ELECTRICAL WORKS
BILL OF QUANTITIES
Description
Supply, install, test and put into operation
the earthing system, includes but not be
limited (the earthing pits, underground
earthing connection cables, the potential
equalizer bar and the connection to all
metallic parts,...etc) as specified. The
earthing resistance should be not more than
1 ohm at cach end. The price should
include all accessories required and all
electrical soil resistively tests, calculating
note, to complete the work as specified
with good workmanship. for all the
structures in (site - 3). as the following
buildings:
-Primary settling tanks
-Final settling tanks
-Aeration tanks
-Aerobic digestion, thickeners structures
~ Evacuating pump station.
Supply, install, test and put into operation
the foundation earthing system The price
should include all accessories required to
complete the work as specified and with
good workmanship. for all the structures
in site ~ 3, as the following buildings:-
Primary settling tanks
-Final settling tanks
~Aeration tanks
-Aerobic , digestion, thickeners structures
- Evacuating pump station.
TOTAL OF THE PAGE.
4
‘Addendum -1- 254 May 2016