedg. 250mm & m 36.00
[ n.e. 500mm high

Fdn.
4/ 1.200 4.800

8/ 4.80 38.40 [ Fwk. to edges & faces of fdn. exceedg. 250mm & m 38.40
[ n.e. 500mm high

2/2 7.25 29.00 [ Fwk. to grd. bm. exceedg. 250mm & n.e. 500mm m 29.00
[ high

2/2 10.55 42.20 [ Fwk. to grd. bm. exceedg. 250mm & n.e. 500mm m 42.20
[ high

Pad ftg.
length
0.9
Less
conc. cover b/s
2/ 0.050 0.100
0.8
Add
2 bends 0.300

Less
2 conc. cov. 0.100
2/ 0.200 0.400
1.61

10/ [ 10mm Dia. h.t. steel reinft. in strt. & bent bars in
20/ 0.40 80.00 [ fdn. m 80.00

grd. bm.
length
7.925
Less conc. cov.
2/ 0.038 0.076
7.849
Add 2 bends
2/ 0.300 0.600
8.449

2/ 10mm Dia. h.t. steel reinft. in strt. & bent bars in


4/ 8.45 67.60 [ fdn. m 67.60

stirrups
grd. bm.
gth.
width
0.125
Less
cov. 2/ 0.038 0.076
0.049

ht. 0.350

Less
cov. 2/ 0.038 0.076
0.274
2/ 0.540
=0.646
Add
hooks 24/ 0.008 0.192
0.838
2/ [ 8mm Dia. m.s. reinft. in stirrups in fdn.
193/ 0.84 323.47 (grd. bms. m 323.47

H/c & d.p.m.


width
7.925
Less
3 stumps 3/ 0.225 0.675
7.25

length
11.475
Less
2 stumps 2/ 0.125
3 stumps 3/ 0.225 0.925
10.55

7.25 [ Fillg. to make up lev. avg. 150mm thk. w. h/c. of


10.55 76.49 [ clean hard broken stones obtained off site m2 76.49
[&
[ Polyethlene not less than 1000 gauge horiz. d.p.m
[ lappd. 100mm at jts. laid on h/c

7.25 [ Conc. Gr. 25 in bed 100mm thk. laid on h/c


10.55 [
0.10 7.65 [ m3 7.65