TASK DESCRIPTION Hoist operational SUBCONTRACTOR Dodsal Engg. & Const. Pte Ltd.
TRA TEAM MEMBERS Mr.Suresh Simham(Sr.Engr-Struct.),Mr. Bassem kini (Opration Manager-NFT),Mr. Rajesh (Sr.HSE Officer) Page 1 of 5 DATE: 04.08.2012
Site SAMSUNG
Damage of sign 3 2 6 1 1 1
Supervisor
Personnel displayed
SWL not mentioned
& Assets Unique identifier
Third party Drop test must be carried out
inspection(Drop after new installation & every six
Test) not carried out month hoist must be undergone
drop test.
5578-E3-REP-HSE-020 Page 1 of 5
DODSAL ENGINEERING & CONSTRUCTION PTE LTD
5578-E3-REP-HSE-020 Page 2 of 5
DODSAL ENGINEERING & CONSTRUCTION PTE LTD
06 Hoist operation Unauthorized/Untrai Personnel The operator must be trained so Close supervision
ned personnel & Assets that he is familiar with the 3 3 9 The stuffs must 1 1 1
operate the hoist operation of the hoist and be placed steadily
function of all parts. in the cage for
Wind speed
Never operate the hoist the sake of
Person with vertigo when wind speed at the top of the guarantee all the
Electrocution hoist exceeding 20m/s and the things not incline
Abnormal sound foul weather condition. and overturn.
No obstacles in the hoist or Proper "PPE"
Over speed counterweight way. (Double lanyard
Overload No accumulated water in the full body
Horse playing foundation. harness).
Make sure that the load is less
Smoking inside the
than payload. Don’t allow travel
cage
Not open door and let hand or person with
Non adhering to PPE something out of cage vertigo.
Non adhering to The passenger and stuffs can not
100% tie-off lean close to the any doors.
Close the doors.(incl. The cage
gates, the enclosure gate, the
trap door). Make sure the door
Site Engineer
can locked reliably.
Be away to everyone while start.
With counterweight hoist must be
observed frequently to see the
counter roller whether out off the
counterweight rail.
Must check the cable whether be
divorced from cable guide in
every working day.
Stop the cage at the ground
landing, lock the 3-phese switch
and cut of the power when work
is finished for the day.
Make sure that the inspection,
maintenance and drop test must
be done periodically.
Turn the switch to “ON” and lock
it. No one can cut off easily when
it turn on. You can turn the switch
to “OFF” exertly in the urgency,
but you must replace the switch
after it. When you turn the witch
to “OFF” and lock it , no one can
turn on easily.
5578-E3-REP-HSE-020 Page 4 of 5
DODSAL ENGINEERING & CONSTRUCTION PTE LTD
07 Emergency Untrained personnel Working Adequate training shall be given Close supervision
situation personnel to the working personnel to tackle 3 2 6 1 1 1
Panic
emergency situation while riding
Functioning of trap on elevated hoist.
door Emergency contact number shall
Emergency number be displayed inside the cage.
not displayed If abnormal phenomena take
Poor communication place, press the emergency stop
button and depress it until the
tubules are solved.
Pull the control box through the
trap door when working at the
roof of the cage.
If the hoist stops abnormally,
drive it down to the ground
landing by hand. Lift the brake
lifter on the motor to allow the
cage to slide down slowly.
Remarks:
Prepared By : Name: Mr. Rajesh Somappa, Reviewed by: Name: Arup Roy Chowdhury Approved By; Name:
Designation: HSE Officer Designation: HSE Manager ,Dodsal Designation: HSE Manager,SECL
Sign: Sign: Sign:
Date: 04.08.2012 Date: Date:
S: Severity, P: Probability, R: Risk
Severity
4 – Catastrophic – Imminent danger exists, hazard capable of causing death or illness at wide scale
3 – Critical – Hazard can result in serious illness, severe injury, property and equipment damage
2 – Marginal – Hazard can cause illness, injury or equipment damage but the damage is not expected to be serious
1 – Negligible – Hazard will not result in serious injury or illness, remote possibility of damage beyond minor first-aid case.
5578-E3-REP-HSE-020 Page 5 of 5