Development Organization Of 6 October City
Waste Water Treatment Plant ( 150000m3 )
General Site
ELECTRICAL WORKS
BILL OF QUANTITIES
Description
LOW VOLTAGE CABLES
Supply, install, test and put into operation
the following low-voltage XLPE/ SWA/
PVC,sheathed, copper cables 1.0 kv. laid in
trenches, and/or over cable trays. and/or
inside pve conduits, the price should
include manholes, conduits, cable trays
trenches, duct bank, excavation,
backfilling and The work should include
all other accessories required to complete
the work according to drawings and
specification and with a cross section.
(3 x 3004150) ) mm? +1 x 150mmE.C.C.
(3.x 240+120) ) mm? +1 x 120mm?E.C.C
(3.x 185+95)) mm? +1 x 95mmE.C.C
(3 x 150+70) ) mm? + 1 x 70 mm? E.C.C
(3 x 95450) ) mm? +1 x $0 mm? E.C.C
(3 x 70+35) ) mm? + 1.x 35 mnPE.C.C
(Bx 50#25) mm? + 1x 25 mm? E.C.C
(3 x 35+16) mm? + 1x 16 mm? E.C.C
(4x 16)) mm? +1 x 16 mm?E.C.C
(4x 10)) mm? +1 x 10 mmE.C.C FOR
LIGHTING POLES
TOTAL OF THE PAGE
2
‘Addendum—1- 25% May 2016