ملحق 4 6

You might also like

Download as pdf
Download as pdf
You are on page 1of 1
Development Organization Of 6 October City Waste Water Treatment Plant ( 150000m3 ) General Site ELECTRICAL WORKS BILL OF QUANTITIES Description Supply, install, test and put into operation the earthing system, includes but not be limited (the earthing pits, underground earthing connection cables, the potential equalizer bar and the connection to all metallic parts,...etc) as specified. The earthing resistance should be not more than 1 ohm at cach end. The price should include all accessories required and all electrical soil resistively tests, calculating note, to complete the work as specified with good workmanship. for all the structures in (site - 3). as the following buildings: -Primary settling tanks -Final settling tanks -Aeration tanks -Aerobic digestion, thickeners structures ~ Evacuating pump station. Supply, install, test and put into operation the foundation earthing system The price should include all accessories required to complete the work as specified and with good workmanship. for all the structures in site ~ 3, as the following buildings:- Primary settling tanks -Final settling tanks ~Aeration tanks -Aerobic , digestion, thickeners structures - Evacuating pump station. TOTAL OF THE PAGE. 4 ‘Addendum -1- 254 May 2016

You might also like