Penampang Sumur Pip-2: (Miring/Directional)

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 1

24 Desember 2017

PENAMPANG SUMUR PIP-2


(MIRING/DIRECTIONAL)

DATA TEKNIK

Koordinat Permukaan : E = 293.855.57 m N = 9.640.314.14 m


Koordinat Bawah Permukaan: E = 294.329.84 m N = 9.640.313.70 m
14" 200.00 m Azimuth : -
K55 ; 133 ppf KOP : 450
LBA : 61.66 (55.36) m
LBA-FD : 6.3 (5.5) m
Well Head : 13 5/8" x 11" x 7 1/16" x 3k psi
X-Mast Tree : 3 1/8" x 3 1/8" x 3000 psi
Tubing :
101 jts Tbg 3 ½” EUE N80-9.3 ppf-8RD + Packer 7” G-6 + 1 Jts Tbg 3 ½” EUE + Bell Shoe.
Set Packer @ 938.17 m. UR @ 948.19 m.

KSB : Tidak ada


Pek. Terakhir : Perforasi lapisan BRF (1533.1-1534.4 ) m dengan Wireline Casing Gun 4 ½” HSD HMX,
Nobel Deto, 236 PJ 4512, 6 spf. Tgl. 26 Desember 2017

9.5/8" 500.00 m KOMPLESI SUMUR


K55 ; 54.5 PRODUKSI
LAPISAN PERFO. GROSS NET KA GAS
TGL.
BFPD BOPD % MMSCFD
BRF 1533.1-1534.4 24/12/2017

6.5/8" 900.00 m
J55 ; 36 ppf
BTC R3

HAMBATAN
Tubing ID" 2,441
Packer OD" 2.7/8"

interval perforation
Z Z 1533.1-1534.4 m

4.1/2" LEGEND :
K55 ; 23 ppf 1540.00 m X : Lubang Tertutup (Squeeze) : Semen : KSB
BTC R3
Z : Lubang perforasi : CR : SSD

TD = 1540 mKU/1500 mKT : Packer : BP