Qd = 85 m³/s Q

A Spill way design 35.23603

46.31897

58.36857

71.31272
DISCHARGE Q =m*c* B*(2g)^(1/2)*Hₒ^(3/2) 85.09338
99.66256
109.1749
WIDTH B=60 152.5765
DISCHARGE COEFFICENT m=0.375 234.9069
ACCELERATION g = 9.81 328.2924
HEAD ABOVE CREST 431.5515
CONTRACTION FACTOR ʗ=1
Q
DESIGN FLOOD LEVEL 102.7 87
CHECK FLOOD LEVEL 104 262.64

B Energy disspipation and erosion control


Q 85
B 60
q 1.4166666667
H1 0.8
Z 6
G 9.81
V CRITICAL 10.849884792
Y CRITICAL 0.1909090909 0.2 ˂ 0.3
Fr(frouid number) 8.0571487386 7.8531371761 Vc/(G*Yc)
y2 2.1649503306
L(length of basin) 10
t (plat thikness) = h/(1-ϒm) 0.25

h ( verical oridnate depth between


water surfaces u/s and d/s)

ENBANKMENT DIMENTIONS
TOPLEVE 104.5
FORMATION LEVEL MAX SECTION 95
( HIGHT) H 9.5
U/S (2.5:1) 23.75
D/S (2:1) 19 242.25
TOTAL WIDTH 46.75 47
SPILLWAY DIMENTIONS
TOPLEVE 101.5
FORMATION LEVEL MAX SECTION 95
( HIGHT) H 6.5
U/S (3:1) 19.5 20
D/S (4:1) 26 26
TOTAL WIDTH 50 38
BASIN 12 62

West Embankment Grdoud Elzibil


G.l 98.5
formation level 97.5
max flood level 102.2
free baord 1.3
crest level 103.5
wave wall 1.2m
wave wall level 104.7
dam hight 6
slope u/s 2.5:1 15 15
slope d/s 2:1 12 12
top width 4
total enbakment width 31 max section
water depth 1.5
Cutoff trench
trench depth 1.5
width 2
H Q Hₒ

0.5 45.73567 0.5

0.6 60.1211 0.6

0.7 75.76124 0.7

0.8 DISCHARGE Q = C* B*Hₒ^(3/2) 92.56248 0.8


0.9 110.4495 0.9
1 129.36 1
1.2 WIDTH 60 170.0481 1.2
1.5 DISCHARGE COEFFICENT 2.2 237.6495 1.5
2 HEAD ABOVE CREST Hₒ 365.8853 2
2.5 511.3403 2.5
3 672.1743 3

5.5

sreight drop

15 d/s
18.75 u/s 228 49.56522

37

emergency level check


top 104.5
spillway crest 101.5
ground 96.5
base 97.5 98
invert 98
top 100.3
depth 4.2 16.9
d/s length 8.4

total depth 5
u/s spillway 15
d/s spillway 20
6.5 totalwidth 35 plus
emptying tunnel length 28 13

5 total wall higt basin 5


basin floor level 95.3
top wall level 98.7
bottom basin wall level 93.7

0.249474
1.625 delta verticales
6.5 l d/s
datum 99.64
101.26 1.62
102.88 3.24
104.5 4.86

98.26

Q=Cd. A
Q=Cd. A
, 35=.65*A*(2*9.81*0.55)
A=16.4m {2 gates/(3*2)}, can be used.
3.5 10.5 14 24.5

14

delta verticales

wall depth
96.64
98.26
99.88
dam section
Distance datum m R.L Distance
0 47 21 26 7.43 107.43 0
25 32 21 11 3.14 103.14 25
50 26 21 5 1.43 101.43 50
75 21 21 0 0.00 100.00 75
100 10 21 -11 -3.14 96.86 100
125 9.5 21 -11.5 -3.29 96.71 125
150 9 21 -12 -3.43 96.57 150

160 7 21 -14 -4.00 96.00 160


175 12 21 -9 -2.57 97.43 175
180 11 21 -10 -2.86 97.14 180
200 11 21 -10 -2.86 97.14 200
210 14 21 -7 -2.00 98.00 210
225 15.5 21 -5.5 -1.57 98.43 225
250 16 21 -5 -1.43 98.57 250
275 17 21 -4 -1.14 98.86 275
300 19 21 -2 -0.57 99.43 300
325 18 21 -3 -0.86 99.14 325
350 17 21 -4 -1.14 98.86 350
375 19 21 -2 -0.57 99.43 375
400 21 21 0 0.00 100.00 400
425 24 21 3 0.86 100.86 425
450 30 21 9 2.57 102.57 450
475 35 21 14 4.00 104.00 475
500 39 21 18 5.14 105.14 500
525 45 21 24 6.86 106.86 525
550 50 21 29 8.29 108.29 550
R.L
107.43 0,107.428571428571
103.14 25,103.142857142857
101.43 50,101.428571428571
100.00 75,100
96.86 100,96.8571428571429
96.71 125,96.7142857142857
96.57 150,96.5714285714286

96.00 160,96
110.00
97.43 175,97.4285714285714
97.14 180,97.1428571428571
97.14 200,97.1428571428571 105.00
98.00 210,98
98.43 225,98.4285714285714
100.00
98.57 250,98.5714285714286
98.86 275,98.8571428571429
99.43 300,99.4285714285714 95.00
99.14 325,99.1428571428571
98.86 350,98.8571428571429
99.43 375,99.4285714285714 90.00
100.00 400,100
100.86 425,100.857142857143 85.00
102.57 450,102.571428571429 0 100 200 300 400 500
104.00 475,104
105.14 500,105.142857142857
106.86 525,106.857142857143
108.29 550,108.285714285714
layout
0
50
100
150
200
Column K 250
300
350
400
450
500
550
200 300 400 500 600 600
650
700
750
800
850
900
950
1000

0
50
100
150
200
250
300
350
400
450
500
550
600
650
700
750
800
850
900
950
1000
109
x y z
309600 1334950 109.81
309650 1334950 108.8
309700 1334950 108
309750 1334950 107.1
309800 1334950 106.56
309850 1334950 105.7
309900 1334950 104.67
309950 1334950 103.4
310000 1334950 102.24
310050 1334950 101.5
310100 1334950 101.14
310150 1334950 100.14
310200 1334950 99.5
310250 1334950 99.58
310300 1334950 99.5
310350 1334950 99.25
310400 1334950 99
310450 1334950 98.7
310500 1334950 98.6
310550 1334950 98.5
310600 1334950 98.38

309600 1334900 109.5


309650 1334900 108.83
309700 1334900 107.5
309750 1334900 107.21
309800 1334900 106.86
309850 1334900 106.17
309900 1334900 104.69
309950 1334900 103.67
310000 1334900 102.19
310050 1334900 101.3
310100 1334900 100.5
310150 1334900 100.14
310200 1334900 99.5
310250 1334900 99.81
310300 1334900 99.9
310350 1334900 99.5
310400 1334900 98.9
310450 1334900 98.6
310500 1334900 98.5
310550 1334900 98.38
310600 1334900 98.3

309600 1334850 108.83


309650 1334850 107.38
309700 1334850 107.13
309750 1334850 106.8
309800 1334850 106.13
309850 1334850 105.5
309900 1334850 104.38
309950 1334850 103.5
310000 1334850 101.95
310050 1334850 101
310100 1334850 98.5
310150 1334850 98.88
310200 1334850 99.5
310250 1334850 100.25
310300 1334850 100.69
310350 1334850 100.6
310400 1334850 100.5
310450 1334850 99.89
310500 1334850 99.5
310550 1334850 99.38
310600 1334850 99.1

309600 1334800 107.67


309650 1334800 106
309700 1334800 105.8
309750 1334800 105.5
309800 1334800 104.75
309850 1334800 103.67
309900 1334800 102.7
309950 1334800 102.5
310000 1334800 101.5
310050 1334800 100.45
310100 1334800 98
310150 1334800 99.88
310200 1334800 100.81
310250 1334800 100.82
310300 1334800 101.09
310350 1334800 100.78
310400 1334800 99.83
310450 1334800 99.23
310500 1334800 98.93
310550 1334800 98.7
310600 1334800 98.5

309600 1334750 106


309650 1334750 104.17
309700 1334750 104.13
309750 1334750 103.88
309800 1334750 103.4
309850 1334750 102.5
309900 1334750 101.77
309950 1334750 101.63
310000 1334750 100.79
310050 1334750 100.24
310100 1334750 98.5
310150 1334750 100.79
310200 1334750 101.5
310250 1334750 101.5
310300 1334750 101.13
310350 1334750 100.5
310400 1334750 99.28
310450 1334750 98.79
310500 1334750 98.64
310550 1334750 98.4
310600 1334750 98.36

309600 1334700 104.5


309650 1334700 102.5
309700 1334700 102.44
309750 1334700 102.63
309800 1334700 102.26
309850 1334700 101
309900 1334700 100.88
309950 1334700 100.83
310000 1334700 100.17
310050 1334700 100
310100 1334700 100.36
310150 1334700 104.5
310200 1334700 102.5
310250 1334700 101.5
310300 1334700 99.6
310350 1334700 98.93
310400 1334700 98.74
310450 1334700 98.61
310500 1334700 98.38
310550 1334700 98.3
310600 1334700 98.2

309600 1334650 103


309650 1334650 102.06
309700 1334650 102
309750 1334650 101.7
309800 1334650 101.25
309850 1334650 100.5
309900 1334650 100.28
309950 1334650 99.93
310000 1334650 99.5
310050 1334650 98.59
310100 1334650 99.7
310150 1334650 102.5
310200 1334650 106
310250 1334650 102.24
310300 1334650 101
310350 1334650 99.5
310400 1334650 98.79
310450 1334650 98.61
310500 1334650 98.35
310550 1334650 98.25
310600 1334650 98.15

309600 1334625 103


309650 1334625 102.06
309700 1334625 102
309750 1334625 101.7
309800 1334625 101.25
309850 1334625 100.5
309900 1334625 100.28
309950 1334625 99.93
310000 1334625 99.57
310050 1334625 98.59
310100 1334625 107
310150 1334625 108.5
310200 1334625 1011
310250 1334625 101.5
310300 1334625 101
310350 1334625 99.6
310400 1334625 98.79
310450 1334625 98.61
310500 1334625 98.35
310550 1334625 98.25
310600 1334625 98.15

309600 1334600 101.5


309650 1334600 99.5
309700 1334600 100.75
309750 1334600 100.8
309800 1334600 100.33
309850 1334600 99.67
309900 1334600 99.5
309950 1334600 99.38
310000 1334600 99
310050 1334600 99.89
310100 1334600 99.57
310150 1334600 100
310200 1334600 103.5
310250 1334600 101
310300 1334600 100
310350 1334600 100
310400 1334600 99.65
310450 1334600 98.64
310500 1334600 99.4
310550 1334600 99.38
310600 1334600 98.15

309600 1334575 101.5


309650 1334575 99.5
309700 1334575 100.75
309750 1334575 100.8
309800 1334575 100.33
309850 1334575 99.67
309900 1334575 99.5
309950 1334575 99.38
310000 1334575 99
310050 1334575 99.89
310100 1334575 99.57
310150 1334575 98.88
310200 1334575 107
310250 1334575 101
310300 1334575 100
310350 1334575 100
310400 1334575 99.65
310450 1334575 98.64
310500 1334575 99.4
310550 1334575 99.38
310600 1334575 98.2

309600 1334550 100.33


309650 1334550 99.83
309700 1334550 100
309750 1334550 100
309800 1334550 99.72
309850 1334550 99.27
309900 1334550 98.82
309950 1334550 98.38
310000 1334550 97.75
310050 1334550 97
310100 1334550 98.88
310150 1334550 99
310200 1334550 101
310250 1334550 100.64
310300 1334550 99.31
310350 1334550 99.2
310400 1334550 98.43
310450 1334550 98.3
310500 1334550 98.15
310550 1334550 98.15
310600 1334550 98

309600 1334500 99.91


309650 1334500 99.81
309700 1334500 99.669
309750 1334500 99.55
309800 1334500 99.35
309850 1334500 99.12
309900 1334500 98.76
309950 1334500 98.35
310000 1334500 97.71
310050 1334500 97.55
310100 1334500 97.93
310150 1334500 98
310200 1334500 98
310250 1334500 98.75
310300 1334500 98.7
310350 1334500 96.8
310400 1334500 98.3
310450 1334500 98.15
310500 1334500 98
310550 1334500 100.2
310600 1334500 100.33

309600 1334450 99.93


309650 1334450 99.75
309700 1334450 99.61
309750 1334450 99.48
309800 1334450 99.29
309850 1334450 99.07
309900 1334450 98.72
309950 1334450 98.28
310000 1334450 97.94
310050 1334450 97.7
310100 1334450 97.66
310150 1334450 97.55
310200 1334450 97.5
310250 1334450 97.5
310300 1334450 97.88
310350 1334450 97.5
310400 1334450 98.15
310450 1334450 98.15
310500 1334450 98
310550 1334450 100.2
310600 1334450 100.33

309600 1334400 99.5


309650 1334400 99.5
309700 1334400 99.5
309750 1334400 99.56
309800 1334400 99.59
309850 1334400 99.28
309900 1334400 98.8
309950 1334400 98.44
310000 1334400 98.1
310050 1334400 97.85
310100 1334400 97.5
310150 1334400 97.97
310200 1334400 97.94
310250 1334400 98
310300 1334400 98
310350 1334400 97.5
310400 1334400 98
310450 1334400 98
310500 1334400 98.15
310550 1334400 100.33
310600 1334400 100.5

309600 1334350 99.5


309650 1334350 99.58
309700 1334350 99.73
309750 1334350 99.86
309800 1334350 99.85
309850 1334350 99.46
309900 1334350 99.13
309950 1334350 98.69
310000 1334350 98.39
310050 1334350 98.15
310100 1334350 97.88
310150 1334350 97.85
310200 1334350 99.4
310250 1334350 99.7
310300 1334350 100.33
310350 1334350 102.5
310400 1334350 103.5
310450 1334350 105.5
310500 1334350 107
310550 1334350 108
310600 1334350 110

309600 1334325 99.5


309650 1334325 99.58
309700 1334325 99.73
309750 1334325 99.86
309800 1334325 99.85
309850 1334325 99.46
309900 1334325 99.13
309950 1334325 98.69
310000 1334325 98.39
310050 1334325 98.15
310100 1334325 97.88
310150 1334325 97.85
310200 1334325 99.4
310250 1334325 99.7
310300 1334325 100.33
310350 1334325 102.5
310400 1334325 105
310450 1334325 106.5
310500 1334325 109
310550 1334325 112
310600 1334325 114

309600 1334300 99.5


309650 1334300 99.78
309700 1334300 99.93
309750 1334300 100.09
309800 1334300 100.03
309850 1334300 99.71
309900 1334300 99.46
309950 1334300 99.4
310000 1334300 98.92
310050 1334300 98.63
310100 1334300 98.38
310150 1334300 98
310200 1334300 99
310250 1334300 99
310300 1334300 99.25
310350 1334300 100.5
310400 1334300 109
310450 1334300 111
310500 1334300 112
310550 1334300 111.5
310600 1334300 113.5

309600 1334250 99.68


309650 1334250 100.06
309700 1334250 100.36
309750 1334250 100.45
309800 1334250 100.36
309850 1334250 100.08
309900 1334250 99.83
309950 1334250 99.77
310000 1334250 99.5
310050 1334250 99.27
310100 1334250 99
310150 1334250 99.17
310200 1334250 99
310250 1334250 99.17
310300 1334250 99.8
310350 1334250 99.8
310400 1334250 99.5
310450 1334250 101.5
310500 1334250 109
310550 1334250 111
310600 1334250 112

309600 1334200 100


309650 1334200 100.41
309700 1334200 100.89
309750 1334200 101.13
309800 1334200 100.7
309850 1334200 100.33
309900 1334200 100.16
309950 1334200 100.08
310000 1334200 99.79
310050 1334200 99.55
310100 1334200 99.7
310150 1334200 100.21
310200 1334200 100.36
310250 1334200 100.5
310300 1334200 101
310350 1334200 102
310400 1334200 105
310450 1334200 106.5
310500 1334200 109
310550 1334200 111
310600 1334200 112

4.1

4.2
5

5.1

5.2

5.3
Temporary
works
constructi
on of
access
road m2 27000.00 3 81000
camp
establishm
ent and
maintaine
nce ls 1.00 96000 120000
Others
mobilizatio
n and
demobliza
tion ls 50000
maintenan
ce of
equipment
and
machinare
s month 8.00 7000 56000
insurance
of project ls 1.00 25000
Gerwia Dam Estimated Cost

1 Dam body UNIT Q BILL RATE ($) AMOUNT BILL


Earth and Rock excavation, stripping
1.1 .

earth excavation of dam foundation m3 5000.00 4.5 22500

rock excavation of dam foundation m3 200.00 5 1000

stripping overburden borrow area m2 2000.00 2 4000


filling of embankment,backfilling of earth
1.2

materials,dam slope cutting m3 70000.00 9 630000

backfilling of earthwork m3 1000.00 2 2000

dam slope cuting m2 2000.00 1.5 3000


dry rock pitching,crushed stone cushion
1.3 ,coarse sand filter m3 1000.00 96 96000
m10 masonary wave wall,curb,toe
1.4 protection,asphalt slab 100.00 150 15000
c15 N.R.C road surface & c25 R.C slope
1.5 protection,key wall,form work
c15 N.R.C road surface
m3 100.00 212 21200
c25 N.R. slope protection
m3 100.00 235 23500
c25 N.R. key wall
m3 20.00 235 4700
formwork
m2 110.00 35 3850
Spillway
2
earth and rock excavation
2.1
earth excavation
m3 1400.00 4.5 6300
rock excavation
m3 100.00 5 500
filling of weir body,backfilling of
2.2 earthwork,dam slop cuting
filling of weir body
m3 18000.00 9 162000
backfilling of earthwork
m3 1000.00 2 2000
dam slop cuting
m2 1300.00 1.5 1950
c25 R.C base plate&rtaining wall
2.3
c25 r.C base plate
m3 700.00 235 164500
c25 r.c retaing wall
m3 220.00 235 51700
m10 masonary bottom protection,retaing wall
2.4
m10 masonary bottom protection
m3 700.00 150 105000
m10 masonary retaining wall
m3 700.00 150 105000
C10 N.R.C cushion ,crushed stone and coarse
2.5 sand filter
c10 N.R.C cushion
m3 200.00 358 71600
crushed stone cushine
m3 400.00 60 24000
coarse sand filter
m3 150.00 23 3450
steel bar,formwork,asphalt slab, water stop
2.6 PVC drain pipe
fabrication and setting of steel bar
t 70.00 1900 133000
formwork
m2 900.00 21 18900
copper waterstop
m 70.00 100 7000
asphalt slab
m2 40.00 45 1800
pvc drain pipe
m 90.00 30 2700
riprap
2.7 m3 200.00 70 14000
Empting tunnel
3
c25 r.c structure,steel bars,formwork
3.1
c25 r.c structure
m3 180.00 235 42300
fabrication and setting of steel bar
t 7.00 1900 13300
formwork
m2 200.00 21 4200
m10 masonary work,water stop
3.2
m10 masonary work
m3 100.00 150 15000
coper water stop
m 20.00 100 2000
c10 n.r.c cusion
3.3 m3 4.00 190 760
safety rail,steel ladder,sluice gate
3.4
saftety rail
m 9.00 120 1080
steel ladder
no 1.00 2000 2000
pgz 1.8*1.8m sluice gate
no 1.00 14000 14000

TOTAL COST 1796790


DESIGN 2% 539037

1 Dam body UNIT Q BILL RATE ($) AMOUNT BILL


1.1 Earth and Rock excavation, stripping .
earth excavation of dam foundation,cutoff
trench m3 5000.00 4.5 22500
rock excavation of dam foundation m3 250.00 5 1250
stripping overburden borrow area m2 2000.00 2 4000
1.2 filling of embankment,backfilling of earth
materials,dam slope cutting m3 80000.00 9 720000
backfilling of earthwork m3 1500.00 2 3000
dam slope cuting m2 20200.00 1.5 30300
dry rock pitching,crushed stone cushion
1.3 ,coarse sand filter m3 8080.00 96 775680
m10 masonary wave wall,curb,toe
protection,asphalt slab,road surface
1.4 protection m3 800.00 150 120000
c15 N.R.C road surface & c25 R.C slope
1.5 protection,key wall,form work
c15 N.R.C road surface m3 70.00 212 14840
c25 N.R. slope protection m3 20.00 235 4700
c25 N.R. key wall m3 60.00 235 14100
formwork m2 200.00 35 7000
2 Spillway
2.1 earth and rock excavation
earth excavation m3 3000.00 4.5 13500
rock excavation m3 700.00 5 3500
filling of weir body,backfilling of
2.2 earthwork,dam slop cuting
filling of weir body
m3 12000.00 9 108000
backfilling of earthwork m3 1000.00 2 2000
dam slop cuting m2 1950.00 1.5 2925
c25 R.C base plate&rtaining wall
2.3
c25 r.C base plate m3 1170.00 235 274950
c25 r.c retaing wall m3 220.00 235 51700
m10 masonary bottom protection,retaing wall
2.4
m10 masonary bottom protection m3 500.00 150 75000
m10 masonary retaining wall m3 1900.00 150 285000
C10 N.R.C cushion ,crushed stone and coarse
2.5 sand filter
c10 N.R.C cushion m3 390.00 358 139620
crushed stone cushine m3 700.00 60 42000
coarse sand filter m3 400.00 23 9200
steel bar,formwork,asphalt slab, water stop
2.6 PVC drain pipe
fabrication and setting of steel bar t 90.00 1900 171000
formwork m2 800.00 21 16800
copper waterstop m 200.00 100 20000
asphalt slab
m2 50.00 45 2250
pvc drain pipe m 90.00 30 2700
2.7 riprap m3 400.00 70 28000
3 Empting tunnel
3.1 c25 r.c structure,steel bars,formwork
c25 r.c structure m3 180.00 235 42300
fabrication and setting of steel bar t 7.00 1900 13300
formwork m2 200.00 21 4200
3.2 m10 masonary work,water stop
m10 masonary work m3 230.00 150 34500
coper water stop m 20.00 100 2000
3.3 c10 n.r.c cusion m3 3.00 190 570
3.4 safety rail,steel ladder,sluice gate
saftety rail m 9.00 120 1080
steel ladder no 1.00 2000 2000
sluice gate no 1.00 140000 140000
4 Irrigation Structure
4.1 c25 r.c structure,steel bars,formwork
c25 r.c structure m3 100.00 235 23500
fabrication and setting of steel bar t 3.00 1900 5700
formwork m2 25.00 21 525
4.2 m10 masonary work,water stop
m10 masonary work m3 800.00 150 120000
coper water stop m 20.00 100 2000
4.3 c10 n.r.c cusion m3 3.00 190 570
4.4 safety rail,steel ladder,sluice gate
saftety rail m 9.00 120 1080
steel ladder no 1.00 2000 2000
sluice gate no 1.00 140000 140000
5 Temporary works
5.1 construction of access road m2 27000.00 3 81000
5.2 camp establishment and maintainence ls 1.00 96000 96000
6 Others
6.1 mobilization and demoblization ls 50000 50000
maintenance of equipment and machinares
6.2 month 8.00 7000 56000
insurance of project
6.3 ls 1.00 25000 3783840
MAIN DAM L1 L2

AREA 400 210

7 2000 420

22 198 29700 74450

4 13 99 24750

20000

15 16.15549 3000 52000

1000

480

1462.5

17160

1320

400
234

74

23.33333
l w D(DEPTHES)area/SLOPE
1.4 3.3415767542

3.1 7.5625158121
5.5 13.5421794775
5.6 13.893924399
17500 1920 1920 5.8 14.2456693205
5.9 14.5974142419
6.5 16.0043939279
6.5 16.0043939279

8080 9.6 23.56690974

288 96 400 9.9 24.270399583

9.9 24.270399583
72 9.0 22.159930054
7.6 18.6424808391
200 7.4 18.2907359176
3685.2 7.1 17.5872460746
6.6 16.1802663887
6.9 16.8837562317
4500 7.1 17.5872460746
6.6 16.1802663887

6.0 14.7732867027
4.6 11.4317099485
2.9 7.2107708906
1.5 3.6933216757
u/s d/s 703.8415879069
6.5 20.5548 26.800187 area/SLOPE
area 1233.288 1608.0112

c25 masonary retaing wall


300 toparea 240 botom protection
total area 3081.299 retain wall

thikness 0.25 770.3249 1


140.4 2
910.7249 3
spill slop 912 4

58 basin plat 216 5


sill wall 24 7
89.04354 TON total 240 260 8
1184 9
total c25 spill 1172 10
11
900 12
13
R.C NR.C R.WALL 11.7 14
51 50 24 125
5.32

M10
235.95

5 2
21
1.14
72.9

727.65

283000
MAIN EBANKMENT
SPILL WAY DIST AREA Vfill m Vcut TRENCH
0 9.572704 119.6588 10 10.1071429

25 33.51148 837.787 18 17.8214286


50 90.0625 2251.563 29 28.75 93.75
75 94.21556 2355.389 29 29.3928571 93.75
11084.5663265306 100 98.46046 2461.511 30 30.0357143 93.75
125 102.7972 2569.93 31 30.6785714 93.75
150 121.0625 3026.563 33 33.25 93.75
163 121.0625 3026.563 33 33.25 93.75

175 244.4133 6110.332 47 117.678571 93.75

200 258.0459 6451.148 48 120.892857 93.75

225 258.0459 6451.148 48 120.892857 93.75


250 218.25 5456.25 45 111.25 93.75
275 159.2704 3981.76 38 57.1071429 93.75
300 153.8776 3846.939 37 56.1428571 93.75
325 143.3673 3584.184 36 54.2142857 62.5
350 123.449 3086.224 34 50.3571429 62.5
375 133.2245 3330.612 35 52.2857143 62.5
400 143.3673 3584.184 36 54.2142857 62.5
425 123.449 3086.224 34 50.3571429 62.5

450 105 2625 31 46.5


475 67.0727 1676.818 25 24.8928571
500 31.01148 775.287 17 17.1785714
525 11.0625 12.5 11 10.75
33.8415640257 70708 1158 1437.5
15736.32727196 FILL CUT CUT/FILL

c10
375 380.12994815 2.6
crushed ston

190 950.32487036
110.94 coars sand
110.94 570.19492222
110.94

110.94
144.222
144.222
144.222
144.222
133.128
133.128
221.88
190
1888.784
1900
WEST EMBANKMENT
Vfill m Vcut TRENCH
10500 31 3100 375 DIST G.L FORMATIO

10500 3100 562.5 0 103.5 103.5


20 103 103
40 102.1 101.6
60 101 100.5
80 100.2 99.2
100 100.2 99.2
120 99.75 98.75

140 100.11 99.11

160 100.22 99.22

180 100.53 99.53


200 100.88 99.88
220 101.3 100.8
240 101.77 101.27
260 102.1 101.6
280 102.3 102.3
300 102.54 102.54
320 103.04 103.04
335 103.5 103.5

21000 1000 1000


FILL CUT CUT/FILL
A=(2L+D(S1+S2))D/2
CREST LEVDEPTHES L(TOPWIDTAREA Vfill m Vcut TRENCH

103.5 0 4 0 0 4 0
103.5 0.5 4 2.5625 51.25 6.25 0
103.5 1.9 4 15.7225 314.45 12.55 19
103.5 3 4 32.25 645 17.5 30
103.5 4.3 4 58.8025 1176.05 23.35 86
103.5 4.3 4 58.8025 1176.05 23.35 86
103.5 4.75 4 69.76563 1395.313 25.375 95

103.5 4.39 4 60.92223 1218.445 23.755 87.8

103.5 4.28 4 58.3364 1166.728 23.26 85.6

103.5 3.97 4 51.34203 1026.841 21.865 79.4


103.5 3.62 4 43.9649 879.298 20.29 72.4
103.5 2.7 4 27.2025 544.05 16.15 27
103.5 2.23 4 20.10903 402.1805 14.035 22.3
103.5 1.9 4 15.7225 314.45 12.55 19
103.5 1.2 4 8.04 160.8 9.4 0
103.5 0.96 4 5.9136 118.272 8.32 0
103.5 0.46 4 2.3161 46.322 6.07 0
103.5 0 4 0 0 4 0

10635.5 709.5
area/SLOPE

0
30.7776806306
116.9551863963
184.6660837837
264.6880534233
264.6880534233
292.3879659908

270.2280359368

263.456946198

244.3747842071
222.8304077656
166.1994754053
137.2684556125
116.9551863963
73.8664335135
59.0931468108
28.3154661802
0

2736.7513616741
5480 M2

20200

You might also like