PAINTING COST
REQUIRED MIDCOAT
TOTAL SURFACE
SN HEMPADUR MASTIC
AREA (sqm) THINNER (L) COST
45881 (L)
1 102 21
610.00
2 16 11
5 136.00 29
610.00
6 32.00 10
9 TOTAL COST
10 PROFIT 20%
LABOR COST
SN DESCRIPITION QUANTITY UNIT RATE
1 PAINTER 1 no. 85
2 HELPER 1 no. 50
3 FORKLIFT OP. 1 no. 85
4 DRIVER 1 no. 60
5 SITE SUPERVISOR 1 no. 200
6 SITE ENGINEER 1 no. 335
7 TOTAL
8 50% PROFIT
9 TOTAL LABOR COST
RTS
REMARKS
TOTAL COST
QR 2,142.00
QR 176.00
X)
TOTAL COST
QR 3,944.00
QR 320.00
QR 6,582.00
QR 1,645.50
QR 8,227.50
QR 1,645.50
QR 9,873.00