CARLTON INDUSTRIAL ENGINEERS

NDE REQUISITION

Date: 06.12.2017

To : NDE Personnel
Kindly carry out NDE for the following location as per ASME Code requirement:
Type of NDE : RT
Project : Revamping of Gas Injection System
Applicable Code : ASME SEC V ED 2015
Material Specification : SA 106 GR B
Base Material Thickness : Mentions below
Welding Process : GTAW + SMAW

Locations:

Sr.No
Item Description Punching Detail Size

1 Flange to Elbow 2”-P-E1N-1304(NLM-2) J27 WD-136 60.3 X 11.07MM OD 60.3 X 11.07MM

2 Elbow to Pipe 2”-P-E1N-1304(NLM-2) J28 WD-136 60.3 X 11.07MM OD 60.3 X 11.07MM

3 Pipe to Flange 2”-P-E1N-1304(NLM-2) J34 WD-136 60.3 X 11.07MM OD 60.3 X 11.07MM

4 Flange to Elbow 2”-P-E1N-1302(HB) J11 WD-136 60.3 X 11.07MM OD 60.3 X 11.07MM

5 Pipe to Flange 2”-P-E1N-1306(HB) J41 WD-136 60.3 X 11.07MM OD 60.3 X 11.07MM

6 Pipe to Tee 2”-P-E1N-1309(HB) J7 WD-136 60.3 X 11.07MM OD 60.3 X 11.07MM

7 Tee to Pipe 2”-P-E1N-1309(HB) J8 WD-136 60.3 X 11.07MM OD 60.3 X 11.07MM

8 Tee to Pipe 2”-P-E1N-1309(HB) J9 WD-136 60.3 X 11.07MM OD 60.3 X 11.07MM

9 Pipe to Tee 2”-P-E1N-1311(HB) J7 WD-136 60.3 X 11.07MM OD 60.3 X 11.07MM

________________
QC Engineer

CIE/NDE/REQ-1 REV 0