Download as pdf
Download as pdf
You are on page 1of 1
Development Organization Of 6 October City Waste Water Treatment Plant ( 150000m3 ) General Site ELECTRICAL WORKS BILL OF QUANTITIES Description LIGHTING POLES :- Supply, install, test and put into operation lighting poles galvanized steel(10m height) with one arc frame , led lighting fixtures (93 watt), wiring by using wires 3 x 4 mm2 connections , completed with concrete base awinch motor and all other fittings and accessories required to complete the work. MATERIALS. Supply, install, test and put into operation the load break switches inside galvanized box IP 65, weather proof mounted on galvanized pedestal ,complete with all accessories and as specified and shown on the drawings. 3-phases load break switch ,4 terminals, with rating 380V , 40A (Fused) 3ephases load break switch ,4 terminals, with rating 380V , 63 ( Fused) 3-phases load break switch ,4 terminals, with rating 380V , 80A (Fused) 3ephases load break switch ,4 terminals, with rating 380V , 100A (Fused) 3-phases load break switch ,4 terminals, with rating 380V , 200A ( Fused) TOTAL OF THE PAGE 3 ‘Addendum —1- 25% May 2016

You might also like