Development Organization Of 6 October City
‘Waste Water Treatment Plant ( 150000m3 )
General Site
ELECTRICAL WORKS
BILL OF QUANTITIES
‘DISTRIBUTION BOARDS
Supply, install, test and put into operation
the main low voltage Distribution board,
heavy, weather proof if needed, duty, self-
supporting cabinet design, —_ factory
assembled. The price includes all
accessories required to complete the work
a specified and shown on the drawings.
MDBI1-STAGE1
MDB2-STAGE1
MDBI-STAGE2
‘MDB2-STAGE2
MDBI-STAGE3
MDB2-STAGE3
MDBI-BIO-AIROTION BLOWERS
SUB MAIN DISTRIBUTION BOARDS:
Supply, install, test and put into operation
the sub main low voltage Distribution
board. , heavy, duty, weather proof if
needed , self-supporting cabinet design,
factory assembled. The price includes all
accessories required to complete the work
as specified and shown on the drawings.
DB-AD-G.TH
DB- FILTER HOUSE
DB-PST
DB-FST
DB-THS.T.P
DB- MDB
DB-STORE BUILDING
DB-INLET WORKS.
DB-BRESSING& SHOWERING.
DB-DSPS
DB-SDPS
DB-INFORMATION OFF.
DB-GUARD TOWER.
DB-LAYI
LP-LAY2.
‘Addendum —1- 25% May 2016