PAINTING OF STEEL PARTS

PAINTING COST
REQUIRED MIDCOAT
TOTAL SURFACE
SN HEMPADUR MASTIC
AREA (sqm) THINNER (L) COST
45881 (L)

1 102 21
610.00
2 16 11

3 REQUIRED TOPCOAT (2X)


TOTAL SURFACE
AREA (sqm) HEMPATHANE
4 THINNER (L) COST
TOPCOAT 55210 (L)

5 136.00 29
610.00
6 32.00 10

8 Allow. For Accessories

9 TOTAL COST

10 PROFIT 20%

11 TOTAL COST OF PAINT

LABOR COST
SN DESCRIPITION QUANTITY UNIT RATE
1 PAINTER 1 no. 85
2 HELPER 1 no. 50
3 FORKLIFT OP. 1 no. 85
4 DRIVER 1 no. 60
5 SITE SUPERVISOR 1 no. 200
6 SITE ENGINEER 1 no. 335
7 TOTAL
8 50% PROFIT
9 TOTAL LABOR COST
RTS

REMARKS
TOTAL COST

QR 2,142.00

QR 176.00

X)

TOTAL COST

QR 3,944.00

QR 320.00

QR 6,582.00

QR 1,645.50

QR 8,227.50

QR 1,645.50

QR 9,873.00

DAYS (8 hr./day) TOTAL


34 QR 2,890.00
34 QR 1,700.00
34 QR 2,890.00
34 QR 2,040.00
34 QR 6,800.00
34 QR 11,390.00
TOTAL QR 27,710.00
50% PROFIT QR 13,855.00
TOTAL LABOR COST QR 41,565.00

GRAND TOTAL QR 51,438.00