Quality Documents
Process xxxxxx
Inspection Key
Scrap/ Contain
Changeover
Movement
Operation
Store/Get
Rework
Process
Inspect
Move
Sequence Process Step Equipment Used
Number
A
A
Product: Changeover Key
iagram Drawing Number: P = Product D = Dunnage
Prepared By:
xx Supplier:
T = Tooling
S = Software
L = Label
Type of Measurement
Product Measurement
Set Up CTQ In Process Visual
oduct: Date Prepared: (DD/MM/YY)
awing Number: Effective Date: (DD/MM/YY)
epared By: Revision
pplier: 1
rement Drawing
Status Process Identification Approval
Visual Type
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
AS Inspection Control Plan
Product: xxxxxx
Measurement Desc
Measurement Inspection Location/Machine
Measurement Description
Reference (English) Language If
Product: Date Prepared: (DD/MM/YY)
ol Plan Drawing Number: Effective Date: (DD/MM/YY)
Prepared By: Revision
x Supplier: 1
Risk Scores
Type of Measurement
Severity Occurrence Quantity Detection
Set Up CTQ In Process Visual Type
Number Produced Score Quantity Risk Score Key Number Produced Score Quantity Risk Score Key
1-Feb Low 1 Quantity = Number of <100/hr Low 1
Quantity = Number of pieces th
2-Oct Medium 5 pieces the machine could 100-400 Medium 5 machine could produce in an hou
>10 High 10 produce in an hour. >400/ hr High 10
Measurement Method -
Inspection Frequency Calibration Procedure Number
Risk Score Gauge Type
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
uantity Risk Score Key Number Produced Score Number Produced Score
Measurement will pass GRR <20% Low 1 Visual High 10
ty = Number of pieces the Measurement will pass GRR 30-40% Medium 5
e could produce in an hour.
Measurement will pass GRR >40% High 10
Gauge RR Results Capability
Reaction Plan Reference
GRR Short Term Long Term Number
Complete % Tol % Process
Cp Cpk Pp Ppk
n Plan Reference
Number
FMEA Date (Orig.) : (DD/MM/YY)
FMEA Number : (DD/MM/YY)
FMEA Rev No:
FMEA Dates FMEA date (Revision) : (DD/MM/YY)
Supplier
Process Step/ Function Potential Failure Mode Potential Effects of Failure Causes of Fai
AS Process FMEA
Product/Process: xxxxxx
Class
-
C Critical
FMEA Key I Important
F Functional
U Unimportant
Total Score 0
Recommended Improvements
of Potential Current process Controls Current process Controls
P R IPR
ailure Prevention Detection
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Product: Date Prepared: (DD/MM/YY)
Drawing Number: Effective Date: (DD/MM/YY)
Prepared By: Revision
Supplier: 1
Detection Scoring Key
Core Team
R
ction AQL (9) - No Inspection (10) Team Members Name
ple (8) - 100% Using Go No-Go Gauges (7)
- 100% Manual Inspection (6)
% Automatic Inspection(2)
us or 100% Automatic inspection(1)
Current process
mended Improvements Responsibility for Action Action Actually Taken Date Completed
New Score
G
red: (DD/MM/YY)
ate: (DD/MM/YY)
Revision
1
Job Function
New Score 0
G P R IPR
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Product Submission Warrant
AWI Product Details
Product Name Cust. Product Number
MATERIALS REPORTING
n
Has customer-required Substances of Concern information been reported?
Yes No /
Submitted by IMDS or other customer format: a
n
Are polymeric Products identified with appropriate ISO marking codes?
Yes No /
Are the Statutory and Homologation test passed be the Product ? n
a
Yes No /
a
REASON FOR SUBMISSION
Level 1 - Warrant only (and for designated appearance items, an Appearance Approval Report) submitted to customer.
Level 2 - Warrant with product samples and limited supporting data submitted to customer.
Level 3 - Warrant with product samples and complete supporting data submitted to customer.
Level 4 - Warrant and other requirements as defined by customer.
Level 5 - Warrant with product samples and complete supporting data reviewed at organization's manufacturing location.
SUBMISSION RESULTS
The results for dimensional material and appearance statistical process
These results meet allmeasurements
design record requirements: functional tests criteria
(If "NO" package
- Explanation Required)
Yes NO
Mold / Cavity / Production Process
DECLARATION
I affirm that the samples represented by this warrant are representative of our Products, which were made by a process that meets all
Production Product Approval Process Manual 4th Edition Requirements. I further affirm that these samples were produced at the
production rate of ____/____ hours. I also certify that documented evidence of such compliance is on file and available for your review.
I have noted any deviation from this declaration below.
EXPLANATION/COMMENTS:
Product: xxxxxx
Gauge Drawing Nu
d For Measuring Measuring Equipment Model Sample Photo Relevant
Date Prepared: (DD/MM/YY)
Effective Date: (DD/MM/YY)
Revision
1
Colour: xxxxxx
Colour Description RAL Code If Relevant Paint Supplier Paint Supplier RM Code
L - Max
L
Product:
re Coat Colour Agreement Drawing Number:
L - Max L - Min A- Max A - Min B- Max B- Min dE- Max dE- Min Gloss Max
Supplier Readings
Thickness
L B A dE Gloss Thickness Hardness Adhesion Max
CTQ
Producton
Measur
ement Visual
Product
Measuring tool
x
x
x
x
x
x
BL302
ok
Control at
Process No.
update
drawing
not needed
BL302 MEGA
ok - in improvement
Control at
Process No.
update
drawing
in improvement - go/nogo
no detection - in improvement
RL201
update drawing - ok - in improvement
Control at
OK
Process No.
drawing
RL201 MEGA
Control at
OK
Process No.
drawing
Process No.
FL601
I65 Cutting
E09 Molding
E20 Laser Cutting
Control at
OK
E18 Manual Cutting
Process No.
drawing
RH215
E37 Notching Man. e/o PXN
Control at
OK
Process No.
drawing
RH215 MEGA
Control at
OK
E24
E16
E40
E19
E13
Process No.
drawing
RH215 END
Folding
Painting
Roll forming
Control at
to be
Process No.
tested
Manual Welding
Assembing (Robot)
RH200
Control at
OK
Process No.
drawing
RH200 LONG
Control at
OK
Process No.
drawing
RH200 MEGA
Control at
OK
Process No.
drawing
FH600
Control at
OK
Process No.
drawing
DH700
Control at
Process No.
update comments
DH700 MEGA
Control at
Process No.
update comments
BH300
Control at
Process No.
OK drawing
xx
Control at
Process No.
xx
Control at
Process No.
OK drawing
xx
Control at
Process No.
OK drawing
xx
Control at
Process No.
OK drawing
xx
Control at
Process No.
OK drawing
xxx
Control at
Process No.
OK drawing
xxx
Control at
Process No.
update comments