DAFTAR SEWA P E R A L A T AN

:
D A E R A H : PALEMBANG
-

HARGA
NO. PERALATAN SATUAN KET.
(Rp)
1 Dump Truck 3 ton Jam 420,000
2 Dump Truck 5 ton Jam 420,000
3 Truk Bak Terbuka Jam 375,000
4 Truk Tanki Air Jam 375,000
5 Bulldozer Jam 181,000
6 Motor Grader Jam 251,000
7 Wheel Loader Jam 280,000
8 Excavator Jam 660,000
9 Crane Jam 430,000
10 Trailler Jam 522,874
11 Mesin Gilas Tandem 6 - 10 ton Jam 318,387
12 Mesin Gilas 3 roda 6 - 10 ton Jam 150,000
13 Mesin Gilas Roda Karet 8 - 10 ton Jam 180,000
14 Vibratory Roller Jam 50,000
15 Vibro roller 1 ton Jam 50,000
16 Water Pump Jam 50,000
17 Asphalt Sprayer Jam 107,686
18 Pick Up Jam 50,000
19 AMP Jam 4,000,000
20 Asphalt Finisher Jam 550,000
21 Concrete Vibrator Jam 40,000
22 Compressor Jam 200,879
23 Concrete Mixer Jam 108,783
24 Stamper Jam 40,000
25 Genset Jam 160,000
26 Alat Pengecat Marka Jam 80,000
27 Molen hr 120,000
DAFTAR UPAH PEKERJA

:
D A E R A H : PALEMBANG
-

HARGA
NO. JENIS BAHAN SATUAN KET.
(Rp)
1 Pekerja Hr 95,000
2 Mandor Hr 150,000
3 Tukang listrik Hr 110,000
4 Tukang kayu Hr 110,000
5 Kep. tk. kayu Hr 125,000
6 Tukang batu Hr 110,000
7 Kep. tk. batu Hr 125,000
8 Tukang besi Hr 110,000
9 Kep. tk. besi Hr 125,000
10 T u k a n g c a t Hr 100,000
11 K e p . t k . c a t Hr 125,000
12 T u k a n g p l i t u r Hr 110,000
13 T u k a n g j a l a n Hr 110,000
14 T u k a n g g a l i Hr 110,000
15 Tukang masak aspal Hr 110,000
16 T k . l e i d e n g Hr 110,000
17 M a s i n i s Hr 90,000
18 P e m b . M a s i n i s Hr 45,000
19 P e n j a g a a p i Hr 45,000
20 P e n j a g a m a l a m Hr 50,000
21 Sopir Hr 115,500
22 Pembantu Sopir Hr 95,000

375635176.xls 116 daftar upah tenaga kerja


Lampiran I Peraturan Bupati Wonogiri
Nomor :
Tanggal :

DAFTAR HARGA SATUAN BAHAN DAN UPAH TENAGA KERJA

KABUPATEN : WONOGIRI
TAHUN : 2016

HARGA
PAJAK
DASAR
MBLB
WILAYAH I WILAYAH II WILAYAH III WILAYAH IV
NO JENIS MATERIAL/TENAGA URAIAN SAT MBLB KETERANGAN

Rp. Rp. Rp. Rp. Rp. Rp.


1 2 3 4 5 6 8 7 8 9 10
I BATA, BATU DAN PASIR
1 Bata Merah Lokal bh 700 700 725 800 - WILAYAH I
2 Bata Merah Panggisari bh 725 750 775 875 1. WONOGIRI
3 Batu Blonos m3 75,000 18,750 143,750 143,750 143,750 148,750
4 Batu Belah Manual 15/20 Batu belah pondasi m3 100,000 25,000 180,300 185,000 185,000 185,000
5 Batu Belah Manual 10/15 Batu belah pondasi m3 100,000 25,000 195,000 195,000 195,000 195,000
6 Batu Split Pecah Manual 7/10 m3 100,000 25,000 130,000 145,000 165,000 205,000
7 Batu Split Pecah Manual 1/2 m3 130,000 32,500 197,500 207,500 227,500 252,500
8 Batu Split Pecah Manual 2/3 m3 125,000 31,250 181,250 196,250 221,250 231,250 - WILAYAH II
9 Batu Split Pecah Manual 3/5 m3 100,000 25,000 155,000 165,000 185,000 215,000 1. JATISRONO
10 Batu Split Pecah Manual 5/7 m3 100,000 25,000 130,000 135,000 150,000 210,000
11 Batu Split Pecah Mesin 1/2 m3 130,000 32,500 212,500 222,500 232,500 407,500
12 Batu Split Pecah Mesin 2/3 m3 125,000 31,250 191,250 216,250 231,250 399,250
13 Batu Split Pecah Mesin 3/5 m3 100,000 25,000 150,000 180,000 230,000 360,000
14 Batu Split Pecah Mesin 5/7 m3 100,000 25,000 145,000 175,000 225,000 350,000
15 Batu Split Pecah Mesin 1/1 m3 125,000 31,250 211,250 221,250 231,250 405,250 - WILAYAH III
16 Batu Split Pecah Mesin 0.5/1 m3 125,000 31,250 211,250 221,250 231,250 411,250 1. PURWANTORO
17 Batu Kerikil m3 50,000 12,500 87,500 92,500 102,500 132,500
18 Sirtu m3 75,000 18,750 113,750 118,750 138,750 158,750
19 Pasir Beton / Pasang m3 80,000 20,000 120,000 135,000 140,000 220,000
20 Pasir Urug m3 50,000 12,500 97,500 92,500 102,500 137,500
21 Tanah Urug m3 25,000 6,250 81,250 81,250 81,250 111,250
22 Abu Batu Mesin m3 125,000 31,250 181,250 191,250 196,250 381,250
23 Kapur Pasang m3 120,000 130,000 135,000 215,000
24 Brangkal kg 11,000 11,500 11,500 12,000 - WILAYAH IV
1. WURYANTORO
II BAHAN PEREKAT
1 Semen PC kg 1,500 1,550 1,600 1,700
2 Semen Warna kg 11,500 11,550 12,000 13,500
3 Semen Putih kg 3,600 3,650 3,700 4,000

III BAHAN BAJA :


1 Besi Beton Kg 13,000 13,500 13,750 14,000
HARGA
PAJAK
DASAR
MBLB
WILAYAH I WILAYAH II WILAYAH III WILAYAH IV
NO JENIS MATERIAL/TENAGA URAIAN SAT MBLB KETERANGAN

Rp. Rp. Rp. Rp. Rp. Rp.


1 2 3 4 5 6 8 7 8 9 10
2 Besi Beton U-39 kg 13,000 13,500 13,750 14,000
3 Besi Beton Ulir kg 15,750 16,000 16,500 17,500
4 Baja Profil kg 18,500 18,750 19,000 20,000
5 Besi Siku Kg 18,500 18,750 19,000 20,000 - Harga belum termasuk PPN
6 Besi Plat Kg 18,500 18,750 19,000 20,000
7 Baja Strip (0,2 x 2) cm kg 18,000 18,500 19,000 20,000 - Untuk material yang belum
8 Plat Strip Kg 16,000 16,250 16,750 18,000 tercantum dalam daftar ini,
9 Mur/baud biasa 4 s/d 6 cm Bh 3,000 3,200 3,250 3,500 maka harga material
tersebut menggunakan
10 Besi Hollow 40.40.4 mm btg 100,000 105,000 110,000 120,000
harga pasar setempat
11 Besi Hollow 80.80.4 mm btg 160,000 170,000 170,000 180,000
12 Besi Tempa m2 300,000 305,000 315,000 335,000
13 Rangka Atap Baja Ringan Bentang 1 s/d 5 m m2 165,000 170,000 175,000 185,000
14 Rangka Atap Baja Ringan Bentang 5 s/d 10 m m2 175,000 180,000 185,000 195,000
15 Rangka Atap Baja Ringan Bentang 10 s/d 15 m m2 185,000 190,000 195,000 200,000 - Harga belum termasuk
16 Pintu Bendung b=1,0 ,h=1,0 ,H=3,0 Plat Daun 10 mm Set 16,427,950 16,427,950 16,427,950 16,427,950 langsiran
17 Pintu Bendung b=1,2 ,h=1,0 , H=3,0 Plat Daun 10 mm Set 17,601,650 17,601,650 17,601,650 17,601,650
18 Pintu Jaringan b=0,3 ,h=0,5 , H=2,0 Plat Daun 8 mm Set 5,866,850 5,866,850 5,866,850 5,866,850 - Harga Batu dan Pasir sudah
19 Pintu Jaringan b=0,4 ,h=0,6 , H=2,0 Plat Daun 8 mm Set 7,040,550 7,040,550 7,040,550 7,040,550 termasuk Pajak MBLB
20 Pintu Jaringan b=0,5 ,h=0,7 , H=2,0 Plat Daun 8 mm Set 8,213,700 8,213,700 8,213,700 8,213,700
21 Pintu Jaringan b=0,6 ,h=0,7 , H=2,0 Plat Daun 8 mm Set 8,800,550 8,800,550 8,800,550 8,800,550
22 Pintu Jaringan b=0,7 ,h=0,8 , H=2,0 Plat Daun 8 mm Set 9,387,400 9,387,400 9,387,400 9,387,400 - Harga Belum Termasuk
23 Pintu Jaringan b=0,8 ,h=0,8 , H=2,0 Plat Daun 8 mm Set 11,734,250 11,734,250 11,734,250 11,734,250 Overhead dan profit
24 Pintu Jaringan b=0,9 ,h=0,9 , H=2,0 Plat Daun 8 mm Set 12,907,950 12,907,950 12,907,950 12,907,950

IV BAHAN KAYU
1 Kayu Terentang Kayu Klas IV
Kaso Terentang Basah m3 3,000,000 3,100,000 3,200,000 3,500,000
Balok Terentang Basah m3 3,200,000 3,300,000 3,500,000 3,700,000
Papan Terentang Basah m3 3,500,000 3,600,000 3,700,000 4,000,000
2 Kayu Meranti Kayu Klas III; Basah
Kaso Meranti uk. 5/7 & 5/10 p = 3,80 m' m3 5,500,000 5,550,000 5,600,000 5,800,000
Balok Meranti m3 6,413,000 5,700,000 5,750,000 5,950,000
Papan Meranti uk. 3/20 & 3/30 p = 3,80 m' m3 6,200,000 6,250,000 6,300,000 6,500,000
3 Kayu Kruing Kayu Klas III; Basah
Kaso Kruing uk. 5/7 & 5/10 p = 3,80 m' m3 6,400,000 6,450,000 6,475,000 6,500,000
Balok uk. 6/12, 6/15, 8/12 & 8/15 p = 3,8 m' m3 7,502,000 6,750,000 6,775,000 6,800,000
Papan Kruing uk. 3/20 & 3/30 p = 3,80 m' m3 7,986,000 6,750,000 6,800,000 7,000,000
4 Kayu Kamper Kayu Klas II
Kaso Kamper Basah m3 9,400,000 9,450,000 9,500,000 9,800,000
Balok Kamper Basah m3 10,890,000 10,200,000 10,300,000 10,400,000
Papan Kamper Basah m3 12,100,000 13,100,000 13,200,000 13,400,000
HARGA
PAJAK
DASAR
MBLB
WILAYAH I WILAYAH II WILAYAH III WILAYAH IV
NO JENIS MATERIAL/TENAGA URAIAN SAT MBLB KETERANGAN

Rp. Rp. Rp. Rp. Rp. Rp.


1 2 3 4 5 6 8 7 8 9 10
5 Kayu Bangkirai Kayu Klas II
Kaso Bangkirai oven m3 9,750,000 9,800,000 9,850,000 10,000,000
Balok Bangkirai oven m3 13,431,000 9,900,000 10,000,000 10,500,000
Papan Bangkirai oven m3 13,800,000 13,850,000 13,900,000 14,000,000
6 Kayu Jati Kayu Klas I
Kaso Jati oven m3 22,900,000 22,950,000 23,000,000 23,100,000
Balok Jati oven m3 22,506,000 21,600,000 21,800,000 21,900,000
Papan Jati oven m3 25,773,000 30,600,000 30,700,000 30,800,000
7 Bambu btg 18,000 17,750 17,750 17,750
8 Kayu Reng 3/4 Kruing btg 4,500 4,500 4,500 5,000
9 Kayu Bakar m3 120,000 120,000 110,000 110,000
10 Kayu Tahun m3 2,700,000 2,700,000 2,600,000 2,600,000

V BAHAN ALMUNIUM DAN PENGUNCI :


1 Kusen Alm. 3" CA Alexindo m 82,000 82,500 83,000 84,000
2 Kusen Alm. 3" PC Alexindo m 105,000 107,500 108,000 111,000
3 Rangka Jendela Alm. CA Alexindo m 115,000 117,000 119,000 124,000
4 Rangka Jendela Alm. PC Alexindo m 140,000 142,500 145,000 150,000
5 Rangka Pintu Alm. CA Alexindo m 200,000 202,500 205,000 209,000
6 Rangka Pintu Alm. PC Alexindo m 215,000 217,500 219,000 222,000
7 Kusen & Pintu PVC toilet Maspion unit 260,000 264,000 265,000 270,000
8 Engsel 3" ex Bos bh 14,500 14,650 14,750 15,000
9 Engsel 4" ex Bos bh 27,000 27,500 27,750 28,000
10 Engsel 4" Besi bh 33,500 33,750 34,000 35,000
11 Rel Pintu Lipat 4 Pintu Zinkalume Lokal ex DeKson unit 3,500,000 3,550,000 3,600,000 3,720,000
12 Handle Pintu ex Solid bh 200,000 202,000 205,000 210,000
13 Handle Pintu termasuk Kunci ex Solid set 405,000 410,000 415,000 430,000
14 Pull Handle Pintu ex Solid bh 185,000 190,000 195,000 205,000
15 Ring Kunci ex Solid bh 45,000 46,000 47,000 48,000
16 Handle pintu type HRE 75.01 ex CISA bh 315,000 320,000 325,000 340,000
17 Selinder CISA type 08510 ex CISA bh 305,000 310,000 315,000 327,000
18 Door Stoper bh 30,000 30,500 31,000 32,000
19 Door closer bh 30,000 30,500 31,000 32,000
20 Expanolet bh 139,000 140,000 142,500 154,000
21 Kait Angin bh 18,500 19,000 19,250 20,000
22 Engsel Pintu Biasa bh 18,500 19,000 19,250 20,000
23 Engsel Jendela Biasa bh 12,000 12,250 12,500 13,000
24 Grendel Pintu bh 9,000 9,150 9,250 9,500
25 Grendel Jendela bh 6,700 6,900 7,000 7,500
26 Handel knob + Kunci ex Alpha bh 117,500 119,500 120,000 125,000
27 Pull Handle Pintu set 430,000 445,000 450,000 460,000
28 Slot 2x putar bh 100,000 102,500 105,000 110,000
HARGA
PAJAK
DASAR
MBLB
WILAYAH I WILAYAH II WILAYAH III WILAYAH IV
NO JENIS MATERIAL/TENAGA URAIAN SAT MBLB KETERANGAN

Rp. Rp. Rp. Rp. Rp. Rp.


1 2 3 4 5 6 8 7 8 9 10
29 Karet lis Kaca m 26,000 26,500 27,000 28,000
30 Kunci Tanam Antik bh 500,000 510,000 525,000 540,000

VI BAHAN PELAPIS :
1 Triplex t. 3 mm Uk 120x240 cm lbr 53,000 53,500 54,000 55,000
2 Triplex t. 4 mm Uk 120x240 cm lbr 62,000 54,000 65,000 70,000
3 Triplex t. 6 mm lbr 70,000 72,000 73,000 75,000
4 Triplex t. 9 mm lbr 110,000 115,000 117,500 125,000
5 Triplex t. 12 mm lbr 160,000 162,500 165,000 170,000
6 Teakwood t. 3 mm Uk 90x120 cm lbr 87,500 89,000 90,000 95,000
7 Multiplex t. 6 mm lbr 87,500 89,000 90,000 95,000
8 Multiplex t. 12 mm lbr 215,000 220,000 225,000 230,000
9 Multiplex t. 18 mm lbr 295,000 300,000 305,000 311,000
10 Multiplex t. 9 mm Uk 120x240 cm lbr 125,000 126,000 127,500 130,000
11 MDF 18 lbr 240,000 242,500 245,000 255,000
12 Teakblock t. 18 mm Uk 120x240 cm lbr 335,000 337,500 340,000 350,000

VII BAHAN LANTAI & DINDING KERAMIK


1 Keramik 20/20 cm KW1 ex Masterina m2 55,000 56,000 67,000 60,000
2 Keramik 20/20 cm KW2 ex Masterina m2 52,000 53,000 54,000 55,000
3 Keramik 30/30 cm KW1 ex Masterina m2 50,000 51,000 52,000 53,000
4 Keramik 30/30 cm KW2 ex Masterina m2 46,500 47,000 48,000 50,000
5 Keramik 40/40 cm KW1 ex Masterina m2 62,000 62,500 63,000 65,000
6 Keramik 40/40 cm KW2 ex Masterina m2 58,000 59,000 60,000 63,000
7 Keramik 60/60 cm KW1 ex Masterina m2 78,000 79,000 80,000 85,000
8 Keramik Dinding 20/20 cm KW 1 ex Masterina m2 85,000 86,000 87,500 90,000
9 Keramik Dinding 20/20 cm KW 2 ex Masterina m2 58,000 58,500 59,000 62,000
10 Keramik Dinding 20/25 cm KW 1 ex Masterina m2 87,000 88,000 89,000 92,000
11 Keramik Dinding 20/25 cm KW 2 ex Masterina m2 58,000 58,500 59,000 62,000
12 Ubin abu-abu 30x30 bh 5,500 5,600 5,750 6,000
13 Ubin abu-abu 20x20 bh 2,000 2,200 2,250 2,500
14 Granite Tile 40/40 cm Polish ex Granito Tile m2 175,000 176,000 177,500 180,000
15 Granite Tile 60/60 cm Polish ex Granito Tile m2 195,000 200,000 205,000 215,000
16 Batu tempel m2 110,000 112,500 115,000 120,000
17 Batu Candi Muntilan m2 140,000 142,500 145,000 150,000
18 Batu Muka Warna m2 80,000 81,000 82,500 85,000
19 Batu Muka un. Leuning Jembatan m2 80,000 81,000 82,500 85,000
20 Batu Muka Candi 20 x 30 Kalibanteng m2 237,500 238,000 240,000 245,000
21 Paving Blok Tidak Berwarna Lokal t. 6 cm m2 50,000 51,500 52,500 55,000
HARGA
PAJAK
DASAR
MBLB
WILAYAH I WILAYAH II WILAYAH III WILAYAH IV
NO JENIS MATERIAL/TENAGA URAIAN SAT MBLB KETERANGAN

Rp. Rp. Rp. Rp. Rp. Rp.


1 2 3 4 5 6 8 7 8 9 10
22 Paving Blok Tidak Berwarna Magelang t. 6 cm K175 m2 115,000 117,500 120,000 125,000
23 Paving Blok Berwarna Magelang t. 6 cm K175 m2 130,000 132,500 135,000 140,000
24 Plint Keramik 8/30 cm ex Roman bh 12,000 12,500 13,000 15,000
25 Plint Granitetile 10/40 cm ex Granito Tile bh 25,000 25,500 26,000 28,000
26 Ornamen Profil (cetak) p = 0.5 m bh 27,500 29,000 30,000 31,000
27 Roster Beton Uk. 15/30 cm bh 13,500 14,000 14,500 15,000
28 Roster Beton Uk. 20/20 cm bh 13,500 14,000 14,500 15,000
29 Roster Kerawang bh 7,000 7,250 7,500 8,000
30 Glass Block 20/20 bh 25,000 25,500 26,000 28,000
31 Paving Blok Scuer 24 X 24 merah t. 6 cm m2 134,200 134,200 134,200 145,000
32 Paving Blok Scuer 24 X 24 merah t. 8 cm m2 217,550 217,550 217,550 225,000
33 Paving difabel 30 x 30 6 cm bh 52,350 52,350 52,350 54,000
34 Kanstin 10 K300 m' 112,350 112,350 112,350 115,000

VIII BAHAN PERLINDUNG


1 Waterproofing Coating ex Sika Ltr 65,000 65,500 66,000 67,000

IX BAHAN PENUTUP ATAP


1 Genteng Keramik 25 bh/m2 ex Jatiwangi bh 9,000 9,250 9,500 10,000
2 Genteng Keramik Glazur 15 bh/m2 ex KANMURI bh 9,500 9,750 10,000 10,500
3 Genteng Pres Kebumen bh 2,900 3,000 3,100 3,200
4 Genteng Pres Lokal bh 2,100 2,150 2,200 2,300
5 Genteng Kodok Kebumen bh 4,150 4,200 4,250 4,300
6 Genteng Beton bh 6,500 6,600 6,750 7,000
7 Nok Genteng Keramik 4 bh/m ex Jatiwangi bh 12,500 12,650 12,750 13,000
8 Nok Genteng Keramik Glasur 4 bh/m ex KANMURI bh 12,500 12,650 12,750 13,000
9 Nok Genteng Pres Kebumen bh 4,500 4,650 4,700 5,000
10 Nok Genteng Pres Lokal bh 4,400 4,500 4,600 4,800
11 Nok Genteng Kodok Kebumen bh 4,400 4,500 4,600 4,800
12 Nok Genteng Beton bh 7,500 7,650 7,750 8,000
13 Seng Plat BJLS 30 L. 90 cm m' 50,000 50,500 51,000 52,000
14 Seng Gelombang BJLS 30 Uk. 80 x 180 cm lbr 65,000 65,000 67,500 70,000
15 Asbes gel.besar uk. 180x102x5 mm Djabes lbr 50,500 51,000 52,000 53,000
16 Asbes gel.kecil uk. 180x105x4 mm Djabes lbr 29,000 30,000 31,000 32,000
17 Nok gel besar l.102 cm Djabesnok pcs 25,000 26,500 27,500 30,000
18 Nok gel kecil l.102 cm Djabesnok pcs 17,500 18,000 18,500 20,000
HARGA
PAJAK
DASAR
MBLB
WILAYAH I WILAYAH II WILAYAH III WILAYAH IV
NO JENIS MATERIAL/TENAGA URAIAN SAT MBLB KETERANGAN

Rp. Rp. Rp. Rp. Rp. Rp.


1 2 3 4 5 6 8 7 8 9 10
X KAWAT / MESH
1 Kawat Beton Bendrat kg 18,000 18,000 18,500 19,000
2 Galvanized Lbr 13,750 14,000 14,500 15,500
3 Ram Kawat Nyamuk/Kasa Logam m2 20,000 20,500 21,000 22,000
4 Kawat GI-4 mm kg 20,000 20,500 21,000 22,000
5 Kawat Harmonika m2 19,000 19,500 20,000 21,000
6 Kawat Bronjong Ø 4 mm kg 20,000 20,500 21,000 22,000
7 Bronjong 2 x 1 x 0,5 m3, dia 2,7 mm Lobang 8x10cm bh 285,000 287,500 290,000 300,000
8 Bronjong 2 x 1 x 0,5 m3, dia 3,0 mm Lobang 8x10cm bh 335,000 340,000 345,000 360,000

XI BAHAN KACA :
1 Kaca Bening 5 mm m2 100,000 105,000 110,000 120,000
2 Kaca Bening 3 mm m2 80,000 85,000 90,000 95,000
3 Kaca Reybend 5 mm m2 115,000 120,000 130,000 145,000
4 Kaca Reybend 3 mm m2 90,000 95,000 100,000 110,000
5 Kaca Buram 5 mm m2 120,000 125,000 135,000 150,000
6 Kaca Buram 3 mm m2 95,000 100,000 105,000 115,000

XII BAHAN PAKU DAN MUR BAUT :


1 Paku 1 s/d 3 cm kg 18,000 18,500 19,000 20,000
2 Paku 4 s/d 7 cm kg 14,000 14,250 14,500 15,000
3 Paku 8 s/d 12 cm kg 14,000 14,250 14,500 15,000
4 Paku Skrup kg 12,500 12,750 13,000 13,500
5 Paku Asbes/seng kg 25,000 25,500 26,000 27,500
6 Paku ripet bh 1,300 1,350 1,400 1,500
7 Skrup fixer bh 1,300 1,350 1,400 1,500
8 Paku payung Paku asbes kg 24,500 25,000 26,000 27,500
9 Paku Kait bh 1,275 1,300 1,350 1,400
10 Besi Begel Kuda-kuda kg 19,500 20,000 20,500 21,000

XIII BAHAN FINISHING :


A. Cat Besi dan Kayu :
1 Dempul Besi/Kayu Kg 40,000 42,500 45,000 50,000
2 Cat Kayu/Besi Glotex Kg 50,000 50,500 51,000 52,000
3 Cat kayu/Besi ex SEIV Kg 50,000 50,500 51,000 52,000
4 Cat kayu/Besi ex DULUX ICI Kg 50,000 50,500 51,000 52,000
5 Plamir Kayu Kg 25,000 26,000 27,000 30,000
6 Meni kayu ex Nippon kg 22,000 23,000 24,000 26,000
7 Wood Filler Impra Kg 34,000 35,000 36,000 37,500
8 Sending sealer Impra Kg 51,000 52,000 53,000 55,000
9 Wood stain Impra Kg 53,000 54,000 55,000 57,000
HARGA
PAJAK
DASAR
MBLB
WILAYAH I WILAYAH II WILAYAH III WILAYAH IV
NO JENIS MATERIAL/TENAGA URAIAN SAT MBLB KETERANGAN

Rp. Rp. Rp. Rp. Rp. Rp.


1 2 3 4 5 6 8 7 8 9 10
10 Clear Melamic Impra Kg 51,000 52,000 53,000 55,000
11 Thinner ND IMPALA Ltr 21,000 22,000 23,000 25,000
12 Amplas Kayu Lbr 3,050 3,150 3,200 3,500
13 Kwas cat bh 8,000 8,500 9,000 10,000

B. Cat Tembok
1 Cat Dasar Emulsion Warna Putih ex AVIAN Kg 62,500 63,000 64,000 65,000
2 Cat Akhir Emulsion Warna Standard ex AVIAN Kg 65,000 62,500 65,000 70,000
3 Cat WheatherCoat Warna Standard ex AVIAN Kg 74,000 75,000 77,000 79,000
4 Cat Dasar Emulsion ex AVIAN Kg 95,000 97,500 100,000 105,000
5 Cat Akhir Emulsion ex AVIAN Kg 100,000 102,500 105,000 110,000
6 Cat WheatherCoat ex AVIAN Kg 88,000 89,000 90,000 92,000
7 Plamir Tembok Kg 26,000 26,500 27,000 28,000

C. Bahan Pembantu
1 Lem Kayu kg 11,000 11,250 11,500 12,000
2 Seal tape bh 4,750 4,850 4,900 5,000
3 Kawat las listrik dus 100,000 100,000 100,000 100,000
4 Sealant clear neutral (300 ml) tb 35,000 35,500 36,000 37,000
5 Minyak bekisting Ltr 14,000 14,250 14,500 16,000
6 Pasangan ijuk kg 13,500 14,000 14,500 15,000
7 Teer Ltr 16,000 16,500 17,000 18,500
8 Lem/Sarplass PVC bh 7,000 7,250 7,500 8,500
9 Alat Bantu set 55,000 56,000 57,000 60,000
10 Pertamax Ltr 11,000 11,000 11,000 12,000
11 Minyak Tanah/Bakar Ltr 14,500 14,700 14,850 15,000
12 Solar Industri Ltr 13,000 13,000 13,000 13,100
13 Oli Ltr 25,000 26,500 27,500 29,000
14 Stenvet kg 35,000 36,500 38,000 40,000

XIV BAHAN SANITARI


1 Wastafel LW 240 CJ Komplit Kran & acc ex Toto unit 510,000 515,000 520,000 525,000
2 Kloset duduk CW 600 J/SW 660 J Komplit & acc ex Toto unit 1,710,000 1,720,000 1,740,000 1,750,000
3 Kloset Jongkok type CE 6 ex Toto unit 380,000 385,000 387,000 390,000
4 Urinoir type U 57 M ex Toto unit 1,710,000 1,712,000 1,712,500 1,715,000
5 Bak air fibreglass uk. 55x55x60 cm bh 225,000 230,000 230,500 240,000
6 Shower Spray type THX 20 NBPIV ex Toto unit 700,000 705,000 707,500 715,000
7 Shower Set type TX 423 SZ ex Toto unit 350,000 355,000 360,000 365,000
8 Floordrain type TX 1B ex Toto bh 210,000 215,000 217,500 225,000
9 Tempat Sabun S 11 N bh 26,000 27,000 27,500 30,000
HARGA
PAJAK
DASAR
MBLB
WILAYAH I WILAYAH II WILAYAH III WILAYAH IV
NO JENIS MATERIAL/TENAGA URAIAN SAT MBLB KETERANGAN

Rp. Rp. Rp. Rp. Rp. Rp.


1 2 3 4 5 6 8 7 8 9 10
10 Kran Ledeng ex Onda bh 25,000 27,500 28,500 30,000
11 Kran zink type T 30 AR13NV7N ex Toto bh 115,000 117,500 120,000 122,000
12 Kitchenzink stainless steel 1 lubang Hwaco 1L unit 250,000 255,000 260,000 275,000
13 Kran dinding type T 23 B13V7N ex Toto bh 145,000 147,500 150,000 155,000
14 Kaca Cermin m2 80,000 82,500 85,000 87,000

XV BAHAN PARTISI DINDING /PLAFOND


1 Gypsumboard t.9 mm ex Jayaboard uk 120 x 240 cm lbr 71,000 72,000 73,000 75,000
2 Calsyboard uk 120 x 240 cm lbr 58,000 59,000 60,000 63,000
3 List Profil 5 cm Gypsum m' 12,500 13,000 13,250 14,000
4 List Kayu Profil m' 8,000 8,500 9,000 10,000
5 Eternit Polos uk 100 x 100 cm lbr 9,000 9,500 10,000 10,500
6 Eternit Asbes uk 100 x 100 cm pak 80,000 82,500 83,000 85,000
7 Acrylic tb. 9 mm m2 875,000 880,000 890,000 900,000

XVI BAHAN SALURAN AIR


1 Pipa PVC S 8 dia. 1/2" 12.5 BAR (SC) ex Wavin P. 4 m m 4,625 4,750 4,875 5,000
2 Pipa PVC S 8 dia. 3/4" 12.5 BAR (SC) ex Wavin P. 4 m m 6,750 6,875 7,000 7,250
3 Pipa PVC S 8 dia. 1" 12.5 BAR (SC) ex Wavin P. 4 m m 9,875 10,000 10,250 11,000
4 Pipa PVC S 8 dia. 1 1/4" 12.5 BAR (SC) ex Wavin P. 4 m m 15,500 15,750 16,000 16,750
5 Pipa PVC S 10 dia. 1/2" 10 BAR (SC) ex Wavin P. 4 m m 3,750 3,850 4,000 4,200
6 Pipa PVC S 10 dia. 3/4" 10 BAR (SC) ex Wavin P. 4 m m 5,250 5,500 5,750 6,000
7 Pipa PVC S 10 dia. 1" 10 BAR (SC) ex Wavin P. 4 m m 8,600 8,800 9,000 9,250
8 Pipa PVC S 10 dia. 1 1/4" 10 BAR (SC) ex Wavin P. 4 m m 12,750 13,000 13,250 14,000
9 Pipa PVC S 10 dia. 1 1/2" 10 BAR (SC) ex Wavin P. 4 m m 19,750 20,000 20,250 21,000
10 Pipa PVC S 10 dia. 2" 12.5 BAR (SC) ex Wavin P. 6 m m 31,000 31,250 31,750 32,500
11 Pipa PVC S 10 dia. 3" 12.5 BAR (SC) ex Wavin P. 6 m m 63,000 63,250 63,750 64,500
12 Pipa PVC S 10 dia. 4" 12.5 BAR (SC) ex Wavin P. 6 m m 95,000 95,500 96,000 97,000
13 Pipa PVC S 10 dia. 6" 12.5 BAR (SC) ex Wavin P. 6 m m 200,000 201,000 202,500 205,000
14 Pipa PVC S 10 dia. 2" 12.5 BAR (RR) ex Wavin P. 6 m m 31,250 31,500 32,000 32,750
15 Pipa PVC S 10 dia. 3" 12.5 BAR (RR) ex Wavin P. 6 m m 63,500 64,000 64,750 66,000
16 Pipa PVC S 10 dia. 4" 12.5 BAR (RR) ex Wavin P. 6 m m 96,000 96,500 97,500 99,000
17 Pipa PVC S 10 dia. 6" 12.5 BAR (RR) ex Wavin P. 6 m m 201,000 202,500 204,000 206,500
18 Pipa PVC S 10 dia. 8" 12.5 BAR (RR) ex Wavin P. 6 m m 309,000 310,000 311,500 314,000
19 Pipa PVC S 12.5 dia. 2" 10 BAR (SC) ex Wavin P. 6 m m 25,000 25,500 26,500 28,000
20 Pipa PVC S 12.5 dia. 3" 10 BAR (SC) ex Wavin P. 6 m m 52,000 53,000 54,000 55,500
21 Pipa PVC S 12.5 dia. 4" 10 BAR (SC) ex Wavin P. 6 m m 75,000 76,000 77,000 79,000
22 Pipa PVC S 12.5 dia. 6" 10 BAR (SC) ex Wavin P. 6 m m 160,000 162,000 164,000 167,000
23 Pipa PVC S 12.5 dia. 2" 10 BAR (RR) ex Wavin P. 6 m m 26,000 26,500 27,000 28,000
24 Pipa PVC S 12.5 dia. 3" 10 BAR (RR) ex Wavin P. 6 m m 52,250 52,750 53,750 55,000
HARGA
PAJAK
DASAR
MBLB
WILAYAH I WILAYAH II WILAYAH III WILAYAH IV
NO JENIS MATERIAL/TENAGA URAIAN SAT MBLB KETERANGAN

Rp. Rp. Rp. Rp. Rp. Rp.


1 2 3 4 5 6 8 7 8 9 10
25 Pipa PVC S 12.5 dia. 4" 10 BAR (RR) ex Wavin P. 6 m m 76,500 77,500 78,500 80,000
26 Pipa PVC S 12.5 dia. 6" 10 BAR (RR) ex Wavin P. 6 m m 163,000 164,500 167,000 169,500
27 Pipa PVC S 12.5 dia. 8" 10 BAR (RR) ex Wavin P. 6 m m 252,500 254,000 256,500 260,000
28 Pipa PVC S 16 dia. 2" 8 BAR (SC) ex Wavin P. 6 m m 21,500 21,750 22,000 23,000
29 Pipa PVC S 16 dia. 3" 8 BAR (SC) ex Wavin P. 6 m m 42,500 43,500 44,500 47,000
30 Pipa PVC S 16 dia. 4" 8 BAR (SC) ex Wavin P. 6 m m 62,000 63,000 64,000 66,500
31 Pipa PVC S 16 dia. 6" 8 BAR (SC) ex Wavin P. 6 m m 129,500 131,000 132,750 135,000
32 Pipa PVC S 16 dia. 2" 8 BAR (RR) ex Wavin P. 6 m m 22,000 22,500 23,000 24,500
33 Pipa PVC S 16 dia. 3" 8 BAR (RR) ex Wavin P. 6 m m 43,000 44,000 45,000 47,000
34 Pipa PVC S 16 dia. 4" 8 BAR (RR) ex Wavin P. 6 m m 64,000 65,000 66,000 68,000
35 Pipa PVC S 16 dia. 6" 8 BAR (RR) ex Wavin P. 6 m m 130,000 132,000 134,000 137,000
36 Pipa PVC S 16 dia. 8" 8 BAR (RR) ex Wavin P. 6 m m 206,000 208,500 210,000 212,500
37 Pipa PVC S 20 dia. 3" 5 BAR (SC) ex Wavin P. 6 m m 33,500 34,000 34,750 37,000
38 Pipa PVC S 20 dia. 4" 5 BAR (SC) ex Wavin P. 6 m m 50,000 51,500 52,500 55,000
39 Pipa PVC S 20 dia. 6" 5 BAR (SC) ex Wavin P. 6 m m 106,500 108,000 110,000 113,000
40 Faucet Socket PVC Ø 20 mm x 1/2" ex Rucika Solvent Cement bh 17,000 17,500 18,000 18,500
41 Faucet Socket PVC Ø 25 mm x 3/4" ex Rucika Solvent Cement bh 21,250 21,500 22,000 23,000
42 Faucet Socket PVC Ø 32 mm x 1" ex Rucika Solvent Cement bh 33,000 33,500 34,000 35,000
43 Faucet Socket PVC Ø 63 mm x 2" ex Rucika Solvent Cement bh 71,000 72,000 73,000 75,000
44 Faucet Socket PVC Ø 90 mm x 3" ex Rucika Solvent Cement bh 212,000 214,000 216,000 219,000
45 Faucet Socket PVC Ø 110 mm x 4" ex Rucika Solvent Cement bh 312,000 315,000 319,000 325,000
46 Valve Socket PVC Ø 20 mm x 1/2" ex Rucika Solvent Cement bh 9,000 9,250 9,500 10,500
47 Valve Socket PVC Ø 25 mm x 3/4" ex Rucika Solvent Cement bh 9,750 10,000 10,500 12,000
48 Valve Socket PVC Ø 32 mm x 1" ex Rucika Solvent Cement bh 9,750 10,000 10,500 12,000
49 Valve Socket PVC Ø 63 mm x 2" ex Rucika Solvent Cement bh 41,000 42,000 43,000 45,000
50 Valve Socket PVC Ø 90 mm x 3" ex Rucika Solvent Cement bh 127,500 128,500 130,000 132,500
51 Valve Socket PVC Ø 110 mm x 4" ex Rucika Solvent Cement bh 242,500 244,000 247,000 251,000
52 Repair Socket PVC Ø 63 mm ex Rucika Rubber Ring bh 44,000 45,500 47,500 50,000
53 Repair Socket PVC Ø 90 mm ex Rucika Rubber Ring bh 68,000 69,500 72,000 75,000
54 Repair Socket PVC Ø 110 mm ex Rucika Rubber Ring bh 96,000 98,000 101,000 105,000
55 Repair Socket PVC Ø 160 mm ex Rucika Rubber Ring bh 178,000 180,000 183,500 187,000
56 Repair Socket PVC Ø 200 mm ex Rucika Rubber Ring bh 295,000 297,500 300,000 305,000
57 Faucet Elbow PVC Ø 20 mm x 1/2"ex Rucika Solvent Cement bh 4,000 4,500 5,000 6,000
58 Faucet Elbow PVC Ø 25 mm x 3/4" ex Rucika Solvent Cement bh 4,500 5,000 5,750 7,000
55 Elbow PVC Ø 20 mm ex Rucika Solvent Cement bh 3,500 4,000 4,500 5,500
56 Elbow PVC Ø 25 mm ex Rucika Solvent Cement bh 3,750 4,250 4,750 5,750
57 Elbow PVC Ø 32 mm ex Rucika Solvent Cement bh 5,500 6,000 6,500 7,500
58 Elbow PVC Ø 63 mm ex Rucika Solvent Cement bh 59,000 60,500 62,000 64,000
59 Elbow PVC Ø 90 mm ex Rucika Solvent Cement bh 135,000 137,500 140,000 145,000
60 Elbow PVC Ø 110 mm ex Rucika Solvent Cement bh 230,000 232,500 235,000 240,000
HARGA
PAJAK
DASAR
MBLB
WILAYAH I WILAYAH II WILAYAH III WILAYAH IV
NO JENIS MATERIAL/TENAGA URAIAN SAT MBLB KETERANGAN

Rp. Rp. Rp. Rp. Rp. Rp.


1 2 3 4 5 6 8 7 8 9 10
61 Elbow PVC Ø 160 mm ex Rucika Solvent Cement bh 645,000 652,500 660,000 680,000
62 Reducer Socket PVC Ø 25 x 20 mm ex Rucika Solvent Cement bh 3,250 3,500 3,750 4,250
63 Reducer Socket PVC Ø 32 x 25 mm ex Rucika Solvent Cement bh 5,250 5,500 5,750 6,250
64 Reducer Socket PVC Ø 50 x 32 mm ex Rucika Solvent Cement bh 13,250 13,750 14,250 15,250
65 Reducer Socket PVC Ø 63 x 50 mm ex Rucika Solvent Cement bh 28,000 28,750 29,500 31,500
66 Reducer Socket PVC Ø 90 x 63 mm ex Rucika Solvent Cement bh 67,000 69,000 71,000 73,500
67 Reducer Socket PVC Ø 90 x 50 mm ex Rucika Solvent Cement bh 67,000 69,000 71,000 73,500
68 Reducer Socket PVC Ø 110 x 90 mm ex Rucika Solvent Cement bh 73,000 75,000 77,000 81,000
69 Reducer Socket PVC Ø 110 x 63 mm ex Rucika Solvent Cement bh 85,500 87,500 90,000 93,000
70 Reducer Socket PVC Ø 160 x 110 mm ex Rucika Solvent Cement bh 153,000 155,500 158,000 163,000
71 Reducer Socket PVC Ø 90 x 63 mm ex Rucika Rubber Ring bh 99,000 102,500 106,000 111,000
72 Reducer Socket PVC Ø 110 x 90 mm ex Rucika Rubber Ring bh 139,000 142,500 146,000 150,000
73 Reducer Socket PVC Ø 110 x 63 mm ex Rucika Rubber Ring bh 140,000 143,500 147,500 152,500
74 Reducer Socket PVC Ø 160 x 110 mm ex Rucika Rubber Ring bh 270,000 275,000 285,000 300,000
75 Reducer Socket PVC Ø 160 x 90 mm ex Rucika Rubber Ring bh 257,500 262,500 267,500 277,500
76 Tee PVC Ø 20 x 20 x 20 mmex Rucika Solvent Cement bh 3,000 3,250 3,500 4,250
77 Tee PVC Ø 25 x 25 x 25 mm ex Rucika Solvent Cement bh 4,000 4,250 4,500 5,250
78 Tee PVC Ø 32 x 32 x 32 mm ex Rucika Solvent Cement bh 7,250 7,600 7,900 8,300
79 Tee PVC Ø 40 x 40 x 40 mm ex Rucika Solvent Cement bh 11,000 11,750 12,500 13,750
80 Tee PVC Ø 50 x 50 x 50 mm ex Rucika Solvent Cement bh 18,750 19,500 20,250 21,500
81 Tee PVC Ø 50 x 32 x 50 mm ex Rucika Solvent Cement bh 26,000 27,000 28,000 29,500
82 Tee PVC Ø 63 x 63 x 63 mm ex Rucika Solvent Cement bh 62,500 64,000 65,500 68,000
83 Tee PVC Ø 63 x 32 x 63 mm ex Rucika Solvent Cement bh 62,500 64,000 65,500 68,000
84 Tee PVC Ø 90 x 90 x 90 mm ex Rucika Solvent Cement bh 170,000 172,500 175,000 180,000
85 Tee PVC Ø 90 x 63 x 90 mm ex Rucika Solvent Cement bh 295,000 300,000 305,000 310,000
86 Tee PVC Ø 110 x 110 x 110 mm ex Rucika Solvent Cement bh 295,000 300,000 305,000 310,000
87 Tee PVC Ø 110 x 90 x 110 mm ex Rucika Solvent Cement bh 370,000 375,000 380,000 395,000
88 Tee PVC Ø 160 x 160 x 160 mm ex Rucika Solvent Cement bh 795,000 805,000 815,000 825,000
89 Tee PVC Ø 160 x 110 x 160 mm ex Rucika Solvent Cement bh 1,115,000 1,135,000 1,155,000 1,190,000
90 Tee PVC Ø 63 x 63 x 63 mm ex Rucika Rubber Ring bh 441,000 446,000 451,000 462,500
91 Tee PVC Ø 90 x 90 x 90 mm ex Rucika Rubber Ring bh 575,000 580,000 587,500 600,000
92 Tee PVC Ø 90 x 63 x 90 mm ex Rucika Rubber Ring bh 535,000 545,000 565,000 575,000
93 Tee PVC Ø 110 x 110 x 110 mm ex Rucika Rubber Ring bh 665,000 675,000 685,000 605,000
94 Tee PVC Ø 110 x 90 x 110 mm ex Rucika Rubber Ring bh 625,000 635,000 645,000 660,000
95 Tee PVC Ø 160 x 160 x 160 mm ex Rucika Rubber Ring bh 1,475,000 1,500,000 1,550,000 1,625,000
96 Tee PVC Ø 160 x 110 x 160 mm ex Rucika Rubber Ring bh 1,310,000 1,360,000 1,410,000 1,465,000
97 End Cap PVC Ø 20 mm ex Rucika Solvent Cement bh 5,000 5,500 6,000 7,000
98 End Cap PVC Ø 25 mm ex Rucika Solvent Cement bh 6,500 7,000 7,500 8,500
99 End Cap PVC Ø 32 mm ex Rucika Solvent Cement bh 6,750 7,250 7,750 8,250
100 End Cap PVC Ø 63 mm ex Rucika Solvent Cement bh 28,000 29,000 30,000 31,500
HARGA
PAJAK
DASAR
MBLB
WILAYAH I WILAYAH II WILAYAH III WILAYAH IV
NO JENIS MATERIAL/TENAGA URAIAN SAT MBLB KETERANGAN

Rp. Rp. Rp. Rp. Rp. Rp.


1 2 3 4 5 6 8 7 8 9 10
101 End Cap PVC Ø 90 mm ex Rucika Solvent Cement bh 45,000 47,000 49,000 52,500
102 End Cap PVC Ø 110 mm ex Rucika Solvent Cement bh 53,500 55,000 57,500 60,000
103 End Cap PVC Ø 160 mm ex Rucika Solvent Cement bh 115,000 120,000 125,000 135,000
104 End Cap PVC Ø 63 mm ex Rucika Rubber Ring bh 48,500 50,000 52,500 56,000
105 End Cap PVC Ø 90 mm ex Rucika Rubber Ring bh 87,000 89,000 91,000 93,500
106 End Cap PVC Ø 110 mm ex Rucika Rubber Ring bh 170,000 175,000 180,000 190,000
107 End Cap PVC Ø 160 mm ex Rucika Rubber Ring bh 257,500 265,000 275,000 295,000
108 Clamp Saddle Ø 50 mm ex Rucika dengan uk. < 1 1/4" bh 21,500 22,000 22,500 23,500
109 Clamp Saddle Ø 63 mm ex Rucika dengan uk. < 1 1/2" bh 28,000 29,000 30,000 32,000
110 Clamp Saddle Ø 90 mm ex Rucika dengan uk. < 1 1/2" bh 31,500 32,500 33,500 35,000
111 Clamp Saddle Ø 110 mm ex Rucika dengan uk. < 1 1/2" bh 49,000 50,500 52,000 55,000
112 Clamp Saddle Ø 160 mm ex Rucika dengan uk. < 2" bh 52,000 53,500 55,000 57,000
113 Flange Spigot Ø 63 x 50 mm ex Rucika bh 260,000 265,000 270,000 280,000
114 Flange Spigot Ø 90 x 80 mm ex Rucika bh 405,000 410,000 415,000 425,000
115 Flange Spigot Ø 110 x 100 mm ex Rucika bh 595,000 600,000 605,000 612,500
116 Flange Spigot Ø 160 x 150 mm ex Rucika bh 942,500 947,500 952,500 965,000
117 Flange Socket Ø 50 x 40 mm ex Rucika Solvent Cement bh 210,000 215,000 220,000 235,000
118 Flange Socket Ø 63 x 50 mm ex Rucika Solvent Cement bh 265,000 270,000 275,500 287,500
119 Flange Socket Ø 90 x 80 mm ex Rucika Solvent Cement bh 410,000 416,000 422,500 430,000
120 Flange Socket Ø 110 x 100 mm ex Rucika Solvent Cement bh 596,000 601,000 607,000 612,500
121 Flange Socket Ø 160 x 150 mm ex Rucika Solvent Cement bh 945,000 955,000 965,000 990,000
122 Flange Socket Ø 63 x 50 mm ex Rucika Rubber Ring bh 275,000 280,000 285,000 295,000
123 Flange Socket Ø 90 x 80 mm ex Rucika Rubber Ring bh 428,000 432,500 437,500 445,000
124 Flange Socket Ø 110 x 100 mm ex Rucika Rubber Ring bh 625,000 637,500 645,000 655,000
125 Flange Socket Ø 160 x 150 mm ex Rucika Rubber Ring bh 1,012,000 1,025,000 1,037,500 1,050,500
126 Long Bend Socket Ø 63 mm x 45° ex Rucika Rubber Ring bh 50,000 52,000 54,000 57,500
127 Long Bend Socket Ø 63 mm x 90° ex Rucika Rubber Ring bh 62,000 64,000 66,000 69,000
128 Long Bend Socket Ø 90 mm x 45° ex Rucika Rubber Ring bh 109,500 111,500 113,500 116,000
129 Long Bend Socket Ø 90 mm x 90° ex Rucika Rubber Ring bh 132,500 135,000 137,500 142,000
130 Long Bend Socket Ø 110 mm x 45° ex Rucika Rubber Ring bh 184,000 188,000 192,500 199,000
131 Long Bend Socket Ø 110 mm x 90° ex Rucika Rubber Ring bh 247,500 252,000 258,000 265,000
132 Long Bend Socket Ø 160 mm x 45° ex Rucika Rubber Ring bh 508,500 515,000 525,000 535,000
133 Long Bend Socket Ø 160 mm x 90° ex Rucika Rubber Ring bh 590,000 600,000 610,000 620,000
134 L.B Double Socket Ø 63 mm x 45° ex Rucika Solvent Cement bh 39,000 40,000 41,000 43,000
135 L.B Double Socket Ø 63 mm x 90° ex Rucika Solvent Cement bh 51,000 52,500 54,500 56,500
136 L.B Double Socket Ø 90 mm x 45° ex Rucika Solvent Cement bh 84,000 85,500 87,500 90,000
137 L.B Double Socket Ø 90 mm x 90° ex Rucika Solvent Cement bh 105,000 107,500 110,000 113,000
138 L.B Double Socket Ø 110 mm x 45° ex Rucika Solvent Cement bh 150,000 153,000 156,000 160,000
139 L.B Double Socket Ø 110 mm x 90° ex Rucika Solvent Cement bh 215,000 217,500 220,000 225,000
140 L.B Double Socket Ø 160 mm x 45° ex Rucika Solvent Cement bh 440,000 447,500 454,000 464,000
HARGA
PAJAK
DASAR
MBLB
WILAYAH I WILAYAH II WILAYAH III WILAYAH IV
NO JENIS MATERIAL/TENAGA URAIAN SAT MBLB KETERANGAN

Rp. Rp. Rp. Rp. Rp. Rp.


1 2 3 4 5 6 8 7 8 9 10
141 L.B Double Socket Ø 160 mm x 90° ex Rucika Solvent Cement bh 517,000 524,500 633,500 535,500
140 L.B Double Socket Ø 63 mm x 45° ex Rucika Rubber Ring bh 77,000 79,000 81,000 83,500
141 L.B Double Socket Ø 63 mm x 90° ex Rucika Rubber Ring bh 90,000 92,000 94,000 97,000
142 L.B Double Socket Ø 90 mm x 45° ex Rucika Rubber Ring bh 154,000 157,500 161,500 165,000
143 L.B Double Socket Ø 90 mm x 90° ex Rucika Rubber Ring bh 176,000 178,500 182,000 186,500
144 L.B Double Socket Ø 110 mm x 45° ex Rucika Rubber Ring bh 246,500 250,000 256,500 263,500
145 L.B Double Socket Ø 110 mm x 90° ex Rucika Rubber Ring bh 330,000 345,000 350,000 365,000
146 L.B Double Socket Ø 160 mm x 45° ex Rucika Rubber Ring bh 660,000 675,000 690,000 710,000
147 L.B Double Socket Ø 160 mm x 90° ex Rucika Rubber Ring bh 763,500 775,000 789,000 805,000
148 Pipa Galvanis dia. 1/2" btg 150,000 160,000 175,000 200,000
149 Pipa Galvanis dia. 3/4" btg 200,000 215,000 225,000 250,000
150 Pipa Galvanis dia. 1" btg 225,000 240,000 250,000 280,000
151 Pipa Galvanis dia. 2" btg 350,000 375,000 400,000 425,000
152 Pipa Galvanis dia. 3" btg 425,000 450,000 475,000 500,000
153 Socket Galvanis dia. 1/2" bh 30,000 32,000 34,000 37,500
154 Socket Galvanis dia. 3/4" bh 37,500 39,000 41,000 44,000
155 Socket Galvanis dia. 1" bh 44,000 46,000 48,000 51,000
156 Socket Galvanis dia. 2" bh 121,000 123,500 127,000 132,000
157 Socket Galvanis dia. 3" bh 140,000 142,500 145,000 148,500
158 Gate Valve PM 10 ulir besi 2" bh 530,000 535,000 540,000 553,000
159 Gate Valve PM 10 ulir besi 3" bh 780,000 787,500 795,000 805,000
160 Gate Valve PM 10 ulir besi 4" bh 1,025,000 1,035,000 1,045,000 1,057,500
161 Gate Valve PM 10 ulir besi 6" bh 1,655,000 1,665,000 1,675,000 1,685,000
162 Gate Valve PM 10 ulir besi 8" bh 2,810,000 2,820,000 2,830,000 2,845,000
163 Gate Valve PM 10 ulir besi 10" bh 4,350,000 4,360,000 4,370,000 4,385,000
164 Air Valve 20 mm bh 310,000 316,000 322,500 330,000
165 Air Valve 3/4 mm bh 350,000 357,500 365,000 380,000
166 Kenie GI ɸ 75 (3") bh 77,500 80,000 82,500 86,500
167 Kenie GI ɸ 50 (2") bh 26,000 26,500 27,000 29,000
168 Kenie GI ɸ 25 (1") bh 35,000 35,750 36,750 38,000
169 Kenie GI ɸ 3/4" bh 20,500 21,000 21,750 23,000
170 Kenie GI ɸ 1/2" bh 15,000 15,250 15,500 16,000
171 Reduser GI 75-50 bh 85,000 87,500 90,000 93,500
172 Reduser GI 50-25 bh 47,500 48,500 49,500 51,000
173 T GI ɸ 75 (3") bh 77,500 80,000 82,500 86,500
174 T GI ɸ 50 (2") bh 26,000 26,500 27,000 29,000
175 T GI ɸ 25 (1") bh 14,000 14,250 14,500 15,500
176 T GI ɸ 3/4" bh 7,250 7,500 7,750 8,250
177 T GI ɸ 1/2" bh 5,750 6,000 6,250 6,750
178 Dop GI ɸ 75 (3") bh 43,000 44,000 45,000 47,000
HARGA
PAJAK
DASAR
MBLB
WILAYAH I WILAYAH II WILAYAH III WILAYAH IV
NO JENIS MATERIAL/TENAGA URAIAN SAT MBLB KETERANGAN

Rp. Rp. Rp. Rp. Rp. Rp.


1 2 3 4 5 6 8 7 8 9 10
179 Dop GI ɸ 50 (2") bh 28,000 28,750 29,500 30,500
180 Dop GI ɸ 25 (1") bh 24,000 24,500 25,000 26,000
181 Dop GI ɸ 3/4" bh 20,000 20,500 21,000 22,000
182 Dop GI ɸ 1/2" bh 14,000 14,500 15,000 16,000
183 Rubber Water Stop (deletasi) 250 mm m' 350,000 355,000 360,000 370,000
184 Giboult Join bh 135,000 138,000 142,500 152,500
185 Foot Klep bh 31,000 31,500 32,500 34,000
186 1/2 SCH 40 btg 102,000 105,000 108,000 113,500
187 3/2 SCH 40 btg 140,000 142,000 144,000 149,000
188 1 SCH 40 btg 200,000 205,000 210,000 220,000
189 1 1/4 SCH 40 btg 230,000 235,000 245,000 255,000
190 1 1/2 SCH 40 btg 325,000 335,000 345,000 365,000
191 2 SCH 40 btg 440,000 450,000 460,000 475,000
192 2 1/2 SCH 40 btg 720,000 730,000 740,000 755,000
193 3 SCH 40 btg 900,000 915,000 930,000 955,000
194 4 SCH 40 btg 1,300,000 1,320,000 1,340,000 1,375,000
195 5 SCH 40 btg 1,850,000 1,870,000 1,890,000 1,925,000
196 6 SCH 40 btg 2,400,000 2,450,000 2,500,000 2,600,000
197 Stop kran dia 1/2" ex onda bh 49,000 50,000 52,500 55,500
198 Stop kran dia 3/4" ex onda bh 55,000 56,000 58,000 62,000
199 Tangki Air Fiber Glass kap. 2 m3 bh 3,200,000 3,250,000 3,300,000 3,400,000
200 Tangki Air Fiber Glass kap. 3 m3 bh 6,100,000 6,150,000 6,250,000 6,450,000
201 Tangki Air Fiber Glass kap. 5 m3 bh 8,900,000 8,950,000 9,000,000 9,200,000
202 Tangki Air Fiber Glass kap. 1000 liter EXEL bh 1,220,000 1,225,000 1,230,000 1,245,000
203 Tangki Air Fiber Glass kap. 500 liter EXEL bh 700,000 705,000 710,000 725,000
204 Pelampung otomatis bh 57,500 60,000 62,500 66,000
205 Roof Drain Metal Bh 360,000 370,000 380,000 400,000
206 Buis beton dia. 20 cm P=1m bh 52,000 53,000 54,000 56,500
207 Buis beton dia. 30 cm P=1m bh 79,000 80,000 81,000 83,000
208 Buis beton dia. 40 cm P=1m bh 99,000 101,000 103,000 105,000
209 Buis beton dia. 50 cm P=1m bh 130,000 132,000 134,000 137,000
210 Buis beton dia. 60 cm P=1m bh 150,000 152,000 154,000 157,000
211 Buis beton dia. 80 cm P=0,5m bh 145,000 146,500 148,000 152,000
212 Buis beton dia. 80 cm P=1m bh 275,000 280,000 285,000 300,000
213 Buis beton dia. 100 cm P=0,25m bh 105,000 110,000 115,000 125,000
214 Buis beton U 20 cm P=1m bh 29,000 28,500 29,250 31,000
215 Buis Beton U 30 cm P=1m bh 38,000 39,000 40,000 42,000
216 Septic Tank dan Ipal Fabrikasi Kapasitas 5 m3 unit 34,595,000 34,972,000 35,349,000 26,041,000
217 Septic Tank dan Ipal Fabrikasi Kapasitas 10 m3 unit 62,271,000 62,950,000 63,620,000 64,875,000
218 Septic Tank dan Ipal Fabrikasi Kapasitas 20 m3 unit 138,380,000 139,850,000 141,399,000 144,418,000
HARGA
PAJAK
DASAR
MBLB
WILAYAH I WILAYAH II WILAYAH III WILAYAH IV
NO JENIS MATERIAL/TENAGA URAIAN SAT MBLB KETERANGAN

Rp. Rp. Rp. Rp. Rp. Rp.


1 2 3 4 5 6 8 7 8 9 10
219 Septic Tank dan Ipal Fabrikasi Kapasitas 30 m3 unit 193,732,000 195,800,000 197,950,000 202,185,000
220 Septic Tank dan Ipal Fabrikasi Kapasitas 40 m3 unit 249,084,000 251,600,000 254,518,000 259,950,000
221 Septic Tank dan Ipal Fabrikasi Kapasitas 50 m3 unit 276,760,000 279,700,000 282,798,000 288,836,000
222 Pompa Air kap. 125 watt unit 415,000 420,000 425,000 435,000
223 Pompa Sentrifugal Multy Stage Total Head 42 m Kap. 1/dt Single Phase 220 V unit 2,250,000 2,250,000 2,250,000 2,250,000

XVII BAHAN ASPAL


1 Aspal Drum Segel kg 10,675 10,700 10,750 10,800
2 Aspal Curah kg 8,850 8,900 8,950 9,000

XVIII PERALATAN ELEKTRIKAL


1 Box panel PVC isi 4 MCB ex. Legran bh 36,750 36,750 36,750 36,750
2 Box Trafo bh 82,500 82,500 82,500 82,500
3 Box KWH 1 Phase uk 30 x 40 cm bh 475,000 475,000 475,000 475,000
4 Box KWH 1 Phase uk 40 x 50 cm bh 625,000 625,000 625,000 625,000
5 T Dus Besar bh 19,000 19,000 19,000 19,000
6 Dora Dus bh 25,000 25,000 25,000 25,000
7 MCB 50 A ex. Legran bh 90,000 90,000 90,000 90,000
8 MCB 20 A ex. Legran bh 69,500 69,500 69,500 69,500
9 MCB 10 A ex. Legran bh 59,500 59,500 59,500 59,500
10 MCB 6 A ex. Legran bh 49,000 49,000 49,000 49,000
11 MCB 4 A ex. Legran bh 80,000 80,000 80,000 80,000
12 Kawat Seling ɸ 0.5" m' 48,500 48,500 48,500 48,500
13 Bend GI 3" bh 213,000 213,000 213,000 213,000
14 Bend GI 2" bh 136,500 136,500 136,500 136,500
15 Tiang LPJU Pipa Hitam lk 3 mm bh 2,200,000 2,200,000 2,200,000 2,200,000
16 Penggantung Pipa LPJU (konsolan) bt 50,000 50,000 50,000 50,000
17 Kabel Tanam m' 52,500 52,500 52,500 52,500
18 Kabel NYM 2 x 2,5 mm2 m 16,000 16,000 16,000 16,000
19 Kabel NYM 3 x 2,5 mm2 m 21,500 21,500 21,500 21,500
20 Kabel NYY 2 x 6 mm2 m 39,000 39,000 39,000 39,000
21 Kabel LVTC 2 x 10 mm2 m 8,000 8,000 8,000 8,000
22 Kabel LVTC 2 x 16 mm2 m 10,000 10,000 10,000 10,000
23 Kabel Coax 3 c 75 ohm m 6,000 6,000 6,000 6,000
24 Kabel telephone 4 x 0.5 mm m 6,000 6,000 6,000 6,000
25 Isolasi bh 6,000 6,000 6,000 6,000
26 Klem bh 7,500 7,500 7,500 7,500
27 Mangkok Listrik bh 3,500 3,500 3,500 3,500
28 Saklar tunggal ex. Broco bh 3,500 3,500 3,500 3,500
29 Saklar ganda ex. Broco bh 14,000 14,000 14,000 14,000
HARGA
PAJAK
DASAR
MBLB
WILAYAH I WILAYAH II WILAYAH III WILAYAH IV
NO JENIS MATERIAL/TENAGA URAIAN SAT MBLB KETERANGAN

Rp. Rp. Rp. Rp. Rp. Rp.


1 2 3 4 5 6 8 7 8 9 10
30 Stop kontak ex. Broco bh 17,000 17,000 17,000 17,000
31 Outlet TV ex. Broco bh 15,000 15,000 15,000 15,000
32 Outlet telephone ex. Broco bh 50,000 50,000 50,000 50,000
33 Saklar exhause ex. Broco bh 27,000 27,000 27,000 27,000
34 Down light / PLC 13 W bh 30,000 30,000 30,000 30,000
35 Fitting plafond + lampu SL ex. Panasonic bh 45,000 45,000 45,000 45,000
36 Fitting Lampu Kap Gembreng bh 35,000 35,000 35,000 35,000
37 Lampu TL 2 x 18 watt grille ex. Panasonic bh 215,000 215,000 215,000 215,000
38 Lampu TL 2 x 36 watt grille ex. Panasonic bh 360,000 360,000 360,000 360,000
39 Tabung Lampu HPS T 250 VA ex. Philips bh 262,000 262,000 262,000 262,000
40 Tabung Lampu HPS T 150 VA ex. Philips bh 242,000 242,000 242,000 242,000
41 Tabung Lampu HPS E 250 VA ex. Philips bh 249,000 249,000 249,000 249,000
42 Tabung Lampu HPS E 150 VA ex. Philips bh 237,000 237,000 237,000 237,000
43 Tabung Lampu HPS E 70 VA ex. Philips bh 152,000 152,000 152,000 152,000
44 Tabung HPIT 250 VA ex. Philips bh 247,000 247,000 247,000 247,000
45 Tabung SL 25 VA ex. Philips bh 50,000 50,000 50,000 50,000
46 Ballas 250 VA ex. Philips bh 290,000 290,000 290,000 290,000
47 Ballas 125 VA ex. Philips bh 160,000 160,000 160,000 160,000
48 Elektronik Ignitor ex Luxlodh bh 125,000 125,000 125,000 125,000
49 Ignitor 250 watt ex. Philips bh 125,000 125,000 125,000 125,000
50 Photosel 10 A ex. Selcon bh 140,000 140,000 140,000 140,000
51 Photosel 6 A ex. Selcon bh 100,000 100,000 100,000 100,000
52 Kontaktor SK 32 ex. Mitsubishi bh 495,000 495,000 495,000 495,000
53 Kontaktor SK 25 ex. Mitsubishi bh 395,000 395,000 395,000 395,000
54 Kontaktor SK 20 ex. Mitsubishi bh 360,000 360,000 360,000 360,000
55 Kontaktor SK 10 ex. Mitsubishi bh 210,000 210,000 210,000 210,000
56 Kap Lampu un. Desa-desa bh 43,500 43,500 43,500 43,500
57 Hausing HRC 504/250 VA bh 475,000 475,000 475,000 475,000
58 Hausing HRC 27 bh 300,000 300,000 300,000 300,000
59 Capasitor 25 UF 250 mV bh 97,500 97,500 97,500 97,500
60 Klustin 16 mm bh 18,000 18,000 18,000 18,000
61 Klustin 10 mm bh 16,000 16,000 16,000 16,000
62 Capit Urang bh 25,000 25,000 25,000 25,000
63 Begel 3 mm x 4 cm 3 dim bh 29,000 29,000 29,000 29,000
64 Baut 0.5 x 7 bh 10,000 10,000 10,000 10,000
65 BP PLN 5.500 VA unit 7,500,000 7,500,000 7,500,000 7,500,000
66 BP PLN 4.500 VA unit 6,000,000 6,000,000 6,000,000 6,000,000
67 BP PLN 3.500 VA unit 5,000,000 5,000,000 5,000,000 5,000,000
68 BP PLN 2.200 VA unit 3,400,000 3,400,000 3,400,000 3,400,000
69 BP PLN 1.300 VA unit 2,000,000 2,000,000 2,000,000 2,000,000
HARGA
PAJAK
DASAR
MBLB
WILAYAH I WILAYAH II WILAYAH III WILAYAH IV
NO JENIS MATERIAL/TENAGA URAIAN SAT MBLB KETERANGAN

Rp. Rp. Rp. Rp. Rp. Rp.


1 2 3 4 5 6 8 7 8 9 10
70 BP PLN 900 VA unit 1,750,000 1,750,000 1,750,000 1,750,000
71 Tiang LPJU Ornamen unit 6,000,000 6,000,000 6,000,000 6,000,000
72 Tiang LPJU Galvanis unit 3,600,000 3,600,000 3,600,000 3,600,000
73 Armatur Lengkap SPP 186 ex. Philips bh 2,750,000 2,750,000 2,750,000 2,750,000
74 Armatur Lengkap SPP 166 ex. Philips bh 1,980,000 1,980,000 1,980,000 1,980,000
75 Lampu SL 45 Watt ex. Philips bh 85,000 85,000 85,000 85,000

XIX UPAH PEKERJA :


1 Juru Ukur Org/Hr 70,000 70,000 70,000 70,000
2 Pembantu Juru Ukur Org/Hr 55,000 55,000 55,000 55,000
3 Tukang Besi Org/Hr 70,000 70,000 70,000 70,000
4 Tukang Kayu Org/Hr 70,000 70,000 70,000 70,000
5 Tukang Batu Org/Hr 70,000 70,000 70,000 70,000
6 Tukang Cat Biasa Org/Hr 70,000 70,000 70,000 70,000
7 Tukang Cat Duco Org/Hr 70,000 70,000 70,000 70,000
8 Tukang Listrik Org/Hr 70,000 70,000 70,000 70,000
9 Tukang Las Org/Hr 70,000 70,000 70,000 70,000
10 Tukang Aluminium Org/Hr 70,000 70,000 70,000 70,000
11 Kepala Tukang Org/Hr 72,500 72,500 72,500 72,500
12 Pekerja Org/Hr 50,000 50,000 50,000 50,000
13 Mandor Org/Hr 72,500 72,500 72,500 72,500
14 Penjaga Malam Org/Hr 50,000 50,000 50,000 50,000
15 Pengemudi Org/Hr 72,500 72,500 72,500 72,500
16 Operator Org/Hr 72,500 72,500 72,500 72,500
17 Pembantu Operator Org/Hr 60,000 60,000 60,000 60,000
18 Operator Alat Berat Org/Hr 100,000 100,000 100,000 100,000
19 Pembantu Operator / Mekanik Org/Hr 75,000 75,000 75,000 75,000

PENGADAAAN BANGUNAN BARU


I Indek Harga Satuan Tertinggi Per M2
Bangunan Gedung Negara
A BERTINGKAT
1 Tidak Sederhana m2 6,248,000 6,248,000 6,248,000 6,248,000
2 Sederhana m2 5,117,000 5,117,000 5,117,000 5,117,000
B TIDAK BERTINGKAT
1 Tidak Sederhana m2 4,531,000 4,531,000 4,531,000 4,531,000
2 Sederhana m2 3,951,000 3,951,000 3,951,000 3,951,000
Rumah Negara
1 Tipe A m2 4,418,000 4,418,000 4,418,000 4,418,000
2 Tipe B m2 4,148,000 4,148,000 4,148,000 4,148,000
HARGA
PAJAK
DASAR
MBLB
WILAYAH I WILAYAH II WILAYAH III WILAYAH IV
NO JENIS MATERIAL/TENAGA URAIAN SAT MBLB KETERANGAN

Rp. Rp. Rp. Rp. Rp. Rp.


1 2 3 4 5 6 8 7 8 9 10
3 Tipe C, D, E m2 3,682,000 3,682,000 3,682,000 3,682,000
II Indek Harga Satuan Tertinggi Per M'
Pagar Gedung Negara
1 Depan BT; T. 1,50 M m' 1,679,000 1,679,000 1,679,000 1,679,000
2 Samping T. 2 M m' 1,290,000 1,290,000 1,290,000 1,290,000
3 Belakang T. 3 M m' 1,419,000 1,419,000 1,419,000 1,419,000
Pagar Rumah Negara
1 Depan BH; T. 1,50 M m' 1,598,000 1,598,000 1,598,000 1,598,000
2 Samping T. 2 M m' 1,205,000 1,205,000 1,205,000 1,205,000
3 Belakang T. 2,5 M m' 1,196,000 1,196,000 1,196,000 1,196,000

PEMELIHARAAN BANGUNAN GEDUNG


I Indek Harga Pemeliharaan Per M2/Tahun
Bangunan Gedung Negara
A BERTINGKAT
1 Tidak Sederhana m2/th 20% 99,886 99,886 99,886 99,886
2 Sederhana m2/th 20% 96,669 96,669 96,669 96,669
B TIDAK BERTINGKAT 20%
1 Tidak Sederhana m2/th 20% 83,941 83,941 83,941 83,941
2 Sederhana m2/th 81,731 81,731 81,731 81,731
Rumah Negara
1 Tipe A m2/th 91,025 91,025 91,025 91,025
2 Tipe B m2/th 20% 86,790 86,790 86,790 86,790
3 Tipe C, D, E m2/th 20% 74,741 74,741 74,741 74,741
II Indek Harga Pemeliharaan Per M'/Tahun 20%
Pagar Gedung Negara 20%
1 Depan BT; T. 1,50 M m'/th 20% 37,088 37,088 37,088 37,088
2 Samping T. 2 M m'/th 20% 28,552 28,552 28,552 28,552
3 Belakang T. 3 M m'/th 20% 30,374 30,374 30,374 30,374
Pagar Rumah Negara 20%
1 Depan BH; T. 1,50 M m'/th 20% 36,467 36,467 36,467 36,467
2 Samping T. 2 M m'/th 20% 27,365 27,365 27,365 27,365
3 Belakang T. 2,5 M m'/th 20% 26,795 26,795 26,795 26,795

BUPATI WONOGIRI
file:///conversion/tmp/scratch/375635176.xls

DAFTAR HARGA SATUAN BAHAN BANGUNAN

:
D A E R A H : PALEMBANG

HARGA
NO. J E N I S B A H A N SATUAN KETERANGAN
(Rp)

I BAHAN DASAR
1 BATU KALI Bulat Utuh m3 492,900
Belah Putih m3 465,000
Bulat Belah m3 350,000
Pecah 10/15 m3 370,000
Pecah 5/7 m3 350,000
Pecah 3/5 m3 350,000
2 KERIKIL Sirtu m3 236,000
Sawur / Koral m3 236,000
Beton 0,5/1 m3 211,250
Beton ,1/2 m3 267,000
Beton ,2/3 m3 261,000
Biasa m3 87,500
Tras Giling m3 210,000
3 BATU BATA ex lokal bh 550

4 PASIR Urug m3 95,000


Pasang m3 95,000
Beton m3 125,000
5 TANAH Padas m3 55,000
Urug m3 59,500
Liat m3 60,000
6 KAPUR Pasang m3 120,000
Semen Merah m3 160,000
7 PORTLAND CEMENT
PC 50 zak (Batu Raja) zak 67,000 56,000
kg 1,340
Floor Hardener zak 56,000
Semen Putih 40 kg kg 6,000

II BAHAN PENUTUP ATAP

1 SIRAP (100 lbr) pak 185,000

2 GENTENG METAL Genteng Metal Berpasir 2x5 (0,45) lbr 95,000


Nok Genteng Metal bh 23,000

4 GENTENG KACA
Vlaam tebal 2 mm bh 8,500
Vlaam tebal 3 mm bh 9,000
Kodok tebal 2 mm bh 8,500
Kodok tebal 3 mm bh 10,500

5 ASBES GELOMBANG BESAR


. 200 cm X 102 cm X 5 mm bh 78,000
Asbes Gelombang 5 kpg 52,000

NOK Jabes nok


. Kerpus Genteng bh 36,000
. Stel Besar bh 36,000
. Paten Besar bh 38,000
Nokstel gelombang harflex
. Stel Besar bh 35,000
. Patent Besar bh 31,000

375635176.xls 20/116 daftar harga bahan


file:///conversion/tmp/scratch/375635176.xls

HARGA
NO. J E N I S B A H A N SATUAN KETERANGAN
(Rp)

. Plat besar bh 45,000

6 ASBES PLAT
. 100cm X 100 cm X 3 mm bh 16,000
. 100cm X 100 cm X 4 mm bh 17,000
. 50 cm X 200 cm X 3 mm bh 13,500
. 40 cm X 200 cm X 3 mm bh 12,500

7 FIBRE GLASS (JABES)


180 X 92 cm bh 48,000
200 X 92 cm bh 60,000
250 X 92 cm bh 70,000
180 X 105 cm bh 63,000
210 X 105 cm bh 61,000
GALVALUM 100 X 100 cm m 82,700
8 SENG PLAT
BJLS 0,18 lebar 55 cm m' 19,100
BJLS 0,20 lebar 55 cm m' 44,000
BJLS 0,28 lebar 55 cm m' 30,000
BJLS 0,30 lebar 55 cm m' 21,000
9 SENG GELOMBANG
Seng Plat lbr 19,100
BJLS 0,18 panjang 180 cm lbr 51,500
BJLS 0,20 panjang 180 cm lbr 59,500
BJLS 0,30 panjang 180 cm lbr 52,000

375635176.xls 21/116 daftar harga bahan


file:///conversion/tmp/scratch/375635176.xls

HARGA
NO. J E N I S B A H A N SATUAN KETERANGAN
(Rp)

BJLS 0,40 panjang 180 cm lbr 62,000


III . B A H A N K A Y U
1 Merawan Papan m3 5,500,000
Balok/pesagen m3 5,800,000

5 RACUK Papan m3 1,400,000


Balok/pesagen m3 1,600,000

6 BENGKIRAI Papan m3 12,495,000


Balok/pesagen m3 11,408,000

7 DOLKEN Sedang 8 x 10 x 400 cm bt 12,000


Kecil 6 x 7 x 400 cm bt 8,000
Besar 10 x 12 x 400 cm bt 15,000
Kayu cetakan m3 1,400,000
Kayu bakar m3 120,000
Bambu bt 11,000

IV . BAHAN PENUTUP DINDING / LANTAI

375635176.xls 22/116 daftar harga bahan


file:///conversion/tmp/scratch/375635176.xls

HARGA
NO. J E N I S B A H A N SATUAN KETERANGAN
(Rp)

1 Keramik 20 X 20 cm bh 2,360
10 x 20 cm bh 1,000
dinding 20 X 20 cm bh 2,400
dinding 10 x 20 cm bh 1,200
50 x 50 cm bh 30,063
50 x 10 cm bh 12,818
2 Granite 60 x 60 cm bh 133,250
3 Kanstin model raam/65cm bh 104,478
4 Batu Andesit bintik m2 175,000
5 Batu Andesit m2 195,000
6 Paving Blok t 6 cm K 250 m2 123,300
7 Floor Hardener kg 7,500

V.BAHAN CETAK
1 BUIS BETON Ø 100 cm m 750,000
80 cm m 650,000

2 LUBANG ANGIN (ROSTER) PC + PASIR


12 X 11 X 24 cm bh 20,600
20 X 20 cm bh 13,500
25 X 25 cm bh 6,800
30 X 30 cm bh 7,300
15 X 25 cm bh 7,500
15 X 30 cm bh 13,500
Glass Block 20 X 20 cm bh 23,400
VI . B A H A N B E S I
1 BESI BETON besi beton polos U. 39 kg 12,500
besi beton polos U. 24 kg 12,500
besi beton 13 ulir batang 103,000

2 BESI PLAT Besi Strip kg 12,600

3 BESI PROFIL Besi Profil kg 11,400

4 JARING - JARING BAJA


Diameter 4 - 15 kg 17,000
Diameter 6 - 15 kg 17,000
Kawat Bronjong kg 10,000
5 BESI SIKU L 40 X 40 X 4 btg 140,000
L 50 X 50 X 5 btg 215,000
L 60 X 60 X 6 btg 320,000
BESI CANAL C 50X150X2.3 btg 288,500
BESI HOLLOW 40X40 btg 26,500
6 KAWAT - Ikat beton/bendrat kg 18,000
- Harmonika 12 X 45 mm m2 21,500

375635176.xls 23/116 daftar harga bahan


file:///conversion/tmp/scratch/375635176.xls

HARGA
NO. J E N I S B A H A N SATUAN KETERANGAN
(Rp)

- Harmonika 12 X 24 mm m2 23,000
- Harmonika 14 X 30 mm m2 23,000
- Harmonika 14 X 35 mm m2 21,000
- Kawat Nyamuk Nylon m2 12,000
- Kawat Kasa m2 13,000
- Saringan pasir m2 14,500
- Kawat loket m2 11,000
- Kawat duri rol 80,000
- Kawat bronjong kg 20,000
7 Rangka Atap Baja Ringan Bentang 1 s/d 5 m m2 165,000
8 Rangka Atap Baja Ringan Bentang 5 s/d 10 m m2 175,000
9 Rangka Atap Baja Ringan Bentang 10 s/d 15 m m2 185,000

VII . B A H A N P I P A
1 Pipa PVC SII SCJ , S - 12,5 (10 bar)
Pipa PVC DN 20 ( ½" ) AW JIS btg 19,000 panjang 4 m
Pipa PVC DN 25 ( ¾" ) AW JIS btg 26,000 panjang 4 m
Pipa PVC DN 32 ( 1" ) AW JIS btg 32,000 panjang 4 m
Pipa PVC DN 40 ( 1½" ) btg 55,000 panjang 6 m
Pipa PVC DN 63 ( 2" ) btg 156,000 panjang 6 m
Pipa PVC WAVIN ( 3" ) btg 155,000 panjang 6 m
Pipa PVC WAVIN ( 4" ) btg 257,000 panjang 6 m
Pipa PVC DN 160 ( 6" ) btg 978,000 panjang 6 m
Pipa PVC DN 200 ( 8" ) btg 1,515,000 panjang 6 m
Pipa PVC DN 250 ( 10" ) btg 1,100,000 panjang 6 m
Pipa PVC DN 315 ( 12" ) btg 1,400,000 panjang 6 m

3 Pipa Medium B Galvanis - SII


Pipa Medium B Galvanis DN ½" btg 140,000 panjang 6 m
Pipa Medium B Galvanis DN 25 ( ¾" ) btg 190,000 panjang 6 m
Pipa Medium B Galvanis DN 32 ( 1" ) btg 160,000 panjang 6 m
Pipa Medium B Galvanis DN 50 ( 1½" ) btg 220,000 panjang 6 m
Pipa Medium B Galvanis DN 63 ( 2" ) btg 280,000 panjang 6 m
Pipa Medium B Galvanis DN 2½" btg 340,000 panjang 6 m
Pipa Medium B Galvanis DN 90 ( 3" ) btg 450,000 panjang 6 m
Pipa Medium B Galvanis DN 110 ( 4" ) btg 570,000 panjang 6 m
Pipa Medium B Galvanis DN 160 ( 6" ) btg 970,000 panjang 6 m
Pipa Medium B Galvanis DN 200 ( 8" ) btg 1,900,000 panjang 6 m
Pipa Medium B Galvanis DN 250 ( 10") btg - panjang 6 m
Pipa BSA (Black steel) Ø 3" x 2mm btg 481,000 panjang 6 m
VIII . B A H A N L A N G I T - L A N G I T
1 PVC Putih m2 175,000
Warna m2 250,000

2 SOFT BOARD-uk: 4'X 8'


Gypsum tebal 9 mm lbr 70,000
List Gypsum Board batang 17,000

4 PLY WOOD
Teak wood
90 X 120 X 3 mm lbr 46,700
. 120 X 240 X 3 mm lbr 46,700
. 90 X 210 X 4 mm lbr 56,200
. 90 X 210 X 9 mm lbr 135,700

375635176.xls 24/116 daftar harga bahan


file:///conversion/tmp/scratch/375635176.xls

HARGA
NO. J E N I S B A H A N SATUAN KETERANGAN
(Rp)

. 90 X 210 X 12 mm lbr 174,900


. 90 X 210 X 15 mm lbr 224,800
. 90 X 210 X 18 mm lbr 262,900
Tripleks
. 120 X 240 X 3 mm lbr 46,000
. 120 X 240 X 4 mm lbr 65,000
. 120 X 240 X 6 mm lbr 70,000
Multipleks
. 120 X 240 X 9 mm lbr 100,000
. 120 X 240 X 12 mm lbr 215,000
. 120 X 240 X 15 mm lbr 180,000
. 120 X 240 X 18 mm lbr 295,000
Formika ukuran pintu lbr 55,000

IX . B A H A N F I N I S H I N G
1 KAYU
Menie kg 45,100
Dempul plamur kg 9,300
Ambril/amplas lbr 3,400
Batu Apung kg 6,000
Cat dasar kg 31,000
. Emco kg 58,000
. Yunior 66 (nippon paint) kg 60,200
- Kuas bh 11,000
. Deculux kg 62,000
. Siralax ons 11,000
. Spiritus ltr 11,000
. Plitur jadi ltr 63,000

2 TEMBOK
Kalkarium kg 4,800
Kapur sirih kg 5,100
Plamur kg 16,600
Dulux (interior) kg 22,500
Dulux (eksterior) 2,5 kg 267,200
Cat dasar kg 33,000

3 BESI
Menie kg 32,900
Cat mengkilat kg 62,000
Cat kg 32,000
Thinner A ltr 15,000
Minyak cat ltr 26,000
Thinner Super ltr 29,500
Residu (teer/aspal) drum 65,000
Fibre glass (tanki air)
kapasitas 550 liter. bh 750,000
kapasitas 1100 liter. bh 1,350,000
Lem Aica Aibon kg 35,000
4 Anti Rayap kg 27,000

X.BAHAN KACA
1 POLOS 5 mm m2 95,000
2 RAY BAND 5 mm m2 420,000
3 TEMPERED m2 920,000
4 SEALENT tube 28,000

XI . BAHAN INSTALASI LISTRIK

375635176.xls 25/116 daftar harga bahan


file:///conversion/tmp/scratch/375635176.xls

HARGA
NO. J E N I S B A H A N SATUAN KETERANGAN
(Rp)

1 KABEL LISTRIK
N YA : . 1 X 1 1/2 mm2 m' 3,500
SPLN LMK 1 X 2 1/2 mm2 m' 3,800
. 1X4 mm2 m' 6,000
1X6 mm2 m' 9,000
NYY :. 2 X 1 1/2 mm2 m' 9,100
PRIMA 2 X 2 1/2 mm2 m' 15,000
. 2X4 mm2 m' 26,000
2X6 mm2 m' 36,000
3 X 1 1/2 mm2 m' 14,000
3 X 2 1/2 mm2 m' 21,000
3X4 mm2 m' 36,000
3X6 mm2 m' 52,000
NYM :. 2 X 1 1/2 mm2 m' 7,800
PRIMA 2 X 2 1/2 mm2 m' 9,000
. 2X4 mm2 m' 23,500
3 X 1 1/2 mm2 m' 14,000
3 X 2 1/2 mm2 m' 21,000
3X4 mm2 m' 34,000
3X6 mm2 m' 46,000

2 SAKELAR
Out bauw . Seri bh 17,000
. Engkel bh 15,600

5 FITING Flaon bh 15,000


Gantung bh 9,500
Kap bh 15,000
Kombinasi bh 27,500

6 STOP KONTAK - Clipsal bh 17,000

375635176.xls 26/116 daftar harga bahan


file:///conversion/tmp/scratch/375635176.xls

HARGA
NO. J E N I S B A H A N SATUAN KETERANGAN
(Rp)

7 Lampu Phillips 15 W bh 40,300


8 Lampu SL 25 watt bh 75,000
9 Lampu Downlight bh 85,000
10 Lampu Sorot bh 300,000
11 Lampu Baret bh 175,000
12 Lampu gantung bh 85,000,000
13 Lampu taman bh 699,000
14 Panel Box + MCB 2A bh 705,000

XII . ALAT - ALAT PENGUNCI & PENGGANTUNG


1 KUNCI TANAM Toto bh 159,000
KM bh 65,000

2 ENGSEL DAN GERENDEL


Engsel 4" bh 70,000
Engsel 3" bh 35,000
Grendel bh 30,000
Kait Angin bh 43,500
Handle Pintu bh 251,000
Handle Jendela bh 41,500

XIII . BAHAN SANITAIR


1 KLOSET DUDUK TOTO bh 2,280,000
2 KLOSET JONGKOK TOTO bh 339,000
3 WASTAFEL bh 421,000
8 ZINK bh 160,000
9 SOAP HOLDER bh 30,000
10 FLOOR DRAIN bh 125,000
11 BAK MANDI FIBERGLASS bh 395,000
12 KRAN AIR bh 198,000
13 KRAN AIR ANGSA bh 225,000
14 SHOWER bh 210,000
15 TANDON AIR 500L bh 800,000
16 POMPA AIR SANYO bh 570,000
17 WATER HEATER bh 1,400,000
18 SEAL TAPE bh 10,000
19 URINOIR bh 2,055,000
20 SEPTIC TANK (ETERNIT GRESIK)
5 Pemakai 500 liter unit 4,038,000
10 Pemakai 1.000 liter unit 5,708,400

XIV . ALAT PENGIKAT KAYU


1 PAKU - ukuran 1" s/d 4" kg 18,000
2 PAKU - payung kg 24,500
3 PAKU - sekrup kg 15,000
4 PAKU - beton kg 20,500
5 MUR BAUT (kuda-kuda) kg 15,000
6 ANGKUR BAUT bh 13,500
7 LEM KAYU bh 19,400
8 Tali Ijuk kg 7,800

X VI . PAVING BLOCK
1 SQUARE Abu-abu m2 60,000
Merah/hitam m2 65,000
2 HOLLAND Abu-abu m2 60,000
Merah/hitam m2 65,000
3 UNIDECOR Abu-abu m2 60,000
Merah/hitam m2 65,000
4 UNI Abu-abu m2 60,000

375635176.xls 27/116 daftar harga bahan


file:///conversion/tmp/scratch/375635176.xls

HARGA
NO. J E N I S B A H A N SATUAN KETERANGAN
(Rp)

Merah/hitam m2 65,000
5 TRIHEX Abu-abu m2 60,000
Merah/hitam m2 65,000
6 OLYMPIA HEXA Abu-abu m2 60,000
7 HEXAGONAL Abu-abu m2 65,000
Merah/hitam m2 60,000
8 CASTLE Abu-abu m2 65,000
9 TRAPEZ Abu-abu m2 60,000
10 TRAPEZ GRASS BLOCK
Abu-abu m2 60,000
11 STANDARD GRASS BLOCK ABU-ABU BH 25,000
12 BATACO BH 3,800
13 KANSTEEN m' 53,000
XVII. L A I N - L A I N
1 Naco bh 181,800
2 Pintu Lipat Besi unit 2,750,000
3 Kusen Almunium 4" Putih m' 46,667
4 ASPAL.
5 Aspal Ex Pertamina isi Net 160 kg drum 1,700,000
9 Rumput Gajah Mini m2 35,000
10 Taman Perindang Kucai Jepang polybag 7,000
Anggrek Tanah polybag 10,000
11 Pohon Cemara lilin btg 125,000
12 PAGAR BRC. Pagar BRC 90 A2 /lb 520,000
Pagar BRC 120 A2 /lb 620,000

375635176.xls 28/116 daftar harga bahan


RENCANA ANGGARAN BIAYA
( RAB )
KABUPATEN : PALEMBANG
LOKASI : KOMPLEK RUMAH DINAS SEMEN BATURAJA
NAMA KEGIATAN : PEMBANGUNAN MASJID
TAHUN ANGGARAN : 2017

UKURAN
NO URAIAN PEKERJAAN VOLUME SATUAN
P L T
1 2 3 4 5 6 7
I PEKERJAAN PERSIAPAN
1 Membersihkan Lapangan dan Perataan 20.00 20.00 400.00 m²
2 Pemasangan pagar sementara seng gelombang tinggi 2 m 20.00 20.00 m'
3 Pemasangan bowplank 274.00 274.00 m'
4 Mobilisasi - Demobilisasi 1.00 1.00 Ls

II PEKERJAAN TANAH
1 Galian tanah
a galian tanah pondasi batukali 280.00 0.70 1.35 264.60 m³
b galian tanah pondasi telapak 1.70 1.70 2.00 23.12 m³
1.20 1.20 2.00 37.44 m³
1.00 1.00 2.00 40.00 m³
c galian saluran air hujan (9 titik) 0.60 0.60 1.00 3.24 m³
2 Urugan tanah kembali 245.33 m³
Urug tanah peninggian 400.00 0.50 200.00 m³
3 Urugan pasir
a pasir bawah pondasi batukali 280.00 0.70 0.10 19.60 m³
b pasir bawah pondasi telapak 1.70 1.70 0.10 1.16 m³
1.20 1.20 0.10 1.87 m³
1.00 1.00 0.10 2.00 m³
4 Urugan sirtu peninggian lantai 400.00 0.10 40 m³

III PEKERJAAN PONDASI


1 Pemasangan Pondasi Batu Kali 1SP : 8 PP 280.00 0.43 0.80 95.20 m³

IV PEKERJAAN PASANGAN DINDING


1 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1 Bata Camp. 1SP : 6PB 3.82 5.30 20.25 m²
dikurangi:
dinding terawang 0.80 3.80 6.08 m²
14.17 m²
2 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 6PB
101.98 5.30 540.47 m²
24.35 1.75 42.61 m²
0.00 m²
dikurangi:
jendela (12) 2.74 32.84 m²
pintu jendela (6) 11.48 68.86 m²
pintu (3) 2.23 6.69 m²
roster 1.00 1.00 21.00 m²
466.06 m²
3 Pemasangan Dinding Terawang (Rooster) Uk, (12x11x24)cm Camp. 1SP : 4PB 1.00 1.00 21.00 m²
3.14 87.93 m²
0.80 3.80 6.08 m²

V HARGA SATUAN PEKERJAAN PLESTERAN


1 Pemasangan Plesteran 1 Pc : 8 PB Tebal 15 mm 960.44 960.44 m²
2 Pemasangan Acian 935.72 935.72 m²
3 Pemasangan skoneng 792.00 792.00 m²

VI PEKERJAAN B E T O N
1 Memasang pondasi telapak
a Memasang bekisting untuk pondasi 1.70 1.70 0.30 8.16 m²
b Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 1.70 1.70 0.30 3.47 m³
c Pembesian dg Besi Polos 114.16 kg
2 Memasang pondasi telapak
a Memasang bekisting untuk pondasi 1.20 1.20 0.30 18.72 m²
b Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 1.20 1.20 0.30 5.62 m³
c Pembesian dg Besi Polos 184.86 kg
3 Memasang pondasi telapak
a Memasang bekisting untuk pondasi 1.00 1.00 0.30 24.00 m²
b Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 1.00 1.00 0.30 6.00 m³
c Pembesian dg Besi Polos 197.50 kg
4 Memasang sloof beton bertulang 20/40
a Memasang bekisting untuk sloof 280.00 0.20 0.40 224.00 m²
b Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 280.00 0.20 0.40 22.40 m³
c Pembesian dg Besi 1088.18 kg
5 Memasang kolombeton bertulang 40/40
a Memasang bekisting untuk kolom 115.60 0.40 0.40 184.96 m²
b Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 115.60 0.40 0.40 18.50 m³
c Pembesian dg Besi 1436.52 kg
6 Memasang kolom beton bertulang 30/30
a Memasang bekisting untuk kolom 95.20 0.30 0.30 114.24 m²
b Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 95.20 0.30 0.30 8.57 m³
c Pembesian dg Besi 1085.28 kg
7 Memasang kolom beton bertulang 15/40
a Memasang bekisting untuk kolom 40.80 0.15 0.40 24.48 m²
b Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 40.80 0.15 0.40 2.45 m³
c Pembesian dg Besi 369.78 kg
8 Memasang ringbalk beton bertulang 15/30
a Memasang bekisting untuk ringbalk 280.00 0.15 0.30 210.00 m²
b Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 280.00 0.15 0.30 12.60 m³
c Pembesian dg Besi Polos 2102.80 kg
9 Memasang kubah
a Memasang bekisting untuk kubah 398.20 0.10 398.20 m²
b Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 398.20 0.10 39.82 m³
c Pembesian dg Besi Polos 3932.19 kg
10 Memasang dag lantai bawah
a Memasang bekisting untuk pelat 400.00 0.12 409.60 m²
b Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 400.00 0.12 48.00 m³
c Pembesian dg Besi Polos 4044.80 kg
11 Memasang dag lantai atas
a Memasang bekisting untuk dag 261.91 0.12 269.11 m²
b Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 261.91 0.12 31.43 m³
c Pembesian dg Besi Polos 2657.46 kg

VII PEKERJAAN KAYU


1 Pembuatan & Pemasangan Kosen Pintu & Jendela Kayu Merawan/Tembesu
a jendela (12) 0.55 0.12 0.79 m³
b pintu jendela (6) 3.50 0.12 2.52 m³
c pintu (3) 0.27 0.12 0.10 m³
2 Pembuatan & Pemasangan Daun Pintu Panel, Kayu Merawan/Tembesu
a pintu (3) 1.96 5.88 m²
3 Pembuatan & Pemasangan Pintu & Jendela Kaca Kayu Merawan/Tembesu
a jendela (12) 0.58 6.96 m²
b pintu jendela (6) 1.25 7.50 m²

VIII PEKERJAAN PENUTUP LANGIT-LANGIT


1 Pasang trangka plafon hollow galvanis 261.91 261.91 m²
2 Memasang Langit-langit Gypsu Board, Uk (120x240) tebal 9 mm 261.91 261.91 m²
3 List Langit-Langit Kayu Profil 249.66 249.66 m'

IX PEKERJAAN PENUTUP LANTAI dan DINDING


1 Pemasangan Roman Granit (50x50) 261.91 261.91 m²
2 Pemasangan Border Roman Granit 10x50 96.00 96.00 m²
3 Pemasangan granit 60z120 cm 296.08 296.08 m²

X PEKERJAAN PENGECATAN
1 Pengecat Tembok Eksterior 467.86 467.86 m²
2 Pengecat Tembok Interior 467.86 467.86 m²
3 Pengecatan Bidang Kayu (Finish Duco) 57.03 57.03 m²
5 Anti Rayap 246.28 246.28 m²
6 Cat Plafon 261.91 261.91 m²

XI PEKERJAAN PENGGANTUNG dan PENGUNCI


1 Pemasangan Kunci Tanam Biasa 15.00 15.00 Bh
2 Pemasangan Engsel Pintu 30.00 30.00 Bh
3 Pemasangan Engsel Jendela Kupu-kupu 24.00 24.00 Bh
4 Pemasangan Kait Angin 24.00 24.00 Bh
5 Pasang Handle pintu 15.00 15.00 Bh
6 Pemasangan Grendel Pintu 15.00 15.00 Bh
7 Pemasangan Grendel Jendela 12.00 12.00 Bh
8 Pemasangan Handle Jendela 12.00 12.00 Bh
9 Pemasangan kaca t = 5 mm 45.00 45.00 m²

XII PEKERJAAN ELEKTRIKAL


1 Titik Lampu 57.00 57.00 Ttk
2 Pemasangan lampu downlight 38.00 38.00 Ttk
3 Pemasangan lampu sorot 12.00 12.00 Ttk
4 Pemasangan lampu baret 6.00 6.00 Ttk
5 Pemasangan lampu gantung besar 1.00 1.00 Ttk
6 Pasang stop kontak 4.00 4.00 Ttk
7 Pasang saklar tunggal 1.00 1.00 Ttk
8 Pasang saklar ganda 19.00 19.00 Ttk
9 Pasang saklar panel box + MCB 1.00 1.00 Bh

XIII PEKERJAAN INSTALASI AIR dan SANITASI


1 Pemasangan Bak Kontrol Pas.Batu Bata 60x60 tinggi 60 cm 9.00 9.00 Unit
2 Pemasangan Pipa PVC tipe AW Ø 3" 7.50 67.50 m'

XIV PEKERJAAN LANSCAPE


1 Taman pohon kecil 35.00 35.00 Unit
RENCANA ANGGARAN BIAYA
( RAB )
KABUPATEN : PALEMBANG
LOKASI : KOMPLEK RUMAH DINAS SEMEN BATURAJA
NAMA KEGIATAN : PEMBANGUNAN MASJID
TAHUN ANGGARAN : 2017

HARGA SATUAN
NO URAIAN PEKERJAAN SAT VOLUME KODE ANALISA
Rp
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Membersihkan Lapangan dan Perataan m² 400.00 A.2.2.1.9 20,145.00
2 Pemasangan pagar sementara seng gelombang tinggi 2 m m' 20.00 A.2.2.1.2 335,827.82
3 Pemasangan bowplank m' 274.00 A.2.2.1.4 65,720.10
4 Mobilisasi - Demobilisasi Ls 1.00 Taksir 500,000.00
JUMLAH SUB I PEKERJAAN PERSIAPAN
II PEKERJAAN TANAH
1 Galian tanah
a galian tanah pondasi batukali m³ 264.60 A.2.3.1.1 88,875.00
b galian tanah pondasi telapak m³ 100.56 A.2.3.1.2 109,316.25
c galian saluran air hujan (9 titik) m³ 3.24 A.2.3.1.1 88,875.00
2 Urugan tanah kembali m³ 445.33 A.2.3.1.9 21,725.00
3 Urugan pasir m³ 24.63 A.2.3.1.11 170,640.00
4 Urugan sirtu peninggian lantai m³ 40.00 A.2.3.1.14 368,179.50
JUMLAH SUB II PEKERJAAN TANAH
III PEKERJAAN PONDASI
1 Pemasangan Pondasi Batu Kali 1SP : 8 PP m³ 95.20 A.3.2.1.5 1,019,769.53
JUMLAH SUB III PEKERJAAN PONDASI
IV PEKERJAAN PASANGAN DINDING
1 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1 Bata Camp. 1SP : 6PB m² 14.17 A.4.4.1.5 240,602.40
2 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 6PB m² 466.06 A.4.4.1.11 115,305.00
3 Pemasangan Dinding Terawang (Rooster) Uk, (12x11x24)cm Camp. 1SP : 4PB m² 115.01 A.4.4.1.23 804,692.03
JUMLAH SUB IV PEKERJAAN PASANGAN DINDING
V HARGA SATUAN PEKERJAAN PLESTERAN
1 Pemasangan Plesteran 1 Pc : 8 PB Tebal 15 mm m² 960.44 A,4,4,2.8 67,996.53
2 Pemasangan Acian m² 935.72 A,4,4,2.27 43,969.43
3 Pemasangan skoneng m² 792.00 A,4,4,2.20 70,501.58
JUMLAH SUB V PEKERJAAN PLESTERAN
VI PEKERJAAN BETON
1 Memasang pondasi telapak
a Memasang bekisting untuk pondasi m² 8.16 A.4.1.1.20 184,409.70
b Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 m³ 3.47 A.4.1.1.8 1,101,991.60
c Pembesian dg Besi Polos kg 114.16 A.4.1.1.17.a 17,748.34
2 Memasang pondasi telapak
a Memasang bekisting untuk pondasi m² 18.72 A.4.1.1.20 184,409.70
b Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 m³ 5.62 A.4.1.1.8 1,101,991.60
c Pembesian dg Besi Polos kg 184.86 A.4.1.1.17.a 17,748.34
3 Memasang pondasi telapak
a Memasang bekisting untuk pondasi m² 24.00 A.4.1.1.20 184,409.70
b Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 m³ 6.00 A.4.1.1.8 1,101,991.60
c Pembesian dg Besi Polos kg 197.50 A.4.1.1.17.a 17,748.34
4 Memasang sloof beton bertulang 20/40
a Memasang bekisting untuk sloof m² 224.00 A.4.1.1.21 193,889.70
b Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 m³ 22.40 A.4.1.1.8 1,101,991.60
c Pembesian dg Besi kg 1,088.18 A.4.1.1.17.a 17,748.34
5 Memasang kolombeton bertulang 40/40
a Memasang bekisting untuk kolom m² 184.96 A.4.1.1.22 307,406.78
b Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 m³ 18.50 A.4.1.1.8 1,101,991.60
c Pembesian dg Besi kg 1,436.52 A.4.1.1.17.a 17,748.34
6 Memasang kolom beton bertulang 30/30
a Memasang bekisting untuk kolom m² 114.24 A.4.1.1.22 307,406.78
b Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 m³ 8.57 A.4.1.1.8 1,101,991.60
c Pembesian dg Besi kg 1,085.28 A.4.1.1.17.a 17,748.34
7 Memasang kolom beton bertulang 15/40
a Memasang bekisting untuk kolom m² 24.48 A.4.1.1.22 307,406.78
b Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 m³ 2.45 A.4.1.1.8 1,101,991.60
c Pembesian dg Besi kg 369.78 A.4.1.1.17.a 17,748.34
8 Memasang ringbalk beton bertulang 15/30
a Memasang bekisting untuk ringbalk m² 210.00 A.4.1.1.23 312,383.78
b Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 m³ 12.60 A.4.1.1.8 1,101,991.60
c Pembesian dg Besi Polos kg 2,102.80 A.4.1.1.17.a 17,748.34
9 Memasang kubah
a Memasang bekisting untuk kubah m² 398.20 A.4.1.1.24 359,546.78
b Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 m³ 39.82 A.4.1.1.8 1,101,991.60
c Pembesian dg Besi Polos kg 3,932.19 A.4.1.1.17.a 17,748.34
10 Memasang dag lantai bawah
a Memasang bekisting untuk pelat m² 409.60 A.4.1.1.24 359,546.78
b Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 m³ 48.00 A.4.1.1.2 940,248.41
c Pembesian dg Besi Polos kg 4,044.80 A.4.1.1.17.a 17,748.34
11 Memasang dag lantai atas
a Memasang bekisting untuk dag m² 269.11 A.4.1.1.24 359,546.78
b Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 m³ 31.43 A.4.1.1.8 1,101,991.60
c Pembesian dg Besi Polos kg 2,657.46 A.4.1.1.17.a 17,748.34
JUMLAH SUB VI PEKERJAAN BETON
VII PEKERJAAN KAYU
1 Pembuatan & Pemasangan Kosen Pintu & Jendela Kayu Merawan/Tembesu
a jendela (12) m³ 0.79 A.4.6.1.1 11,508,601.50
b pintu jendela (6) m³ 2.52 A.4.6.1.1 11,508,601.50
c pintu (3) m³ 0.10 A.4.6.1.1 11,508,601.50
2 Pembuatan & Pemasangan Daun Pintu Panel, Kayu Merawan/Tembesu
a pintu (3) m² 5.88 A.4.6.1.5 818,799.45
3 Pembuatan & Pemasangan Pintu & Jendela Kaca Kayu Merawan/Tembesu
a jendela (12) m² 6.96 A.4.6.1.6 608,876.70
b pintu jendela (6) m² 7.50 A.4.6.1.6 608,876.70
JUMLAH SUB VII PEKERJAAN KAYU
VIII PEKERJAAN PENUTUP LANGIT-LANGIT
1 Pasang trangka plafon hollow galvanis m² 261.91 A.4.2.1.20 104,342.14
2 Memasang Langit-langit Gypsu Board, Uk (120x240) tebal 9 mm m² 261.91 A.4.5.1.7 51,553.43
3 List Langit-Langit Kayu Profil m' 249.66 A.4.5.1.9 34,862.70
JUMLAH SUB VIII PEKERJAAN PENUTUP LANGIT-LANGIT
IX PEKERJAAN PENUTUP LANTAI dan DINDING
1 Pemasangan Roman Granit (50x50) m² 261.91 A.4.4.3.69 247,034.99
2 Pemasangan Border Roman Granit 10x50 m² 96.00 A.4.4.3.68 61,423.29
3 Pemasangan granit 60z120 cm m² 296.08 A.4.4.3.58 413,855.33
JUMLAH SUB IX PEKERJAAN PENUTUP LANTAI DAN DINDING
X PEKERJAAN PENGECATAN
1 Pengecat Tembok Eksterior m² 467.86 A.4.7.1.10a 50,737.32
2 Pengecat Tembok Interior m² 467.86 A.4.7.1.10b 24,739.84
3 Pengecatan Bidang Kayu (Finish Duco) m² 57.03 A.4.7.1.4 49,470.20
4 Anti Rayap m² 246.28 A.4.7.1.16 35,757.38
5 Cat Plafon m² 261.91 A.4.7.1.10b 24,739.84
JUMLAH SUB X PEKERJAAN PENGECATAN
XI PEKERJAAN PENGGANTUNG DAN PENGUNCI
1 Pemasangan Kunci Tanam Biasa Bh 15.00 A.4.6.2.2 263,010.75
2 Pemasangan Engsel Pintu Bh 30.00 A.4.6.2.5 107,835.00
3 Pemasangan Engsel Jendela Kupu-kupu Bh 24.00 A.4.6.2.6 57,205.88
4 Pemasangan Kait Angin Bh 24.00 A.4.6.2.9 76,432.50
5 Pasang Handle pintu Bh 15.00 A.4.6.2.10 376,178.25
6 Pemasangan Grendel Pintu Bh 15.00 A.4.6.2.11 67,011.75
7 Pemasangan Grendel Jendela Bh 12.00 A.4.6.2.11 67,011.75
8 Pemasangan Handle Jendela Bh 12.00 A.4.6.2.13 65,708.25
9 Pemasangan kaca t = 5 mm m² 45.00 A.4.6.2.17a 149,096.70
JUMLAH SUB XI PEKERJAAN PENGGANTUNG DAN PENGUNCI
XII PEKERJAAN ELEKTRIKAL
1 Titik Lampu Ttk 57.00 Taksir 175,000.00
2 Pemasangan lampu downlight Ttk 38.00 Taksir 105,198.38
3 Pemasangan lampu sorot Ttk 12.00 Taksir 359,973.38
4 Pemasangan lampu baret Ttk 6.00 Taksir 211,848.38
5 Pemasangan lampu gantung besar Ttk 1.00 Taksir 100,729,473.38
6 Pasang stop kontak Ttk 4.00 Taksir 178,342.50
7 Pasang saklar tunggal Ttk 1.00 Taksir 104,398.50
8 Pasang saklar ganda Ttk 19.00 Taksir 106,057.50
9 Pasang saklar panel box + MCB Bh 1.00 Taksir 1,079,090.63
JUMLAH SUB XII PEKERJAAN ELEKTRIKAL
XIII PEKERJAAN SANITASI
1 Pemasangan Bak Kontrol Pas.Batu Bata 60x60 tinggi 60 cm Unit 9.00 A.5.1.1.17 895,359.93
2 Pemasangan Pipa PVC tipe AW Ø 3" m' 67.50 A.5.1.1.31 76,875.89
JUMLAH SUB XIII PEKERJAAN SANITASI

XIV PEKERJAAN LANSCAPE


1 Taman pohon kecil Unit 35.00 Dihitung 1.2 32,581
JUMLAH SUB XIV PEKERJAAN LANSCAPE
RENCANA ANGGARAN BIAYA
( RAB )

HARGA

Rp
7

8,058,000.00
6,716,556.30
18,007,307.40
500,000.00
33,281,863.70

23,516,325.00
10,992,842.10
287,955.00
9,674,837.70
4,202,521.92
14,727,180.00
63,401,661.72

97,082,058.78
97,082,058.78

3,408,373.60
53,738,620.91
92,549,631.24
149,696,625.76

65,306,899.82
41,143,270.98
55,837,247.40
162,287,418.19

1,504,783.15
3,821,706.86
2,026,061.47

3,452,149.58
6,188,784.81
3,280,957.67

4,425,832.80
6,611,949.58
3,505,296.66

43,431,292.80
24,684,611.76
19,313,409.57

56,857,957.10
20,382,436.57
25,495,889.11

35,118,149.98
9,441,864.00
19,261,915.72

7,525,317.85
2,697,675.43
6,563,051.23

65,600,592.75
13,885,094.12
37,321,204.10

143,170,400.01
43,880,960.32
69,789,907.64

147,270,359.04
45,131,923.54
71,788,475.52
96,757,632.62
34,634,714.28
47,165,519.16
1,121,987,876.79

9,114,812.39
28,975,178.57
1,118,636.07

4,814,540.77

4,237,781.83
4,566,575.25
52,827,524.87

27,328,250.03
13,502,357.54
8,703,821.68
49,534,429.25

64,700,935.47
5,896,635.84
122,534,284.63
193,131,855.94

23,738,076.18
11,574,836.81
2,821,439.00
8,806,326.32
6,479,610.84
53,420,289.14

3,945,161.25
3,235,050.00
1,372,941.00
1,834,380.00
5,642,673.75
1,005,176.25
804,141.00
788,499.00
6,709,351.50
25,337,373.75

9,975,000.00
3,997,538.25
4,319,680.50
1,271,090.25
100,729,473.38
713,370.00
104,398.50
2,015,092.50
1,079,090.63
124,204,734.00

8,058,239.37
5,189,122.41
13,247,361.78

1,140,321.88
1,140,321.88
RENCANA ANGGARAN BIAYA
( RAB )
KABUPATEN : PALEMBANG
LOKASI : KOMPLEK RUMAH DINAS SEMEN BATURAJA
NAMA KEGIATAN : PEMBANGUNAN TOILET BIND MASJID (TOILET PRIA)
TAHUN ANGGARAN : 2017

UKURAN
NO URAIAN PEKERJAAN VOLUME SATUAN
P L T
1 2 3 4 5 6 7
I PEKERJAAN PERSIAPAN
1 Membersihkan Lapangan dan Perataan 6.00 3.00 18.00 m²
2 Pemasangan bowplank 54.47 54.47 m'

II PEKERJAAN TANAH
1 Galian tanah
a galian tanah pondasi batukali 24.00 0.70 1.35 22.68 m³
b galian tanah pondasi telapak 1.00 1.00 1.35 2.70 m³
c galian saluran air hujan (2 titik) 0.60 0.60 1.00 0.72 m³
2 Urugan tanah kembali 15.34 m³
Urug tanah peninggian 18.00 0.50 9.00 m³
3 Urugan pasir
a pasir bawah pondasi 24.00 0.70 0.10 1.68 m³
b pasir bawah pondasi telapak 1.00 1.00 0.10 0.20 m³
4 Urugan sirtu peninggian lantai 18.00 0.10 1.8 m³

III PEKERJAAN PONDASI


1 Pemasangan Pondasi Batu Kali 1SP : 5 PP 24.00 0.43 0.80 8.16 m³

IV PEKERJAAN PASANGAN DINDING


1 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 4PB
a dinding KM 19.40 2.80 54.32 m²
1.60 0.40 0.64 m²
54.96 m²
2 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 6PB 19.40 2.50 48.50 m²
3 Pemasangan Dinding Terawang (Rooster) Uk, (12x11x24)cm Camp. 1SP : 4PB 3.14 12.56 m²

V HARGA SATUAN PEKERJAAN PLESTERAN


1 Pemasangan Plesteran 1 Pc : 5 PB Tebal 15 mm 71.92 71.92 m²
3 Pemasangan Acian 71.92 71.92 m²

VI PEKERJAAN B E T O N
1 Memasang pondasi telapak
a Memasang bekisting untuk pondasi 1.00 1.00 0.30 2.40 m²
b Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 1.00 1.00 0.30 0.60 m³
c Pembesian dg Besi Polos 19.75 kg
2 Memasang sloof beton bertulang 15/30
a Memasang bekisting untuk sloof 24.00 0.15 0.30 14.40 m²
b Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 24.00 0.15 0.30 1.08 m³
c Pembesian dg Besi 110.11 kg
3 Memasang kolom beton bertulang 15/40
a Memasang bekisting untuk kolom 15/40 13.60 0.15 0.40 8.16 m²
b Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 13.60 0.15 0.40 0.82 m³
c Pembesian dg Besi 123.26 kg
4 Memasang kolom praktis beton bertulang 15/15
a Memasang bekisting untuk kolom 31.80 0.15 0.15 19.08 m²
b Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 31.80 0.15 0.15 0.72 m³
c Pembesian dg Besi 181.26 kg
5 Memasang ringbalk beton bertulang 15/30
a Memasang bekisting untuk ringbalk 24.00 0.15 0.30 18.00 m²
b Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 24.00 0.15 0.30 1.08 m³
c Pembesian dg Besi Polos 180.24 kg
6 Memasang dag untuk kubah
a Memasang bekisting untuk kubah 84.82 0.10 84.82 m²
b Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 84.82 0.10 8.48 m³
c Pembesian dg Besi Polos 837.63 kg
7 Memasang dag lantai 1
a Memasang bekisting untuk pelat 6.00 3.00 0.12 19.08 m²
b Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 6.00 3.00 0.12 2.16 m³
c Pembesian dg Besi Polos 188.42 kg
8 Memasang dag bawah kubah
a Memasang bekisting untuk dag 3.25 3.25 0.12 11.34 m²
b Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 3.25 3.25 0.12 1.27 m³
c Pembesian dg Besi Polos 112.01 kg

VII PEKERJAAN BESI & ALLUMUNIUM


1 Pintu KM 2.00 2.00 Unit

VIII PEKERJAAN PENUTUP LANGIT-LANGIT


1 Pasang trangka plafon hollow galvanis 18.00 18.00 m²
2 Memasang Langit-langit Gypsu Board, Uk (120x240) tebal 9 mm 18.00 18.00 m²
3 List Langit-Langit Kayu Profil 30.00 30.00 m'

IX PEKERJAAN PENUTUP LANTAI dan DINDING


1 Pemasangan Roman (20x20) 18.00 18.00 m²
2 Pemasangan Border Romans 10x20 cm 30.00 30.00 m²
3 Pemasangan Dinding Keramik 20x25 67.50 67.50 m²

X PEKERJAAN PENGECATAN
1 Pengecat Tembok Eksterior 35.96 35.96 m²
2 Pengecat Tembok Interior 35.96 35.96 m²
3 Pengecatan Bidang Beton 84.82 84.82 m²
4 Anti Rayap 0.60 0.60 m²
5 Cat Plafon 18.00 18.00 m²

XI PEKERJAAN PENGGANTUNG dan PENGUNCI


1 Pemasangan Kunci Kamar Mandi 2.00 2.00 Bh
2 Pemasangan Engsel Pintu 4.00 4.00 Bh
3 Pasang Handle pintu 2.00 2.00 Bh
4 Pemasangan Grendel Pintu 22.00 2.00 Bh

XII PEKERJAAN ELEKTRIKAL


1 Titik Lampu 9.00 9.00 Ttk
2 Pemasangan lampu downlight 8.00 8.00 Ttk
3 Pemasangan lampu baret 1.00 1.00 Ttk
4 Pasang saklar tunggal 1.00 1.00 Ttk
5 Pasang saklar ganda 4.00 4.00 Ttk

XIII PEKERJAAN INSTALASI AIR dan SANITASI


1 Memasang Closet Jongkok / Toto 2.00 2.00 Unit
2 Pemasangan Floor Drain 4.00 4.00 Unit
3 Pemasangan bak mandi fiberglass 2.00 2.00 Unit
4 Pemasangan kran air 12.00 12.00 Unit
5 Pemasangan septictank 1.00 1.00 Ls
6 Pemasangan sumur resapan 1.00 1.00 Ls
7 Pemasangan Bak Kontrol Pas.Batu Bata 60x60 tinggi 60 cm 2.00 2.00 Unit
8 Pemasangan tandon air 500 L 1.00 1.00 Unit
9 Pemasangan pompa air 1.00 1.00 Unit
10 Pemasangan Urinoir 3.00 3.00 Unit
11 Pemasangan Pipa PVC tipe AW Ø ¾" 30.00 30.00 m'
12 Pemasangan Pipa PVC tipe AW Ø 3" 20.00 40.00 m'
13 Pemasangan Pipa PVC tipe AW Ø 4" 6.00 6.00 m'
RENCANA ANGGARAN BIAYA
( RAB )
KABUPATEN : PALEMBANG
LOKASI : KOMPLEK RUMAH DINAS SEMEN BATURAJA
NAMA KEGIATAN : PEMBANGUNAN TOILET BIND MASJID (TOILET PRIA)
TAHUN ANGGARAN : 2017

BOBOT
HARGA SATUAN HARGA
NO URAIAN PEKERJAAN SAT VOLUME KODE ANALISA PEK.
Rp Rp %
1 2 3 4 5 6 7 8
I PEKERJAAN PERSIAPAN
1 Membersihkan Lapangan dan Perataan m² 18.00 A.2.2.1.9 20,145.00 362,610.00 0.01
2 Pemasangan bowplank m' 54.47 A.2.2.1.4 65,720.10 3,579,773.85 0.14
JUMLAH SUB I PEKERJAAN PERSIAPAN 3,942,383.85 0.15
II PEKERJAAN TANAH
1 Galian tanah
a galian tanah pondasi batukali m³ 22.68 A.2.3.1.1 88,875.00 2,015,685.00 0.08
b galian tanah pondasi telapak m³ 2.70 A.2.3.1.2 109,316.25 295,153.88 0.01
c galian saluran air hujan (2 titik) m³ 0.72 A.2.3.1.1 88,875.00 63,990.00 0.00
2 Urugan tanah kembali m³ 24.34 A.2.3.1.9 21,725.00 528,786.50 0.02
3 Urugan pasir m³ 1.88 A.2.3.1.11 170,640.00 320,803.20 0.01
4 Urugan sirtu peninggian lantai m³ 1.80 A.2.3.1.14 368,179.50 662,723.10 0.03
JUMLAH SUB II PEKERJAAN TANAH 3,887,141.68 0.15
III PEKERJAAN PONDASI
1 Pemasangan Pondasi Batu Kali 1SP : 8 PP m³ 8.16 A.3.2.1.5 1,019,769.53 8,321,319.32 0.32
JUMLAH SUB III PEKERJAAN PONDASI 8,321,319.32 0.32
IV PEKERJAAN PASANGAN DINDING
1 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 4PB m² 54.96 A.4.4.1.9 119,679.08 6,577,561.96 0.25
2 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 6PB m² 48.50 A.4.4.1.11 115,305.00 5,592,292.65 0.22
3 Pemasangan Dinding Terawang (Rooster) Uk, (12x11x24)cm Camp. 1SP : 4PB m² 12.56 A.4.4.1.23 804,692.03 10,108,367.32 0.39
JUMLAH SUB IV PEKERJAAN PASANGAN DINDING 22,278,221.92 0.86
V HARGA SATUAN PEKERJAAN PLESTERAN
1 Pemasangan Plesteran 1 Pc : 8 PB Tebal 15 mm m² 71.92 A,4,4,2.8 67,996.53 4,890,310.61 0.19
2 Pemasangan Acian m² 71.92 A,4,4,2.27 43,969.43 3,162,281.05 0.12
JUMLAH SUB V PEKERJAAN PLESTERAN 8,052,591.66 0.31
VI PEKERJAAN BETON
1 Memasang pondasi telapak
a Memasang bekisting untuk pondasi m² 2.40 A.4.1.1.20 184,409.70 442,583.28 0.02
b Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 m³ 0.60 A.4.1.1.8 1,101,991.60 661,194.96 0.03
c Pembesian dg Besi Polos kg 19.75 A.4.1.1.17.a 17,748.34 350,529.67 0.01
2 Memasang sloof beton bertulang 15/30
a Memasang bekisting untuk sloof m² 14.40 A.4.1.1.21 193,889.70 2,792,011.68 0.11
b Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 m³ 1.08 A.4.1.1.8 1,101,991.60 1,190,150.92 0.05
c Pembesian dg Besi kg 110.11 A.4.1.1.17.a 17,748.34 1,954,352.27 0.08
3 Memasang kolom beton bertulang 15/40
a Memasang bekisting untuk kolom 15/40 m² 8.16 A.4.1.1.22 307,406.78 2,508,439.28 0.10
b Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 m³ 0.82 A.4.1.1.8 1,101,991.60 899,225.14 0.03
c Pembesian dg Besi kg 123.26 A.4.1.1.17.a 17,748.34 2,187,683.74 0.08
4 Memasang kolom praktis beton bertulang 15/15
a Memasang bekisting untuk kolom m² 19.08 A.4.1.1.22 307,406.78 5,865,321.27 0.23
b Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 m³ 0.72 A.4.1.1.8 1,101,991.60 788,474.99 0.03
c Pembesian dg Besi kg 181.26 A.4.1.1.17.a 17,748.34 3,217,063.66 0.12
5 Memasang ringbalk beton bertulang 15/30
a Memasang bekisting untuk ringbalk m² 18.00 A.4.1.1.23 312,383.78 5,622,907.95 0.22
b Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 m³ 1.08 A.4.1.1.8 1,101,991.60 1,190,150.92 0.05
c Pembesian dg Besi Polos kg 180.24 A.4.1.1.17.a 17,748.34 3,198,960.35 0.12
6 Memasang dag untuk kubah
a Memasang bekisting untuk kubah m² 84.82 A.4.1.1.24 359,546.78 30,497,836.69 1.17
b Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 m³ 8.48 A.4.1.1.8 1,101,991.60 9,347,423.50 0.36
c Pembesian dg Besi Polos kg 837.63 A.4.1.1.17.a 17,748.34 14,866,489.20 0.57
7 Memasang dag lantai 1
a Memasang bekisting untuk pelat m² 19.08 A.4.1.1.24 359,546.78 6,860,152.47 0.26
b Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 m³ 2.16 A.4.1.1.2 940,248.41 2,030,936.56 0.08
c Pembesian dg Besi Polos kg 188.42 A.4.1.1.17.a 17,748.34 3,344,053.01 0.13
8 Memasang dag bawah kubah
a Memasang bekisting untuk dag m² 11.34 A.4.1.1.24 359,546.78 4,078,159.30 0.16
b Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 m³ 1.27 A.4.1.1.8 1,101,991.60 1,396,774.35 0.05
c Pembesian dg Besi Polos kg 112.01 A.4.1.1.17.a 17,748.34 1,987,941.37 0.08
JUMLAH SUB VI PEKERJAAN BETON 107,278,816.52 4.13
VII PEKERJAAN BESI DAN ALUMUNIUM
1 Pintu KM Unit 2.00 A.4.2.1.8 455,040.00 910,080.00 0.04
JUMLAH SUB VII PEKERJAAN KAYU 910,080.00 0.04
VIII PEKERJAAN PENUTUP LANGIT-LANGIT
1 Pasang trangka plafon hollow galvanis m² 18.00 A.4.2.1.20 104,342.14 1,878,158.53 0.07
2 Memasang Langit-langit Gypsu Board, Uk (120x240) tebal 9 mm m² 18.00 A.4.5.1.7 51,553.43 927,961.65 0.04
3 List Langit-Langit Kayu Profil m' 30.00 A.4.5.1.9 34,862.70 1,045,881.00 0.04
JUMLAH SUB VIII PEKERJAAN PENUTUP LANGIT-LANGIT 3,852,001.18 0.15
IX PEKERJAAN PENUTUP LANTAI dan DINDING
1 Pemasangan Roman (20x20) m² 18.00 A.4.4.3.36 242,718.81 4,368,938.58 0.17
2 Pemasangan Border Romans 10x20 cm m² 30.00 A.4.4.3.39 32,768.33 983,049.93 0.04
3 Pemasangan Dinding Keramik 20x25 m² 67.50 A.4.4.3.54.a 274,667.60 18,540,062.66 0.71
JUMLAH SUB IX PEKERJAAN PENUTUP LANTAI DAN DINDING 23,892,051.17 0.92
X PEKERJAAN PENGECATAN
1 Pengecat Tembok Eksterior m² 35.96 A.4.7.1.10a 50,737.32 1,824,513.87 0.07
2 Pengecat Tembok Interior m² 35.96 A.4.7.1.10b 24,739.84 889,644.56 0.03
3 Pengecatan Bidang Beton m² 84.82 A.4.7.1.4 50,737.32 4,303,691.40 0.17
4 Anti Rayap m² 0.60 A.4.7.1.16 35,757.38 21,454.43 0.00
5 Cat Plafon m² 18.00 A.4.7.1.10b 24,739.84 445,317.08 0.02
JUMLAH SUB X PEKERJAAN PENGECATAN 7,484,621.32 0.29
XI PEKERJAAN PENGGANTUNG DAN PENGUNCI
1 Pemasangan Kunci Kamar Mandi Bh 2.00 A.4.6.2.3 150,702.38 301,404.75 0.01
2 Pemasangan Engsel Pintu Bh 4.00 A.4.6.2.5 107,835.00 431,340.00 0.02
3 Pasang Handle pintu Bh 2.00 A.4.6.2.10 376,178.25 752,356.50 0.03
4 Pemasangan Grendel Pintu Bh 2.00 A.4.6.2.11 67,011.75 134,023.50 0.01
JUMLAH SUB XI PEKERJAAN PENGGANTUNG DAN PENGUNCI 1,619,124.75 0.06
XII PEKERJAAN ELEKTRIKAL
1 Titik Lampu Ttk 9.00 Taksir 175,000.00 1,575,000.00 0.06
2 Pemasangan lampu downlight Ttk 8.00 Taksir 105,198.38 841,587.00 0.03
3 Pemasangan lampu baret Ttk 1.00 Taksir 211,848.38 211,848.38 0.01
4 Pasang saklar tunggal Ttk 1.00 Taksir 104,398.50 104,398.50 0.00
5 Pasang saklar ganda Ttk 4.00 Taksir 106,057.50 424,230.00 0.02
JUMLAH SUB XII PEKERJAAN ELEKTRIKAL 3,157,063.88 0.12
XIII PEKERJAAN SANITASI
1 Memasang Closet Jongkok / Toto Unit 2.00 A.5.1.1.2 771,482.40 1,542,964.80 0.06
2 Pemasangan Floor Drain Unit 4.00 A.5.1.1.14 164,655.75 658,623.00 0.03
3 Pemasangan bak mandi fiberglass Unit 2.00 A.5.1.1.7 1,615,925.25 3,231,850.50 0.12
4 Pemasangan kran air Unit 12.00 A.5.1.1.19a 295,005.75 3,540,069.00 0.14
5 Pemasangan septictank Ls 1.00 Taksir 5,708,400 5,708,400.00 0.22
6 Pemasangan sumur resapan Ls 1.00 Taksir 2,000,000.00 2,000,000.00 0.08
7 Pemasangan Bak Kontrol Pas.Batu Bata 60x60 tinggi 60 cm Unit 2.00 A.5.1.1.17 895,359.93 1,790,719.86 0.07
8 Pemasangan tandon air 500 L Unit 1.00 Taksir 800,000.00 800,000.00 0.03
9 Pemasangan pompa air Unit 1.00 Taksir 570,000.00 570,000.00 0.02
10 Pemasangan Urinoir Unit 3.00 A.5.1.1.4 3,443,005.65 10,329,016.95 0.40
11 Pemasangan Pipa PVC tipe AW Ø ¾" m' 30.00 A.5.1.1.26 21,842.51 655,275.38 0.03
12 Pemasangan Pipa PVC tipe AW Ø 3" m' 40.00 A.5.1.1.31 76,875.89 3,075,035.50 0.12
13 Pemasangan Pipa PVC tipe AW Ø 4" m' 6.00 A.5.1.1.32 108,100.64 648,603.83 0.02
JUMLAH SUB XIII PEKERJAAN SANITASI 34,550,558.81 1.33

8.82
RENCANA ANGGARAN BIAYA
( RAB )
KABUPATEN : PALEMBANG
LOKASI : KOMPLEK RUMAH DINAS SEMEN BATURAJA
NAMA KEGIATAN : PEMBANGUNAN TOILET BIND MASJID (TOILET WANITA)
TAHUN ANGGARAN : 2017

UKURAN
NO URAIAN PEKERJAAN VOLUME SATUAN
P L T
1 2 3 4 5 6 7
I PEKERJAAN PERSIAPAN
1 Membersihkan Lapangan dan Perataan 6.00 3.00 18.00 m²
2 Pemasangan bowplank 54.47 54.47 m'

II PEKERJAAN TANAH
1 Galian tanah
a galian tanah pondasi batukali 24.00 0.70 1.35 22.68 m³
b galian tanah pondasi telapak 1.00 1.00 1.35 2.70 m³
c galian saluran air hujan (2 titik) 0.60 0.60 1.00 0.72 m³
2 Urugan tanah kembali 15.34 m³
Urug tanah peninggian 18.00 0.50 9.00 m³
3 Urugan pasir
a pasir bawah pondasi 24.00 0.70 0.10 1.68 m³
b pasir bawah pondasi telapak 1.00 1.00 0.10 0.20 m³
4 Urugan sirtu peninggian lantai 18.00 0.10 1.8 m³

III PEKERJAAN PONDASI


1 Pemasangan Pondasi Batu Kali 1SP : 5 PP 24.00 0.43 0.80 8.16 m³

IV PEKERJAAN PASANGAN DINDING


1 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 4PB
a dinding KM 19.40 2.80 54.32 m²
1.60 0.40 0.64 m²
54.96 m²
2 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 6PB 19.40 2.50 48.50 m²
3 Pemasangan Dinding Terawang (Rooster) Uk, (12x11x24)cm Camp. 1SP : 4PB 3.14 12.56 m²

V HARGA SATUAN PEKERJAAN PLESTERAN


1 Pemasangan Plesteran 1 Pc : 5 PB Tebal 15 mm 71.92 71.92 m²
3 Pemasangan Acian 71.92 71.92 m²

VI PEKERJAAN B E T O N
1 Memasang pondasi telapak
a Memasang bekisting untuk pondasi 1.00 1.00 0.30 2.40 m²
b Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 1.00 1.00 0.30 0.60 m³
c Pembesian dg Besi Polos 19.75 kg
2 Memasang sloof beton bertulang 15/30
a Memasang bekisting untuk sloof 24.00 0.15 0.30 14.40 m²
b Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 24.00 0.15 0.30 1.08 m³
c Pembesian dg Besi 110.11 kg
3 Memasang kolom beton bertulang 15/40
a Memasang bekisting untuk kolom 15/40 13.60 0.15 0.40 8.16 m²
b Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 13.60 0.15 0.40 0.82 m³
c Pembesian dg Besi 123.26 kg
4 Memasang kolom praktis beton bertulang 15/15
a Memasang bekisting untuk kolom 31.80 0.15 0.15 19.08 m²
b Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 31.80 0.15 0.15 0.72 m³
c Pembesian dg Besi 181.26 kg
5 Memasang ringbalk beton bertulang 15/30
a Memasang bekisting untuk ringbalk 24.00 0.15 0.30 18.00 m²
b Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 24.00 0.15 0.30 1.08 m³
c Pembesian dg Besi Polos 180.24 kg
6 Memasang dag untuk kubah
a Memasang bekisting untuk kubah 84.82 0.10 84.82 m²
b Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 84.82 0.10 8.48 m³
c Pembesian dg Besi Polos 1489.11 kg
7 Memasang dag lantai 1
a Memasang bekisting untuk pelat 6.00 3.00 0.12 19.08 m²
b Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 6.00 3.00 0.12 2.16 m³
c Pembesian dg Besi Polos 188.42 kg
8 Memasang dag bawah kubah
a Memasang bekisting untuk dag 3.25 3.25 0.12 11.34 m²
b Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 3.25 3.25 0.12 1.27 m³
c Pembesian dg Besi Polos 112.01 kg

VII PEKERJAAN BESI & ALLUMUNIUM


1 Pintu KM 2.00 2.00 Unit

VIII PEKERJAAN PENUTUP LANGIT-LANGIT


1 Pasang trangka plafon hollow galvanis 18.00 18.00 m²
2 Memasang Langit-langit Gypsu Board, Uk (120x240) tebal 9 mm 18.00 18.00 m²
3 List Langit-Langit Kayu Profil 30.00 30.00 m'

IX PEKERJAAN PENUTUP LANTAI dan DINDING


1 Pemasangan Roman (20x20) 18.00 18.00 m²
2 Pemasangan Border Romans 10x20 cm 30.00 30.00 m²
3 Pemasangan Dinding Keramik 20x25 67.50 67.50 m²

X PEKERJAAN PENGECATAN
1 Pengecat Tembok Eksterior 35.96 35.96 m²
2 Pengecat Tembok Interior 35.96 35.96 m²
3 Pengecatan Bidang Beton 84.82 84.82 m²
4 Anti Rayap 0.60 0.60 m²
5 Cat Plafon 18.00 18.00 m²

XI PEKERJAAN PENGGANTUNG dan PENGUNCI


1 Pemasangan Kunci Kamar Mandi 2.00 2.00 Bh
2 Pemasangan Engsel Pintu 4.00 4.00 Bh
3 Pasang Handle pintu 2.00 2.00 Bh
4 Pemasangan Grendel Pintu 22.00 2.00 Bh

XII PEKERJAAN ELEKTRIKAL


1 Titik Lampu 9.00 9.00 Ttk
2 Pemasangan lampu downlight 8.00 8.00 Ttk
3 Pemasangan lampu baret 1.00 1.00 Ttk
4 Pasang saklar tunggal 1.00 1.00 Ttk
5 Pasang saklar ganda 4.00 4.00 Ttk

XIII PEKERJAAN INSTALASI AIR dan SANITASI


1 Memasang Closet Jongkok / Toto 2.00 2.00 Unit
2 Memasang Wastafel 1.00 1.00 Unit
3 Pemasangan Floor Drain 4.00 4.00 Unit
4 Pemasangan bak mandi fiberglass 2.00 2.00 Unit
5 Pemasangan kran air 12.00 12.00 Unit
6 Pemasangan Bak Kontrol Pas.Batu Bata 60x60 tinggi 60 cm 2.00 2.00 Unit
7 Pemasangan tandon air 500 L 1.00 1.00 Unit
8 Pemasangan Pipa PVC tipe AW Ø ¾" 50.00 50.00 m'
9 Pemasangan Pipa PVC tipe AW Ø 3" 40.00 80.00 m'
10 Pemasangan Pipa PVC tipe AW Ø 4" 26.00 26.00 m'
RENCANA ANGGARAN BIAYA
( RAB )
KABUPATEN : PALEMBANG
LOKASI : KOMPLEK RUMAH DINAS SEMEN BATURAJA
NAMA KEGIATAN : PEMBANGUNAN TOILET BIND MASJID (TOILET WANITA)
TAHUN ANGGARAN : 2017

NO URAIAN PEKERJAAN

1 2
I PEKERJAAN PERSIAPAN
1 Membersihkan Lapangan dan Perataan
2 Pemasangan bowplank

II PEKERJAAN TANAH
1 Galian tanah
a galian tanah pondasi batukali
b galian tanah pondasi telapak
c galian saluran air hujan (2 titik)
2 Urugan tanah kembali
3 Urugan pasir
4 Urugan sirtu peninggian lantai

III PEKERJAAN PONDASI


1 Pemasangan Pondasi Batu Kali 1SP : 8 PP

IV PEKERJAAN PASANGAN DINDING


1 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 4PB
2 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 6PB
3 Pemasangan Dinding Terawang (Rooster) Uk, (12x11x24)cm Camp. 1SP : 4PB

V HARGA SATUAN PEKERJAAN PLESTERAN


1 Pemasangan Plesteran 1 Pc : 8 PB Tebal 15 mm
2 Pemasangan Acian

VI PEKERJAAN BETON
1 Memasang pondasi telapak
a Memasang bekisting untuk pondasi
b Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56
c Pembesian dg Besi Polos
2 Memasang sloof beton bertulang 15/30
a Memasang bekisting untuk sloof
b Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56
c Pembesian dg Besi
3 Memasang kolom beton bertulang 15/40
a Memasang bekisting untuk kolom 15/40
b Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56
c Pembesian dg Besi
4 Memasang kolom praktis beton bertulang 15/15
a Memasang bekisting untuk kolom
b Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56
c Pembesian dg Besi
5 Memasang ringbalk beton bertulang 15/30
a Memasang bekisting untuk ringbalk
b Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56
c Pembesian dg Besi Polos
6 Memasang dag untuk kubah
a Memasang bekisting untuk kubah
b Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56
c Pembesian dg Besi Polos
7 Memasang dag lantai 1
a Memasang bekisting untuk pelat
b Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56
c Pembesian dg Besi Polos
8 Memasang dag bawah kubah
a Memasang bekisting untuk dag
b Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56
c Pembesian dg Besi Polos

VII PEKERJAAN BESI DAN ALUMUNIUM


1 Pintu KM

VIII PEKERJAAN PENUTUP LANGIT-LANGIT


1 Pasang trangka plafon hollow galvanis
2 Memasang Langit-langit Gypsu Board, Uk (120x240) tebal 9 mm
3 List Langit-Langit Kayu Profil
JUMLAH SUB VIII
IX PEKERJAAN PENUTUP LANTAI dan DINDING
1 Pemasangan Roman (20x20)
2 Pemasangan Border Romans 10x20 cm
3 Pemasangan Dinding Keramik 20x25
JUMLAH SUB IX PEKER
X PEKERJAAN PENGECATAN
1 Pengecat Tembok Eksterior
2 Pengecat Tembok Interior
3 Pengecatan Bidang Beton
4 Anti Rayap
5 Cat Plafon

XI PEKERJAAN PENGGANTUNG DAN PENGUNCI


1 Pemasangan Kunci Kamar Mandi
2 Pemasangan Engsel Pintu
3 Pasang Handle pintu
4 Pemasangan Grendel Pintu
JUMLAH SUB XI PEKE
XII PEKERJAAN ELEKTRIKAL
1 Titik Lampu
2 Pemasangan lampu downlight
3 Pemasangan lampu baret
4 Pasang saklar tunggal
5 Pasang saklar ganda

XIII PEKERJAAN SANITASI


1 Memasang Closet Jongkok / Toto
2 Memasang Wastafel
3 Pemasangan Floor Drain
4 Pemasangan bak mandi fiberglass
5 Pemasangan kran air
6 Pemasangan Bak Kontrol Pas.Batu Bata 60x60 tinggi 60 cm
7 Pemasangan tandon air 500 L
8 Pemasangan Pipa PVC tipe AW Ø ¾"
9 Pemasangan Pipa PVC tipe AW Ø 3"
10 Pemasangan Pipa PVC tipe AW Ø 4"
ANGGARAN BIAYA
RAB )

BOBOT
HARGA SATUAN HARGA
SAT VOLUME KODE ANALISA PEK.
Rp Rp %
3 4 5 6 7 8

m² 18.00 A.2.2.1.9 20,145.00 362,610.00 0.01


m' 54.47 A.2.2.1.4 65,720.10 3,579,773.85 0.14
JUMLAH SUB I PEKERJAAN PERSIAPAN 3,942,383.85 0.15

m³ 22.68 A.2.3.1.1 88,875.00 2,015,685.00 0.08


m³ 2.70 A.2.3.1.2 109,316.25 295,153.88 0.01
m³ 0.72 A.2.3.1.1 88,875.00 63,990.00 0.00
m³ 24.34 A.2.3.1.9 21,725.00 528,786.50 0.02
m³ 1.88 A.2.3.1.11 170,640.00 320,803.20 0.01
m³ 1.80 A.2.3.1.14 368,179.50 662,723.10 0.03
JUMLAH SUB II PEKERJAAN TANAH 3,887,141.68 0.15

m³ 8.16 A.3.2.1.5 1,019,769.53 8,321,319.32 0.32


JUMLAH SUB III PEKERJAAN PONDASI 8,321,319.32 0.32

m² 54.96 A.4.4.1.9 119,679.08 6,577,561.96 0.25


m² 48.50 A.4.4.1.11 115,305.00 5,592,292.65 0.22
m² 12.56 A.4.4.1.23 804,692.03 10,108,367.32 0.39
JUMLAH SUB IV PEKERJAAN PASANGAN DINDING 22,278,221.92 0.86

m² 71.92 A,4,4,2.8 67,996.53 4,890,310.61 0.19


m² 71.92 A,4,4,2.27 43,969.43 3,162,281.05 0.12
JUMLAH SUB V PEKERJAAN PLESTERAN 8,052,591.66 0.31

m² 2.40 A.4.1.1.20 184,409.70 442,583.28 0.02


m³ 0.60 A.4.1.1.8 1,101,991.60 661,194.96 0.03
kg 19.75 A.4.1.1.17.a 17,748.34 350,529.67 0.01
m² 14.40 A.4.1.1.21 193,889.70 2,792,011.68 0.11
m³ 1.08 A.4.1.1.8 1,101,991.60 1,190,150.92 0.05
kg 110.11 A.4.1.1.17.a 17,748.34 1,954,352.27 0.08

m² 8.16 A.4.1.1.22 307,406.78 2,508,439.28 0.10


m³ 0.82 A.4.1.1.8 1,101,991.60 899,225.14 0.03
kg 123.26 A.4.1.1.17.a 17,748.34 2,187,683.74 0.08

m² 19.08 A.4.1.1.22 307,406.78 5,865,321.27 0.23


m³ 0.72 A.4.1.1.8 1,101,991.60 788,474.99 0.03
kg 181.26 A.4.1.1.17.a 17,748.34 3,217,063.66 0.12

m² 18.00 A.4.1.1.23 312,383.78 5,622,907.95 0.22


m³ 1.08 A.4.1.1.8 1,101,991.60 1,190,150.92 0.05
kg 180.24 A.4.1.1.17.a 17,748.34 3,198,960.35 0.12

m² 84.82 A.4.1.1.24 359,546.78 30,497,836.69 1.17


m³ 8.48 A.4.1.1.8 1,101,991.60 9,347,423.50 0.36
kg 1,489.11 A.4.1.1.17.a 17,748.34 26,429,314.14 1.02

m² 19.08 A.4.1.1.24 359,546.78 6,860,152.47 0.26


m³ 2.16 A.4.1.1.2 940,248.41 2,030,936.56 0.08
kg 188.42 A.4.1.1.17.a 17,748.34 3,344,053.01 0.13

m² 11.34 A.4.1.1.24 359,546.78 4,078,159.30 0.16


m³ 1.27 A.4.1.1.8 1,101,991.60 1,396,774.35 0.05
kg 112.01 A.4.1.1.17.a 17,748.34 1,987,941.37 0.08
JUMLAH SUB VI PEKERJAAN BETON 118,841,641.45 4.57

Unit 2.00 A.4.2.1.8 455,040.00 910,080.00 0.04


JUMLAH SUB VII PEKERJAAN KAYU 910,080.00 0.04

m² 18.00 A.4.2.1.20 104,342.14 1,878,158.53 0.07


m² 18.00 A.4.5.1.7 51,553.43 927,961.65 0.04
m' 30.00 A.4.5.1.9 34,862.70 1,045,881.00 0.04
JUMLAH SUB VIII PEKERJAAN PENUTUP LANGIT-LANGIT 3,852,001.18 0.15

m² 18.00 A.4.4.3.36 242,718.81 4,368,938.58 0.17


m² 30.00 A.4.4.3.39 32,768.33 983,049.93 0.04
m² 67.50 A.4.4.3.54.a 274,667.60 18,540,062.66 0.71
JUMLAH SUB IX PEKERJAAN PENUTUP LANTAI DAN DINDING 23,892,051.17 0.92
m² 35.96 A.4.7.1.10a 50,737.32 1,824,513.87 0.07
m² 35.96 A.4.7.1.10b 24,739.84 889,644.56 0.03
m² 84.82 A.4.7.1.4 50,737.32 4,303,691.40 0.17
m² 0.60 A.4.7.1.16 35,757.38 21,454.43 0.00
m² 18.00 A.4.7.1.10b 24,739.84 445,317.08 0.02
JUMLAH SUB X PEKERJAAN PENGECATAN 7,484,621.32 0.29

Bh 2.00 A.4.6.2.3 150,702.38 301,404.75 0.01


Bh 4.00 A.4.6.2.5 107,835.00 431,340.00 0.02
Bh 2.00 A.4.6.2.10 376,178.25 752,356.50 0.03
Bh 2.00 A.4.6.2.11 67,011.75 134,023.50 0.01
JUMLAH SUB XI PEKERJAAN PENGGANTUNG DAN PENGUNCI 1,619,124.75 0.06

Ttk 9.00 Taksir 175,000.00 1,575,000.00 0.06


Ttk 8.00 Taksir 105,198.38 841,587.00 0.03
Ttk 1.00 Taksir 211,848.38 211,848.38 0.01
Ttk 1.00 Taksir 104,398.50 104,398.50 0.00
Ttk 4.00 Taksir 106,057.50 424,230.00 0.02
JUMLAH SUB XII PEKERJAAN ELEKTRIKAL 3,157,063.88 0.12

Unit 2.00 A.5.1.1.2 771,482.40 1,542,964.80 0.06


Unit 1.00 A.5.1.1.5 863,521.35 863,521.35 0.03
Unit 4.00 A.5.1.1.14 164,655.75 658,623.00 0.03
Unit 2.00 A.5.1.1.7 1,615,925.25 3,231,850.50 0.12
Unit 12.00 A.5.1.1.19a 295,005.75 3,540,069.00 0.14
Unit 2.00 A.5.1.1.17 895,359.93 1,790,719.86 0.07
Unit 1.00 Taksir 800,000.00 800,000.00 0.03
m' 50.00 A.5.1.1.26 21,842.51 1,092,125.63 0.04
m' 80.00 A.5.1.1.31 76,875.89 6,150,071.00 0.24
m' 26.00 A.5.1.1.32 108,100.64 2,810,616.58 0.11
JUMLAH SUB XIII PEKERJAAN SANITASI 22,480,561.71 0.87

8.80
REKAPITULASI
RENCANA ANGGARAN BIAYA (RAB)

KABUPATEN : PALEMBANG
LOKASI : KOMPLEK RUMAH DINAS SEMEN BATURAJA
NAMA KEGIATAN : PEMBANGUNAN MASJID
TAHUN ANGGARAN : 2017

No JENIS PEKERJAAN JUMLAH HARGA

A. PEMBUATAN MASJID
I PEKERJAAN PERSIAPAN 33,281,864
II PEKERJAAN TANAH 63,401,662
III PEKERJAAN PONDASI 97,082,059
IV PEKERJAAN PASANGAN DINDING 149,696,626
V HARGA SATUAN PEKERJAAN PLESTERAN 162,287,418
VI PEKERJAAN B E T O N 1,121,987,877
VII PEKERJAAN KAYU 52,827,525
VIII PEKERJAAN PENUTUP LANGIT-LANGIT 49,534,429
IX PEKERJAAN PENUTUP LANTAI dan DINDING 193,131,856
X PEKERJAAN PENGECATAN 53,420,289
XI PEKERJAAN PENGGANTUNG DAN PENGUNCI 25,337,374
XII PEKERJAAN ELEKTRIKAL 124,204,734
XIII PEKERJAAN SANITASI 13,247,362
XIV PEKERJAAN LANSCAPE 1,140,322

B. PEMBUATAN TOILET PRIA


I PEKERJAAN PERSIAPAN 3,942,384
II PEKERJAAN TANAH 3,887,142
III PEKERJAAN PONDASI 8,321,319
IV PEKERJAAN PASANGAN DINDING 22,278,222
V HARGA SATUAN PEKERJAAN PLESTERAN 8,052,592
VI PEKERJAAN B E T O N 107,278,817
VII PEKERJAAN BESI DAN ALUMUNIUM 910,080
VIII PEKERJAAN LANGIT_LANGIT 3,852,001
IX PEKERJAAN PENUTUP LANTAI dan DINDING 23,892,051
X PEKERJAAN PENGECATAN 7,484,621
XI PEKERJAAN PENGGANTUNG PENGUNCI 1,619,125
XII PEKERJAAN ELEKTRIKAL 3,157,064
XIII PEKERJAAN SANITASI 34,550,559

C. PEMBUATAN TOILET WANITA


I PEKERJAAN PERSIAPAN 3,942,384
II PEKERJAAN TANAH 3,887,142
III PEKERJAAN PONDASI 8,321,319
IV PEKERJAAN PASANGAN DINDING 22,278,222
V HARGA SATUAN PEKERJAAN PLESTERAN 8,052,592
VI PEKERJAAN B E T O N 118,841,641
VII PEKERJAAN BESI DAN ALUMUNIUM 910,080
VIII PEKERJAAN LANGIT_LANGIT 3,852,001
IX PEKERJAAN PENUTUP LANTAI dan DINDING 23,892,051
X PEKERJAAN PENGECATAN 7,484,621
XI PEKERJAAN PENGGANTUNG PENGUNCI 1,619,125
XII PEKERJAAN ELEKTRIKAL 3,157,064
XIII PEKERJAAN SANITASI 22,480,562

JUMLAH 2,598,526,175
PPN 10% 259,852,617.55
TOTAL 2,858,378,793
DIBULATKAN 2,858,379,000
TERBILANG : DUA MILYAR DELAPAN RATUS LIMA PULUH DELAPAN JUTA TIGA RATUS TUJUH PULUH SEMBILAN
RIBU RUPIAH
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
BIDANG CIPTA KARYA SESUAI PERMEN NO.11/PRT/M/2013

D A E R A H : PALEMBANG

HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH JUMLAH
Rp Rp
I A. 2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN
1 A.2.2.1.2 1 m' Pagar Sementara dari Seng Gelombang Tinggi 2,00 m 335,827.82
A TENAGA 68,500.00
L.01 0.2 OH Pekerja 95,000.00 19,000.00
L.02 0.4 OH Tukang Kayu 110,000.00 44,000.00
L.03 0.02 OH Kepala Tukang 125,000.00 2,500.00
L.04 0.02 OH Mandor 150,000.00 3,000.00
B BAHAN 214,899.00
1.25 Btg Dolken kayu * 8-10/400 cm 12,000.00 15,000.00
2.5 Kg Portalnd Semen 1,340.00 3,350.00
1.2 Lbr Seng Gelombang 59,500.00 71,400.00
0.005 m3 Pasir Beton 125,000.00 625.00
0.009 m3 Koral Beton 261,000.00 2,349.00
0.072 m3 Kayu 5/7X4m 1,400,000.00 100,800.00
0.06 Kg Paku Biasa 2" - 5" 18,000.00 1,080.00
0.45 Kg Meni Besi 45,100.00 20,295.00
C PERALATAN
D Jumlah A + B + C 283,399.00
E Overhead & Profit ( maksimal 15% ) 18.5% 52,428.82
F Harga Satuan Pekerjaan (D+E) 335,827.82
Overhead & Profit
2 A.2.2.1.4 1 m' Pengukuran dan Pemasangan Bouwplank 65,720.10
A Tenaga 22,500.00
L.01 0.1 OH Pekerja 95,000.00 9,500.00
L.02 0.1 OH Tukang Kayu 110,000.00 11,000.00
L.03 0.01 OH Kepala Tukang 125,000.00 1,250.00
L.04 0.005 OH Mandor 150,000.00 750.00
B Bahan 32,960.00
0.012 m3 Kayu 5/7x 4m 1,900,000.00 22,800.00
0.02 Kg Paku Biasa 2" - 5" 18,000.00 360.00
0.007 m3 Kayu Papan 3/20 1,400,000.00 9,800.00
C PERALATAN
D Jumlah A + B + C 55,460.00
E Overhead & Profit 18.5% 10,260.10
F Harga Satuan Pekerjaan (D+E) 65,720.10

3 A.2.2.1.6 1 m2 Pembuatan Rumah Jaga (Konstruksi Kayu) 970,218.75


A Tenaga 286,250.00
L.01 1 OH Pekerja 95,000.00 95,000.00
L.02 1.5 OH Tukang Kayu 110,000.00 165,000.00
L.03 0.2 OH Kepala Tukang 125,000.00 18,750.00
L.04 0.05 OH Mandor 150,000.00 7,500.00
B Bahan 532,500.00
3.00 Btg Dolken kayu * 8-10/400 cm 12,000.00 36,000.00
0.28 m3 Kayu 1,400,000.00 386,400.00
0.70 Kg Paku Biasa 2" - 5" 18,000.00 12,600.00
1.50 Kg Seng gelombang 65,000.00 97,500.00
C PERALATAN
D Jumlah A + B + C 818,750.00
E Overhead & Profit 18.5% 151,468.75
F Harga Satuan Pekerjaan (D+E) 970,218.75
HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH JUMLAH
Rp Rp
4 A.2.2.1.7 1 m2 Pembuatan Gudang Semen dan Peralatan 924,531.08
A Tenaga 347,500.00
L.01 1 OH Pekerja 95,000.00 95,000.00
L.02 2 OH Tukang Kayu 110,000.00 220,000.00
L.03 0.2 OH Kepala Tukang 125,000.00 25,000.00
L.04 0.05 OH Mandor 150,000.00 7,500.00
B Bahan 432,695.00
1.7 Btg Dolken kayu * 8-10/400 cm 12,000.00 20,400.00
0.21 m3 Kayu 1,400,000.00 294,000.00
0.3 Kg Paku Biasa 2" - 5" 18,000.00 5,400.00
10.5 Kg Portland Semen 1,340.00 14,070.00
0.03 m3 Pasir Beton 125,000.00 3,750.00
0.05 m3 Koral Beton 261,000.00 13,050.00
1.5 Lbr Seng Gelombang 51,500.00 77,250.00
0.25 Lbr Seng Plat 19,100.00 4,775.00
C PERALATAN
D Jumlah A + B + C 780,195.00
E Overhead & Profit 18.5% 144,336.08
F Harga Satuan Pekerjaan (D+E) 924,531.08

5 A.2.2.1.9 1 m2 Membersihkan Lapangan dan Perataan 20,145.00


A Tenaga 17,000.00
L.01 0.1 OH Pekerja 95,000.00 9,500.00
L.04 0.05 OH Mandor 150,000.00 7,500.00
B Bahan
C PERALATAN
D Jumlah A + B + C 17,000.00
E Overhead & Profit 18.5% 3,145.00
F Harga Satuan Pekerjaan (D+E) 20,145.00
file:///conversion/tmp/scratch/375635176.xls

HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH JUMLAH
Rp Rp
II A.2.3.1 HARGA SATUAN PEKERJAAN TANAH

1 A.2.3.1.1 1 m3 Menggali Tanah Biasa Sedalam 1 m 88,875.00


A TENAGA 75,000.00
L.01 0.75 OH Pekerja 95,000.00 71,250.00
L.04 0.025 OH Mandor 150,000.00 3,750.00
B BAHAN
C PERALATAN
D Jumlah A + B + C 75,000.00
E Overhead & Profit 18.5% 13,875.00
F Harga Satuan Pekerjaan (D+E) 88,875.00
Overhead & Profit
2 A.2.3.1.2 1 m3 Menggali Tanah Biasa Sedalam 2 m 109,316.25
A TENAGA 92,250.00
L.01 0.90 OH Pekerja 95,000.00 85,500.00
L.04 0.045 OH Mandor 150,000.00 6,750.00
B BAHAN
C PERALATAN
D Jumlah A + B + C 92,250.00
E Overhead & Profit 18.5% 17,066.25
F Harga Satuan Pekerjaan (D+E) 109,316.25

3 A.2.3.1.3 1 m3 Menggali Tanah Biasa Sedalam 3 m 130,113.00


A TENAGA 109,800.00
L.01 1.05 OH Pekerja 95,000.00 99,750.00
L.04 0.067 OH Mandor 150,000.00 10,050.00
B BAHAN
C PERALATAN
D Jumlah A + B + C 109,800.00
E Overhead & Profit 18.5% 20,313.00
F Harga Satuan Pekerjaan (D+E) 130,113.00

4 A.2.3.1.4 1 m3 Menggali Tanah Keras Sedalam 1 m 118,263.00


TENAGA 99,800.00
L.01 1.000 OH Pekerja 95,000.00 95,000.00
L.04 0.032 OH Mandor 150,000.00 4,800.00
B BAHAN
C PERALATAN
D Jumlah A + B + C 99,800.00
E Overhead & Profit 18.5% 18,463.00
F Harga Satuan Pekerjaan (D+E) 118,263.00

5 A.2.3.1.5 1 m3 Menggali Tanah Cadas Sedalam 1 m 179,527.50


A TENAGA 151,500.00
L.01 1.50 OH Pekerja 95,000.00 142,500.00
L.04 0.060 OH Mandor 150,000.00 9,000.00
B BAHAN
C PERALATAN
D Jumlah A + B + C 151,500.00
E Overhead & Profit 18.5% 28,027.50
F Harga Satuan Pekerjaan (D+E) 179,527.50

6 A.2.3.1.6 1 m3 Menggali Tanah Lumpur Sedalam 1 m 143,088.75


A TENAGA 120,750.00
L.01 1.200 OH Pekerja 95,000.00 114,000.00
L.04 0.045 OH Mandor 150,000.00 6,750.00
B BAHAN
C PERALATAN
D Jumlah A + B + C 120,750.00
E Overhead & Profit 18.5% 22,338.75
F Harga Satuan Pekerjaan (D+E) 143,088.75

375635176.xls 116/51 abk 2-14tanah


file:///conversion/tmp/scratch/375635176.xls

HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH JUMLAH
Rp Rp

7 A.2.3.1.7 1 m2 Mengerjakan Striping Tebing Setinggi 1 m 6,517.50


A TENAGA 5,500.00
L.01 0.05 OH Pekerja 95,000.00 4,750.00
L.04 0.005 OH Mandor 150,000.00 750.00
B BAHAN
C PERALATAN
D Jumlah A + B + C 5,500.00
E Overhead & Profit 18.5% 1,017.50
F Harga Satuan Pekerjaan (D+E) 6,517.50

8 A.2.3.1.8 1 m3 MembuangTanah sejauh 30 m' 38,927.25


A TENAGA 32,850.00
L.01 0.330 OH Pekerja 95,000.00 31,350.00
L.04 0.010 OH Mandor 150,000.00 1,500.00
B BAHAN
C PERALATAN
D Jumlah A + B + C 32,850.00
E Overhead & Profit 18.5% 6,077.25
F Harga Satuan Pekerjaan (D+E) 38,927.25

9 A.2.3.1.9 1 m3 Pengurugan Kembali 21,725.00


Pengurugan Kembali di hitung dari 1/3 kali koefisien Pekerjaan galian
A TENAGA 55,000.00
L.01 0.50 OH Pekerja 95,000.00 47,500.00
L.04 0.050 OH Mandor 150,000.00 7,500.00
B BAHAN
C PERALATAN
D Jumlah A + B + C 55,000.00
E Overhead & Profit 18.5% 10,175.00
F Harga Satuan Pekerjaan (D+E) 65,175.00

10 A.2.3.1.10 1 m3 Pemadatan Tanah (per 20 cm) 65,175.00


A TENAGA 55,000.00
L.01 0.5 OH Pekerja 95,000.00 47,500.00
L.04 0.05 OH Mandor 150,000.00 7,500.00
B BAHAN
C PERALATAN
D Jumlah A + B + C 55,000.00
E Overhead & Profit 18.5% 10,175.00
F Harga Satuan Pekerjaan (D+E) 65,175.00

11 A.2.3.1.11 1 m3 Pengurugan 1 m3 dengan Pasir Urug 170,640.00


A TENAGA 30,000.00
L.01 0.30 OH Pekerja 95,000.00 28,500.00
L.04 0.01 OH Mandor 150,000.00 1,500.00
B BAHAN 114,000.00
1.2 m3 Pasir Urug 95,000.00 114,000.00
C PERALATAN
D Jumlah A + B + C 144,000.00
E Overhead & Profit 18.5% 26,640.00
F Harga Satuan Pekerjaan (D+E) 170,640.00

12 A.2.3.1.12 1 m3 Lapisan Pudel Cmp. 1Kp : 3Ps : 7TL 293,974.80


A TENAGA 137,000.00
L.01 0.800 OH Pekerja 95,000.00 76,000.00
L.02 0.400 OH Tukang Batu 110,000.00 44,000.00
L.03 0.04 OH Kepala Tukang 125,000.00 5,000.00
L.04 0.080 OH Mandor 150,000.00 12,000.00
B BAHAN 111,080.00
0.400 m3 Pasir Pasang 95,000.00 38,000.00

375635176.xls 116/52 abk 2-14tanah


file:///conversion/tmp/scratch/375635176.xls

HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH JUMLAH
Rp Rp
0.135 m3 Kapur Padam 120,000.00 16,200.00
0.948 m3 Tanah Liat 60,000.00 56,880.00
C PERALATAN
D Jumlah A + B + C 248,080.00
E Overhead & Profit 18.5% 45,894.80
F Harga Satuan Pekerjaan (D+E) 293,974.80

13 A.2.3.1.13 1 m2 Pemasangan Lapisan Ijuk tebal 10 cm unt Bidang Resapan 75,010.50


A TENAGA 16,500.00
0.15 OH Pekerja 95,000.00 14,250.00
0.015 OH Mandor 150,000.00 2,250.00
B BAHAN 46,800.00
6.00 kg Ijuk 7,800.00 46,800.00
C PERALATAN
D Jumlah A + B + C 63,300.00
E Overhead & Profit 18.5% 11,710.50
F Harga Satuan Pekerjaan (D+E) 75,010.50

14 A.2.3.1.14 1 m3 Mengurug Sirtu Padat 368,179.50


A TENAGA 27,500.00
0.25 OH Pekerja 95,000.00 23,750.00
0.025 OH Mandor 150,000.00 3,750.00
B BAHAN 283,200.00
1.2 m3 Sirtu 236,000.00 283,200.00
C PERALATAN
D Jumlah A + B + C 310,700.00
E Overhead & Profit 18.5% 57,479.50
F Harga Satuan Pekerjaan (D+E) 368,179.50

375635176.xls 116/53 abk 2-14tanah


file:///conversion/tmp/scratch/375635176.xls

HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH JUMLAH
Rp Rp
III A.3.2.1. HARGA SATUAN PEKERJAAN PONDASI
1 A.3.2.1.1 1 m3 Pemasangan Pondasi Batu Belah 1SP : 3 PB 1,181,381.01
A TENAGA 245,625.00
L.01 1.5 OH Pekerja 95,000.00 142,500.00
L.02 0.750 OH Tukang Batu 110,000.00 82,500.00
L.03 0.075 OH Kepala Tukang 125,000.00 9,375.00
L.04 0.075 OH Mandor 150,000.00 11,250.00
B BAHAN 751,305.00
1.2 m3 Batu Belah 350,000.00 420,000.00
202 Kg Portland Sement 1,340.00 270,680.00
0.485 m3 Pasir Pasang 125,000.00 60,625.00
C PERALATAN
D Jumlah A + B + C 996,946.00
E Overhead & Profit 18.5% 184,435.01
F Harga Satuan Pekerjaan (D+E) 1,181,381.01
Overhead & Profit
2 A.3.2.1.2 1 m3 Pemasangan Pondasi Batu Belah 1SP : 4 PB 1,124,655.06
A TENAGA 245,625.00
L.01 1.5 OH Pekerja 95,000.00 142,500.00
L.02 0.750 OH Tukang Batu 110,000.00 82,500.00
L.03 0.075 OH Kepala Tukang 125,000.00 9,375.00
L.04 0.075 OH Mandor 150,000.00 11,250.00
B BAHAN 703,420.00
1.2 m3 Batu Belah 350,000.00 420,000.00
163 Kg Portland Sement 1,340.00 218,420.00
0.52 m3 Pasir Beton 125,000.00 65,000.00
C PERALATAN
D Jumlah A + B + C 949,076.00
E Overhead & Profit 18.5% 175,579.06
F Harga Satuan Pekerjaan (D+E) 1,124,655.06

3 A.3.2.1.3 1 m3 Pemasangan Pondasi Batu Belah 1SP : 5 PB 1,085,300.03


A TENAGA 245,625.00
L.01 1.5 OH Pekerja 95,000.00 142,500.00
L.02 0.750 OH Tukang Batu 110,000.00 82,500.00
L.03 0.075 OH Kepala Tukang 125,000.00 9,375.00
L.04 0.075 OH Mandor 150,000.00 11,250.00
B BAHAN 670,240.00
1.2 m3 Batu Belah 350,000.00 420,000.00
136 Kg Portland Sement 1,340.00 182,240.00
0.544 m3 Pasir Pasang 125,000.00 68,000.00
C PERALATAN
D Jumlah A + B + C 915,865.00
E Overhead & Profit 18.5% 169,435.03
F Harga Satuan Pekerjaan (D+E) 1,085,300.03

4 A.3.2.1.4 1 m3 Pemasangan Pondasi Batu Belah 1SP : 6 PB 1,057,648.05


A TENAGA 245,625.00
L.01 1.5 OH Pekerja 95,000.00 142,500.00
L.02 0.750 OH Tukang Batu 110,000.00 82,500.00
L.03 0.075 OH Kepala Tukang 125,000.00 9,375.00
L.04 0.075 OH Mandor 150,000.00 11,250.00
B BAHAN 646,905.00
1.2 m3 Batu Belah 15/20 350,000.00 420,000.00
117 Kg Portland Sement 1,340.00 156,780.00
0.561 m3 Pasir Beton 125,000.00 70,125.00
C PERALATAN
D Jumlah A + B + C 892,530.00
E Overhead & Profit 18.5% 165,118.05
F Harga Satuan Pekerjaan (D+E) 1,057,648.05

5 A.3.2.1.5 1 m3 Pemasangan Pondasi Batu Belah 1SP : 8 PB 1,019,769.53


A Tenaga 245,625.00

375635176.xls 116/54 abk 3-14-pondasi


file:///conversion/tmp/scratch/375635176.xls

HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH JUMLAH
Rp Rp
L.01 1.5 OH Pekerja 95,000.00 142,500.00
L.02 0.750 OH Tukang Batu 110,000.00 82,500.00
L.03 0.075 OH Kepala Tukang 125,000.00 9,375.00
L.04 0.075 OH Mandor 150,000.00 11,250.00
B Bahan 614,940.00
1.2 m3 Batu Belah 15/20 350,000.00 420,000.00
91 Kg Portland Sement 1,340.00 121,940.00
0.584 m3 Pasir Pasang 125,000.00 73,000.00
C PERALATAN
D Jumlah A + B + C 860,565.00
E Overhead & Profit 18.5% 159,204.53
F Harga Satuan Pekerjaan (D+E) 1,019,769.53

6 A.3.2.1.6 1 m3 Pemasangan Pondasi Batu Belah 1SP : 1KP : 2PB 895,534.13


A Tenaga 245,625.00
L.01 1.5 OH Pekerja 95,000.00 142,500.00
L.02 0.750 OH Tukang Batu 110,000.00 82,500.00
L.03 0.075 OH Kepala Tukang 125,000.00 9,375.00
L.04 0.075 OH Mandor 150,000.00 11,250.00
B Bahan 510,100.00
1.2 m3 Batu Belah 15/20 350,000.00 420,000.00
0.17 m3 Kapur Pasang (KP) 120,000.00 20,400.00
0.17 Kg Semen Merah (SM) 160,000.00 27,200.00
0.340 m3 Pasir Beton 125,000.00 42,500.00
C PERALATAN
D Jumlah A + B + C 755,725.00
E Overhead & Profit 18.5% 139,809.13
F Harga Satuan Pekerjaan (D+E) 895,534.13

7 A.3.2.1.7 1 m3 Pemasangan Pondasi Batu Belah, 1 SP : 3 KP : 10 PB 979,408.43


A Tenaga 245,625.00
L.01 1.5 OH Pekerja 95,000.00 142,500.00
L.02 0.750 OH Tukang Batu 110,000.00 82,500.00
L.03 0.075 OH Kepala Tukang 125,000.00 9,375.00
L.04 0.075 OH Mandor 150,000.00 11,250.00
B Bahan 580,880.00
1.2 m3 Batu Belah 15/20 350,000.00 420,000.00
61 kg Portland Sement 1,340.00 81,740.00
0.147 m3 Kapur Pasang 120,000.00 17,640.00
0.492 m3 Pasir Beton 125,000.00 61,500.00
C PERALATAN
D Jumlah A + B + C 826,505.00
E Overhead & Profit 18.5% 152,903.43
F Harga Satuan Pekerjaan (D+E) 979,408.43

8 A.3.2.1.8 1 m3 Pemasangan Pondasi Batu Belah, ¼ SP : 1KP : 4 PB 945,375.23


A Tenaga 245,625.00
L.01 1.5 OH Pekerja 95,000.00 142,500.00
L.02 0.750 OH Tukang Batu 110,000.00 82,500.00
L.03 0.075 OH Kepala Tukang 125,000.00 9,375.00
L.04 0.075 OH Mandor 150,000.00 11,250.00
B Bahan 552,160.00
1.2 m3 Batu Belah 15/20 350,000.00 420,000.00
41 kg Portland Sement 1,340.00 54,940.00
0.131 m3 Kapur Pasang 120,000.00 15,720.00
0.492 m3 Pasir 125,000.00 61,500.00
C PERALATAN
D Jumlah A + B + C 797,785.00
E Overhead & Profit 18.5% 147,590.23
F Harga Satuan Pekerjaan (D+E) 945,375.23

375635176.xls 116/55 abk 3-14-pondasi


file:///conversion/tmp/scratch/375635176.xls

HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH JUMLAH
Rp Rp
9 A.3.2.1.9 1 m3 Pemasang Batu Kosong/Anstamping 697,686.53
A Tenaga 127,725.00
L.01 0.78 OH Pekerja 95,000.00 74,100.00
L.02 0.39 OH Tukang Batu 110,000.00 42,900.00
L.03 0.039 OH Kepala Tukang 125,000.00 4,875.00
L.04 0.039 OH Mandor 150,000.00 5,850.00
B Bahan 461,040.00
1.2 m3 Batu Belah 15/20 350,000.00 420,000.00
0.432 m3 Pasir Urug 95,000.00 41,040.00
C PERALATAN
D Jumlah A + B + C 588,765.00
E Overhead & Profit 18.5% 108,921.53
F Harga Satuan Pekerjaan (D+E) 697,686.53

375635176.xls 116/56 abk 3-14-pondasi


file:///conversion/tmp/scratch/375635176.xls

HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH JUMLAH
Rp Rp

IV A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING


1 A.4.4.1.1 1 m2 Pemasangan Dinding Bata Merah ukuran (5x11x22) cm Tebal 1 bata Camp. 1SP: 2PB 274,078.65
A Tenaga 86,000.00
L.01 0.6 OH Pekerja 95,000.00 57,000.00
L.02 0.2 OH Tukang Batu 110,000.00 22,000.00
L.03 0.02 OH Kepala Tukang Batu 125,000.00 2,500.00
L.04 0.03 OH Mandor 150,000.00 4,500.00
B Bahan 145,290.00
140 Buah Bata Merah 550.00 77,000.00
43.5 Kg Portland Semen (PC) 1,340.00 58,290.00
0.08 m3 Pasir Beton (PB) 125,000.00 10,000.00
C PERALATAN
D Jumlah A + B + C 231,290.00
E Overhead & Profit 18.5% 42,788.65
F Harga Satuan Pekerjaan (D+E) 274,078.65
Overhead & Profit
2 A.4.4.1.2 1 m2 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 3PB 258,955.68
A Tenaga 86,000.00
L.01 0.6 OH Pekerja 95,000.00 57,000.00
L.02 0.2 OH Tukang Batu 110,000.00 22,000.00
L.03 0.02 OH Kepala Tukang Batu 125,000.00 2,500.00
L.04 0.03 OH Mandor 150,000.00 4,500.00
B Bahan 132,528.00
140 Buah Bata Merah 550.00 77,000.00
32.95 Kg Portland Semen (PC) 1,340.00 44,153.00
0.091 m3 Pasir Beton (PB) 125,000.00 11,375.00
C PERALATAN
D Jumlah A + B + C 218,528.00
E Overhead & Profit 18.5% 40,427.68
F Harga Satuan Pekerjaan (D+E) 258,955.68

3 A.4.4.1.3 1 m2 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 4PB 249,089.37
A Tenaga 86,000.00
L.01 0.6 OH Pekerja 95,000.00 57,000.00
L.02 0.2 OH Tukang Batu 110,000.00 22,000.00
L.03 0.02 OH Kepala Tukang Batu 125,000.00 2,500.00
L.04 0.03 OH Mandor 150,000.00 4,500.00
B Bahan 124,202.00
140 Buah Bata Merah 550.00 77,000.00
26.55 Kg Portland Semen (PC) 1,340.00 35,577.00
0.093 m3 Pasir Beton (PB) 125,000.00 11,625.00
C PERALATAN
D Jumlah A + B + C 210,202.00
E Overhead & Profit 18.5% 38,887.37
F Harga Satuan Pekerjaan (D+E) 249,089.37

4 A.4.4.1.4 1 m2 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 5PB 243,515.13
A Tenaga 86,000.00
L.01 0.6 OH Pekerja 95,000.00 57,000.00
L.02 0.2 OH Tukang Batu 110,000.00 22,000.00
L.03 0.02 OH Kepala Tukang Batu 125,000.00 2,500.00
L.04 0.03 OH Mandor 150,000.00 4,500.00
B Bahan 119,498.00
140 Buah Bata Merah 550.00 77,000.00
22.2 Kg Portland Semen (PC) 1,340.00 29,748.00
0.102 m3 Pasir Beton (PB) 125,000.00 12,750.00
C PERALATAN
D Jumlah A + B + C 205,498.00
E Overhead & Profit 18.5% 38,017.13
F Harga Satuan Pekerjaan (D+E) 243,515.13

375635176.xls 116/57 abk 4-14-dinding


file:///conversion/tmp/scratch/375635176.xls

HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH JUMLAH
Rp Rp

5 A.4.4.1.5 1 m2 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 6PB 240,602.40
A Tenaga 86,000.00
L.01 0.6 OH Pekerja 95,000.00 57,000.00
L.02 0.2 OH Tukang Batu 110,000.00 22,000.00
L.03 0.02 OH Kepala Tukang Batu 125,000.00 2,500.00
L.04 0.03 OH Mandor 150,000.00 4,500.00
B Bahan 117,040.00
140 Buah Bata Merah 550.00 77,000.00
18.5 Kg Portland Semen (PC) 1,340.00 24,790.00
0.122 m3 Pasir Beton (PB) 125,000.00 15,250.00
C PERALATAN
D Jumlah A + B + C 203,040.00
E Overhead & Profit 18.5% 37,562.40
F Harga Satuan Pekerjaan (D+E) 240,602.40

6 A.4.4.1.6 1 m2 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 3 KP :10PB 226,773.09
A Tenaga 86,000.00
L.01 0.6 OH Pekerja 95,000.00 57,000.00
L.02 0.2 OH Tukang Batu 110,000.00 22,000.00
L.03 0.02 OH Kepala Tukang Batu 125,000.00 2,500.00
L.04 0.03 OH Mandor 150,000.00 4,500.00
B Bahan 105,369.70
140 Buah Bata Merah 550.00 77,000.00
10.08 Kg Portland Semen (PC) 1,340.00 13,507.20
0.0925 m3 Pasir Beton (PB) 125,000.00 11,562.50
0.0275 m3 Kapur Pasang (KP) 120,000.00 3,300.00
C PERALATAN
D Jumlah A + B + C 191,369.70
E Overhead & Profit 18.5% 35,403.39
F Harga Satuan Pekerjaan (D+E) 226,773.09

7 A.4.4.1.7 1 m2 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 2PB 130,946.06
A Tenaga 43,000.00
L.01 0.30 OH Pekerja 95,000.00 28,500.00
L.02 0.1 OH Tukang Batu 110,000.00 11,000.00
L.03 0.01 OH Kepala Tukang 125,000.00 1,250.00
L.04 0.015 OH Mandor 150,000.00 2,250.00
B Bahan 67,503.00
70 Buah Bata Merah 5 x 11 x 22 550.00 38,500.00
18.95 Kg Portland Semen 1,340.00 25,393.00
0.038 m3 Pasir Pasang 95,000.00 3,610.00
C PERALATAN
D Jumlah A + B + C 110,503.00
E Overhead & Profit 18.5% 20,443.06
F Harga Satuan Pekerjaan (D+E) 130,946.06

8 A.4.4.1.8 1 m2 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 3PB 125,320.62
A Tenaga 43,000.00
L.01 0.30 OH Pekerja 95,000.00 28,500.00
L.02 0.1 OH Tukang Batu 110,000.00 11,000.00
L.03 0.01 OH Kepala Tukang 125,000.00 1,250.00
L.04 0.015 OH Mandor 150,000.00 2,250.00
B Bahan 62,755.80
70 Buah Bata Merah 5 x 11 x 22 550.00 38,500.00
14.37 Kg Portland Semen 1,340.00 19,255.80
0.04 m3 Pasir Beton 125,000.00 5,000.00
C PERALATAN
D Jumlah A + B + C 105,755.80
E Overhead & Profit 18.5% 19,564.82
F Harga Satuan Pekerjaan (D+E) 125,320.62

375635176.xls 116/58 abk 4-14-dinding


file:///conversion/tmp/scratch/375635176.xls

HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH JUMLAH
Rp Rp
9 A.4.4.1.9 1 m2 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 4PB 119,679.08
A Tenaga 43,000.00
L.01 0.30 OH Pekerja 95,000.00 28,500.00
L.02 0.1 OH Tukang Batu 110,000.00 11,000.00
L.03 0.01 OH Kepala Tukang 125,000.00 1,250.00
L.04 0.015 OH Mandor 150,000.00 2,250.00
B Bahan 57,995.00
70 Buah Bata Merah 5 x 11 x 22 550.00 38,500.00
11.50 Kg Portland Semen 1,340.00 15,410.00
0.043 m3 Pasir Pasang 95,000.00 4,085.00
C PERALATAN
D Jumlah A + B + C 100,995.00
E Overhead & Profit 18.5% 18,684.08
F Harga Satuan Pekerjaan (D+E) 119,679.08

10 A.4.4.1.10 1 m2 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1/2 Bata Camp. 1SP : 5PB 117,014.25
A Tenaga 43,000.00
L.01 0.30 OH Pekerja 95,000.00 28,500.00
L.02 0.1 OH Tukang Batu 110,000.00 11,000.00
L.03 0.01 OH Kepala Tukang 125,000.00 1,250.00
L.04 0.015 OH Mandor 150,000.00 2,250.00
B Bahan 55,746.20
70 Buah Bata Merah 5 x 11 x 22 550.00 38,500.00
9.68 Kg Portland Semen 1,340.00 12,971.20
0.045 m3 Pasir Pasang 95,000.00 4,275.00
C PERALATAN
D Jumlah A + B + C 98,746.20
E Overhead & Profit 18.5% 18,268.05
F Harga Satuan Pekerjaan (D+E) 117,014.25

11 A.4.4.1.11 1 m2 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 6PB 115,305.00
A Tenaga 43,000.00
L.01 0.30 OH Pekerja 95,000.00 28,500.00
L.02 0.1 OH Tukang Batu 110,000.00 11,000.00
L.03 0.01 OH Kepala Tukang 125,000.00 1,250.00
L.04 0.015 OH Mandor 150,000.00 2,250.00
B Bahan 54,303.80
70 Buah Bata Merah 5 x 11 x 22 550.00 38,500.00
8.32 Kg Portland Semen 1,340.00 11,148.80
0.049 m3 Pasir Pasang 95,000.00 4,655.00
C PERALATAN
D Jumlah A + B + C 97,303.80
E Overhead & Profit 18.5% 18,001.20
F Harga Satuan Pekerjaan (D+E) 115,305.00

12 A.4.4.1.12 1 m2 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 8PB 112,527.60
A Tenaga 43,000.00
L.01 0.30 OH Pekerja 95,000.00 28,500.00
L.02 0.1 OH Tukang Batu 110,000.00 11,000.00
L.03 0.01 OH Kepala Tukang 125,000.00 1,250.00
L.04 0.015 OH Mandor 150,000.00 2,250.00
B Bahan 51,960.00
70 Buah Bata Merah 5 x 11 x 22 550.00 38,500.00
6.50 Kg Portland Semen 1,340.00 8,710.00
0.05 m3 Pasir Pasang 95,000.00 4,750.00
C PERALATAN
D Jumlah A + B + C 94,960.00
E Overhead & Profit 18.5% 17,567.60
F Harga Satuan Pekerjaan (D+E) 112,527.60

375635176.xls 116/59 abk 4-14-dinding


file:///conversion/tmp/scratch/375635176.xls

HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH JUMLAH
Rp Rp
13 A.4.4.1.13 1 m2 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 3KP : 10PB 111,484.80
A Tenaga 43,000.00
L.01 0.30 OH Pekerja 95,000.00 28,500.00
L.02 0.1 OH Tukang Batu 110,000.00 11,000.00
L.03 0.01 OH Kepala Tukang 125,000.00 1,250.00
L.04 0.015 OH Mandor 150,000.00 2,250.00
B Bahan 51,080.00
70 Buah Bata Merah 5 x 11 x 22 550.00 38,500.00
4.5 Kg Portland Semen 1,340.00 6,030.00
0.05 m3 Pasir Pasang 95,000.00 4,750.00
0.015 m3 Kapur Padam 120,000.00 1,800.00
C PERALATAN
D Jumlah A + B + C 94,080.00
E Overhead & Profit 18.5% 17,404.80
F Harga Satuan Pekerjaan (D+E) 111,484.80

14 A.4.4.1.14 1 m2 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 1SM : 1PB 104,576.25
A Tenaga 43,000.00
L.01 0.30 OH Pekerja 95,000.00 28,500.00
L.02 0.1 OH Tukang Batu 110,000.00 11,000.00
L.03 0.01 OH Kepala Tukang 125,000.00 1,250.00
L.04 0.015 OH Mandor 150,000.00 2,250.00
B Bahan 45,250.00
70 Buah Bata Merah 5 x 11 x 22 550.00 38,500.00
0.018 m3 Semen Merah 160,000.00 2,880.00
0.018 m3 Pasir Pasang 95,000.00 1,710.00
0.018 m3 Kapur Padam 120,000.00 2,160.00
C PERALATAN
D Jumlah A + B + C 88,250.00
E Overhead & Profit 18.5% 16,326.25
F Harga Satuan Pekerjaan (D+E) 104,576.25

15 A.4.4.1.15 1 m2 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1KP : 1SM : 2PB 104,374.80
A Tenaga 43,000.00
L.01 0.30 OH Pekerja 95,000.00 28,500.00
L.02 0.1 OH Tukang Batu 110,000.00 11,000.00
L.03 0.01 OH Kepala Tukang 125,000.00 1,250.00
L.04 0.015 OH Mandor 150,000.00 2,250.00
B Bahan 45,080.00
70 Buah Bata Merah 5 x 11 x 22 550.00 38,500.00
0.014 m3 Semen Merah 160,000.00 2,240.00
0.028 m3 Pasir Pasang 95,000.00 2,660.00
0.014 m3 Kapur Padam 120,000.00 1,680.00
C PERALATAN
D Jumlah A + B + C 88,080.00
E Overhead & Profit 18.5% 16,294.80
F Harga Satuan Pekerjaan (D+E) 104,374.80

16 A.4.4.1.20 1 m2 Pemasangan Dinding HB/CB 10, speci camp. 1SP : 3PB 176,439.86
A Tenaga 43,000.00
L.01 0.300 OH Pekerja 95,000.00 28,500.00
L.02 0.100 OH Tukang Batu 110,000.00 11,000.00
L.03 0.010 OH Kepala Tukang 125,000.00 1,250.00
L.04 0.015 OH Mandor 150,000.00 2,250.00
B Bahan 105,894.40
12.500 buah Batako 3,800.00 47,500.00
15.160 kg PC 1,340.00 20,314.40
0.364 m3 Pasir Pasang 95,000.00 34,580.00
0.280 kg Besi Angkur Ø 8 mm 12,500.00 3,500.00
C PERALATAN
D Jumlah A + B + C 148,894.40
E Overhead & Profit 18.5% 27,545.46
F Harga Satuan Pekerjaan (D+E) 176,439.86

375635176.xls 116/60 abk 4-14-dinding


file:///conversion/tmp/scratch/375635176.xls

HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH JUMLAH
Rp Rp

17 A.4.4.1.21 1 m2 Pemasangan Dinding HB/CB 10, speci camp. 1SP : 4PB 174,330.33
A Tenaga 43,000.00
L.01 0.300 OH Pekerja 95,000.00 28,500.00
L.02 0.100 OH Tukang Batu 110,000.00 11,000.00
L.03 0.010 OH Kepala Tukang 125,000.00 1,250.00
L.04 0.015 OH Mandor 150,000.00 2,250.00

B Bahan 104,114.20
12.500 buah Batako 3,800.00 47,500.00
12.130 kg PC 1,340.00 16,254.20
0.388 m3 Pasir Pasang 95,000.00 36,860.00
0.280 kg Besi Angkur Ø 8 mm 12,500.00 3,500.00
C PERALATAN
D Jumlah A + B + C 147,114.20
E Overhead & Profit 18.5% 27,216.13
F Harga Satuan Pekerjaan (D+E) 174,330.33

18 A.4.4.1.22 1 m2 Pemasangan Dinding Terawang (Rooster) Uk, (12x11x24)cm Camp. 1SP : 3PB 805,936.28
A Tenaga 43,000.00
L.01 0.30 OH Pekerja 95,000.00 28,500.00
L.02 0.1 OH Tukang Batu 110,000.00 11,000.00
L.03 0.01 OH Kepala Tukang 125,000.00 1,250.00
L.04 0.015 OH Mandor 150,000.00 2,250.00
B Bahan 637,115.00
30 Buah Terawang / Roster 20,600.00 618,000.00
11 kg Portland Semen 1,340.00 14,740.00
0.035 m3 Pasir Beton 125,000.00 4,375.00
C PERALATAN
D Jumlah A + B + C 680,115.00
E Overhead & Profit 18.5% 125,821.28
F Harga Satuan Pekerjaan (D+E) 805,936.28

19 A.4.4.1.23 1 m2 Pemasangan Dinding Terawang (Rooster) Uk, (12x11x24)cm Camp. 1SP : 4PB 804,692.03
A Tenaga 43,000.00
L.01 0.30 OH Pekerja 95,000.00 28,500.00
L.02 0.1 OH Tukang Batu 110,000.00 11,000.00
L.03 0.01 OH Kepala Tukang 125,000.00 1,250.00
L.04 0.015 OH Mandor 150,000.00 2,250.00
B Bahan 636,065.00
30 Buah Terawang / Roster 20,600.00 618,000.00
11 kg Portland Semen 1,340.00 14,740.00
0.035 m3 Pasir Pasang 95,000.00 3,325.00
C PERALATAN
D Jumlah A + B + C 679,065.00
E Overhead & Profit 18.5% 125,627.03
F Harga Satuan Pekerjaan (D+E) 804,692.03

375635176.xls 116/61 abk 4-14-dinding


file:///conversion/tmp/scratch/375635176.xls

HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH JUMLAH
Rp Rp
V A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN
1 A,4,4,2.1 1 m2 Pemasangan Plesteran 1 Pc : 1 PB Tebal 15 mm 85,201.93
A Tenaga 49,125.00
L.01 0.3 OH Pekerja 95,000.00 28,500.00
L.02 0.15 OH Tukang batu 110,000.00 16,500.00
L.03 0.015 OH Kepala Tukang 125,000.00 1,875.00
L.04 0.015 OH Mandor 150,000.00 2,250.00
B Bahan 22,775.36
15.504 Kg Portland Semen 1,340.00 20,775.36
0.016 m3 Pasir Beton 125,000.00 2,000.00
C PERALATAN
D Jumlah A + B + C 71,900.36
E Overhead & Profit 18.5% 13,301.57
F Harga Satuan Pekerjaan (D+E) 85,201.93

2 A,4,4,2.2 1 m2 Pemasangan Plesteran 1 Pc : 2 PB Tebal 15 mm 77,410.31


A Tenaga 49,125.00
L.01 0.3 OH Pekerja 95,000.00 28,500.00
L.02 0.15 OH Tukang batu 110,000.00 16,500.00
L.03 0.015 OH Kepala Tukang 125,000.00 1,875.00
L.04 0.015 OH Mandor 150,000.00 2,250.00
B Bahan 16,200.16
10.224 Kg Portland Semen 1,340.00 13,700.16
0.020 m3 Pasir Beton 125,000.00 2,500.00
C PERALATAN
D Jumlah A + B + C 65,325.16
E Overhead & Profit 18.5% 12,085.15
F Harga Satuan Pekerjaan (D+E) 77,410.31

3 A,4,4,2.3 1 m2 Pemasangan Plesteran 1 Pc : 3 PB Tebal 15 mm 73,967.51


A Tenaga 49,125.00
L.01 0.3 OH Pekerja 95,000.00 28,500.00
L.02 0.15 OH Tukang batu 110,000.00 16,500.00
L.03 0.015 OH Kepala Tukang 125,000.00 1,875.00
L.04 0.015 OH Mandor 150,000.00 2,250.00
B Bahan 13,294.84
7.776 Kg Portland Semen 1,340.00 10,419.84
0.023 m3 Pasir Beton 125,000.00 2,875.00
C PERALATAN
D Jumlah A + B + C 62,419.84
E Overhead & Profit 18.5% 11,547.67
F Harga Satuan Pekerjaan (D+E) 73,967.51

4 A,4,4,2.4 1 m2 Pemasangan Plesteran 1 Pc : 4 PB Tebal 15 mm 71,676.62


A Tenaga 49,125.00
L.01 0.3 OH Pekerja 95,000.00 28,500.00
L.02 0.15 OH Tukang batu 110,000.00 16,500.00
L.03 0.015 OH Kepala Tukang 125,000.00 1,875.00
L.04 0.015 OH Mandor 150,000.00 2,250.00
B Bahan 11,361.60
6.240 Kg Portland Semen 1,340.00 8,361.60
0.024 m3 Pasir Beton 125,000.00 3,000.00
C PERALATAN
D Jumlah A + B + C 60,486.60
E Overhead & Profit 18.5% 11,190.02
F Harga Satuan Pekerjaan (D+E) 71,676.62

5 A,4,4,2.5 1 m2 Pemasangan Plesteran 1 Pc : 5 PB Tebal 15 mm 70,296.05


A Tenaga 49,125.00
L.01 0.3 OH Pekerja 95,000.00 28,500.00
L.02 0.15 OH Tukang batu 110,000.00 16,500.00
L.03 0.015 OH Kepala Tukang 125,000.00 1,875.00
L.04 0.015 OH Mandor 150,000.00 2,250.00
B Bahan 10,196.56
5.184 Kg Portland Semen 1,340.00 6,946.56
0.026 m3 Pasir Beton 125,000.00 3,250.00
C PERALATAN
D Jumlah A + B + C 59,321.56
E Overhead & Profit 18.5% 10,974.49
F Harga Satuan Pekerjaan (D+E) 70,296.05

6 A,4,4,2.6 1 m2 Pemasangan Plesteran 1 Pc : 6 PB Tebal 15 mm 69,224.67


Tenaga 49,125.00
L.01 0.3 OH Pekerja 95,000.00 28,500.00
L.02 0.15 OH Tukang batu 110,000.00 16,500.00
L.03 0.015 OH Kepala Tukang 125,000.00 1,875.00
L.04 0.015 OH Mandor 150,000.00 2,250.00
Bahan 9,292.44
4.416 Kg Portland Semen 1,340.00 5,917.44
0.027 m3 Pasir Beton 125,000.00 3,375.00

375635176.xls 116/62 abk 5-14-plesteran


file:///conversion/tmp/scratch/375635176.xls

HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH JUMLAH
Rp Rp
C PERALATAN
D Jumlah A + B + C 58,417.44
E Overhead & Profit 18.5% 10,807.23
F Harga Satuan Pekerjaan (D+E) 69,224.67

7 A,4,4,2.7 1 m2 Pemasangan Plesteran 1 Pc : 7 PB Tebal 15 mm 68,610.60


A Tenaga 49,125.00
L.01 0.3 OH Pekerja 95,000.00 28,500.00
L.02 0.15 OH Tukang batu 110,000.00 16,500.00
L.03 0.015 OH Kepala Tukang 125,000.00 1,875.00
L.04 0.015 OH Mandor 150,000.00 2,250.00
B Bahan 8,774.24
3.936 Kg Portland Semen 1,340.00 5,274.24
0.028 m3 Pasir Beton 125,000.00 3,500.00
C PERALATAN
D Jumlah A + B + C 57,899.24
E Overhead & Profit 18.5% 10,711.36
F Harga Satuan Pekerjaan (D+E) 68,610.60

8 A,4,4,2.8 1 m2 Pemasangan Plesteran 1 Pc : 8 PB Tebal 15 mm 67,996.53


A Tenaga 49,125.00
L.01 0.30 OH Pekerja 95,000.00 28,500.00
L.02 0.15 OH Tukang batu 110,000.00 16,500.00
L.03 0.015 OH Kepala Tukang 125,000.00 1,875.00
L.04 0.015 OH Mandor 150,000.00 2,250.00
B Bahan 8,256.04
3.456 Kg Portland Semen 1,340.00 4,631.04
0.029 m3 Pasir Beton 125,000.00 3,625.00
C PERALATAN
D Jumlah A + B + C 57,381.04
E Overhead & Profit 18.5% 10,615.49
F Harga Satuan Pekerjaan (D+E) 67,996.53

9 A.4.4.2.9 1 m2 Pemasangan Plesteran 1 Pc : 1/2 Kp : 3 PB Tebal 15 mm 72,644.53


A Tenaga 51,600.00
L.01 0.36 OH Pekerja 95,000.00 34,200.00
L.02 0.12 OH Tukang batu 110,000.00 13,200.00
L.03 0.012 OH Kepala Tukang 125,000.00 1,500.00
L.04 0.018 OH Mandor 150,000.00 2,700.00
B Bahan 9,703.40
5.760 Kg Portland Semen 1,340.00 7,718.40
0.003 m3 Kapur Pasang 120,000.00 360.00
0.013 m3 Pasir Beton 125,000.00 1,625.00
C PERALATAN
D Jumlah A + B + C 61,303.40
E Overhead & Profit 18.5% 11,341.13
F Harga Satuan Pekerjaan (D+E) 72,644.53

10 A,4,4,2.10 1 m2 Pemasangan Plesteran 1 Pc : 2 Kp : 8 PB Tebal 15 mm 69,583.20


A Tenaga 51,600.00
L.01 0.36 OH Pekerja 95,000.00 34,200.00
L.02 0.12 OH Tukang batu 110,000.00 13,200.00
L.03 0.012 OH Kepala Tukang 125,000.00 1,500.00
L.04 0.018 OH Mandor 150,000.00 2,700.00
B Bahan 7,120.00
3 kg Portland Semen 1,340.00 4,020.00
0.005 m3 Kapur Padam 120,000.00 600.00
0.020 m3 Pasir Beton 125,000.00 2,500.00
C PERALATAN
D Jumlah A + B + C 58,720.00
E Overhead & Profit 18.5% 10,863.20
F Harga Satuan Pekerjaan (D+E) 69,583.20

11 A,4,4,2.11 1 m2 Pemasangan Plesteran 1 SM : 1 Kp : 1 PB Tebal 15 mm 65,465.33


A Tenaga 51,600.00
L.01 0.36 OH Pekerja 95,000.00 34,200.00
L.02 0.12 OH Tukang batu 110,000.00 13,200.00
L.03 0.012 OH Kepala Tukang 125,000.00 1,500.00
L.04 0.018 OH Mandor 150,000.00 2,700.00
B Bahan 3,645.00
0.009 m3 Semen Merah 160,000.00 1,440.00
0.009 m3 Kapur Padam 120,000.00 1,080.00
0.009 m3 Pasir Beton 125,000.00 1,125.00
C PERALATAN
D Jumlah A + B + C 55,245.00
E Overhead & Profit 18.5% 10,220.33
F Harga Satuan Pekerjaan (D+E) 65,465.33

12 A,4,4,2.12 1 m2 Pemasangan Plesteran 1 SM : 1 Kp : 2 PB Tebal 15 mm 65,690.48


A Tenaga 51,600.00

375635176.xls 116/63 abk 5-14-plesteran


file:///conversion/tmp/scratch/375635176.xls

HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH JUMLAH
Rp Rp
L.01 0.36 OH Pekerja 95,000.00 34,200.00
L.02 0.12 OH Tukang batu 110,000.00 13,200.00
L.03 0.012 OH Kepala Tukang 125,000.00 1,500.00
L.04 0.018 OH Mandor 150,000.00 2,700.00
B Bahan 3,835.00
0.007 m3 Semen Merah 160,000.00 1,120.00
0.007 m3 Kapur Padam 120,000.00 840.00
0.015 m3 Pasir Beton 125,000.00 1,875.00
C PERALATAN
D Jumlah A + B + C 55,435.00
E Overhead & Profit 18.5% 10,255.48
F Harga Satuan Pekerjaan (D+E) 65,690.48

13 A,4,4,2.13 1 m2 Pemasangan Plesteran 1 Pc : 1 PB Tebal 20 mm 103,618.63


A Tenaga 65,800.00
L.01 0.40 OH Pekerja 95,000.00 38,000.00
L.02 0.20 OH Tukang batu 110,000.00 22,000.00
L.03 0.020 OH Kepala Tukang 125,000.00 2,500.00
L.04 0.022 OH Mandor 150,000.00 3,300.00
B Bahan 21,641.88
13.632 kg Portland Semen 1,340.00 18,266.88
0.027 m3 Pasir Beton 125,000.00 3,375.00
C PERALATAN
D Jumlah A + B + C 87,441.88
E Overhead & Profit 18.5% 16,176.75
F Harga Satuan Pekerjaan (D+E) 103,618.63

14 A,4,4,2.14 1 m2 Pemasangan Plesteran 1Pc : 3PB Tebal 20 mm 68,918.12


A Tenaga 51,150.00
L.01 0.26 OH Pekerja 95,000.00 24,700.00
L.02 0.2 OH Tukang batu 110,000.00 22,000.00
L.03 0.02 OH Kepala Tukang 125,000.00 2,500.00
L.04 0.013 OH Mandor 150,000.00 1,950.00
B Bahan 17,768.12
10.368 Kg Portland Semen 1,340.00 13,893.12
0.031 m3 Pasir Beton 125,000.00 3,875.00
C PERALATAN
D Jumlah A + B + C 68,918.12
E Overhead & Profit 18.5% 12,749.85
F Harga Satuan Pekerjaan (D+E) 81,667.97

15 A,4,4,2.15 1 m2 Pemasangan Plesteran 1 Pc : 4 PB Tebal 20 mm 95,924.33


A Tenaga 65,800.00
L.01 0.40 OH Pekerja 95,000.00 38,000.00
L.02 0.20 OH Tukang batu 110,000.00 22,000.00
L.03 0.020 OH Kepala Tukang 125,000.00 2,500.00
L.04 0.022 OH Mandor 150,000.00 3,300.00
B Bahan 15,148.80
8.320 kg Portland Semen 1,340.00 11,148.80
0.032 m3 Pasir Beton 125,000.00 4,000.00
C PERALATAN
D Jumlah A + B + C 80,948.80
E Overhead & Profit 18.5% 14,975.53
F Harga Satuan Pekerjaan (D+E) 95,924.33

16 A,4,4,2.16 1 m2 Pemasangan Plesteran 1Pc : 5PB Tebal 20 mm 94,132.94


A Tenaga 65,800.00
L.01 0.400 OH Pekerja 95,000.00 38,000.00
L.02 0.200 OH Tukang batu 110,000.00 22,000.00
L.03 0.020 OH Kepala Tukang 125,000.00 2,500.00
L.04 0.022 OH Mandor 150,000.00 3,300.00
B Bahan 13,637.08
6.912 Kg Portland Semen 1,340.00 9,262.08
0.035 m3 Pasir Beton 125,000.00 4,375.00
C PERALATAN
D Jumlah A + B + C 79,437.08
E Overhead & Profit 18.5% 14,695.86
F Harga Satuan Pekerjaan (D+E) 94,132.94

17 A,4,4,2.17 1 m2 Pemasangan Plesteran 1Pc : 6PB Tebal 20 mm 92,655.06


A Tenaga 65,800.00
L.01 0.40 OH Pekerja 95,000.00 38,000.00
L.02 0.2 OH Tukang batu 110,000.00 22,000.00
L.03 0.02 OH Kepala Tukang 125,000.00 2,500.00
L.04 0.022 OH Mandor 150,000.00 3,300.00
B Bahan 12,389.92
5.888 Kg Portland Semen 1,340.00 7,889.92
0.036 m3 Pasir Beton 125,000.00 4,500.00
C PERALATAN
D Jumlah A + B + C 78,189.92

375635176.xls 116/64 abk 5-14-plesteran


file:///conversion/tmp/scratch/375635176.xls

HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH JUMLAH
Rp Rp
E Overhead & Profit 18.5% 14,465.14
F Harga Satuan Pekerjaan (D+E) 92,655.06

18 A,4,4,2.18 1 m2 Pemasangan Plesteran 1 SM : 2 Kp : 2 PB Tebal 20 mm 91,031.70


A Tenaga 72,050.00
L.01 0.440 OH Pekerja 95,000.00 41,800.00
L.02 0.22 OH Tukang batu 110,000.00 24,200.00
L.03 0.022 OH Kepala Tukang 125,000.00 2,750.00
L.04 0.022 OH Mandor 150,000.00 3,300.00
B Bahan 4,770.00
0.009 m3 Semen Merah 160,000.00 1,440.00
0.009 m3 Kapur Padam 120,000.00 1,080.00
0.018 m3 Pasir Beton 125,000.00 2,250.00
C PERALATAN
D Jumlah A + B + C 76,820.00
E Overhead & Profit 18.5% 14,211.70
F Harga Satuan Pekerjaan (D+E) 91,031.70

19 A,4,4,2.19 1 m2 Pemasangan Berapen 1 Pc : 5PB Tebal 15 mm 41,352.42


A Tenaga 24,700.00
L.01 0.15 OH Pekerja 95,000.00 14,250.00
L.02 0.075 OH Tukang batu 110,000.00 8,250.00
L.03 0.008 OH Kepala Tukang 125,000.00 1,000.00
L.04 0.008 OH Mandor 150,000.00 1,200.00
B Bahan 10,196.56
5.184 Kg Portland Semen 1,340.00 6,946.56
0.026 m3 Pasir Beton 125,000.00 3,250.00
C PERALATAN
D Jumlah A + B + C 34,896.56
E Overhead & Profit 18.5% 6,455.86
F Harga Satuan Pekerjaan (D+E) 41,352.42

20 A,4,4,2.20 1 m' Pemasangan Skoning 1 Pc : 2PB, lebar 10 mm 70,501.58


A Tenaga 57,200.00
L.01 0.080 OH Pekerja 95,000.00 7,600.00
L.02 0.40 OH Tukang batu 110,000.00 44,000.00
L.03 0.040 OH Kepala Tukang 125,000.00 5,000.00
L.04 0.004 OH Mandor 150,000.00 600.00
B Bahan 2,295.00
0.5 Kg Portland Semen 1,340.00 670.00
0.013 m3 Pasir Beton 125,000.00 1,625.00
C PERALATAN
D Jumlah A + B + C 59,495.00
E Overhead & Profit 18.5% 11,006.58
F Harga Satuan Pekerjaan (D+E) 70,501.58

21 A,4,4,2.23 1 m2 Pemasangan Plesteran Ciprat 1Pc : 2 PB 58,703.48


Tenaga 43,000.00
L.01 0.30 OH Pekerja 95,000.00 28,500.00
L.02 0.1 OH Tukang batu 110,000.00 11,000.00
L.03 0.01 OH Kepala Tukang 125,000.00 1,250.00
L.04 0.015 OH Mandor 150,000.00 2,250.00
Bahan 6,538.80
4.32 Kg Portland Semen 1,340.00 5,788.80
0.006 m3 Pasir Beton 125,000.00 750.00
C PERALATAN
D Jumlah A + B + C 49,538.80
E Overhead & Profit 18.5% 9,164.68
F Harga Satuan Pekerjaan (D+E) 58,703.48

22 A,4,4,2.24 1 m2 Pemasangan Finishing Siar Pasangan Dinding Bata Merah (=20 m') 34,204.69
A Tenaga 24,700.00
L.01 0.15 OH Pekerja 95,000.00 14,250.00
L.02 0.075 OH Tukang batu 110,000.00 8,250.00
L.03 0.008 OH Kepala Tukang 125,000.00 1,000.00
L.04 0.008 OH Mandor 150,000.00 1,200.00
B Bahan 4,164.72
3.108 Kg Portland Semen 1,340.00 4,164.72
C PERALATAN
D Jumlah A + B + C 28,864.72
E Overhead & Profit 18.5% 5,339.97
F Harga Satuan Pekerjaan (D+E) 34,204.69

23 A,4,4,2.25 1 m2 Pemasangan Finishing Siar Pasangan Dinding Conblock ekspose (=8 m') 16,286.64
A Tenaga 11,600.00
L.01 0.070 OH Pekerja 95,000.00 6,650.00
L.02 0.035 OH Tukang batu 110,000.00 3,850.00
L.03 0.004 OH Kepala Tukang 125,000.00 500.00
L.04 0.004 OH Mandor 150,000.00 600.00
B Bahan 2,144.00

375635176.xls 116/65 abk 5-14-plesteran


file:///conversion/tmp/scratch/375635176.xls

HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH JUMLAH
Rp Rp
1.600 Kg Portland Semen 1,340.00 2,144.00
C PERALATAN
D Jumlah A + B + C 13,744.00
E Overhead & Profit 18.5% 2,542.64
F Harga Satuan Pekerjaan (D+E) 16,286.64

24 A,4,4,2.26 1 m2 Pemasangan Finishing Siar Pas.Batu Kali Adukan 1Pc : 2PB 70,057.91
Tenaga 49,125.00
L.01 0.3 OH Pekerja 95,000.00 28,500.00
L.02 0.15 OH Tukang batu 110,000.00 16,500.00
L.03 0.015 OH Kepala Tukang 125,000.00 1,875.00
L.04 0.015 OH Mandor 150,000.00 2,250.00
Bahan 9,995.60
6.34 Kg Pc 1,340.00 8,495.60
0.012 m3 PB 125,000.00 1,500.00
C PERALATAN
D Jumlah A + B + C 59,120.60
E Overhead & Profit 18.5% 10,937.31
F Harga Satuan Pekerjaan (D+E) 70,057.91

25 A,4,4,2.27 1 m2 Pemasangan Acian 43,969.43


Tenaga 32,750.00
L.01 0.20 OH Pekerja 95,000.00 19,000.00
L.02 0.10 OH Tukang batu 110,000.00 11,000.00
L.03 0.010 OH Kepala Tukang 125,000.00 1,250.00
L.04 0.010 OH Mandor 150,000.00 1,500.00
Bahan 4,355.00
3.25 Kg Portland Semen 1,340.00 4,355.00
C PERALATAN
D Jumlah A + B + C 37,105.00
E Overhead & Profit 18.5% 6,864.43
F Harga Satuan Pekerjaan (D+E) 43,969.43

375635176.xls 116/66 abk 5-14-plesteran


file:///conversion/tmp/scratch/375635176.xls

HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH JUMLAH
Rp Rp
VI A.4.6.1 HARGA SATUAN PEKERJAAN K A Y U
1 A.4.6.1.1 1 m3 Pembuatan & Pemasangan Kosen Pintu & Jendela Kayu Kelas I 11,508,601.50
A Tenaga 3,290,000.00
L.01 7 OH Pekerja 95,000.00 665,000.00
L.02 21 OH Tukang Kayu 110,000.00 2,310,000.00
L.03 2.10 OH Kepala Tukang 125,000.00 262,500.00
L.04 0.35 OH Mandor 150,000.00 52,500.00
B Bahan 6,421,900.00
1.1 m3 Balok Kayu Merawan 5,800,000.00 6,380,000.00
1.25 kg Paku 10 cm 18,000.00 22,500.00
1 kg Lem Kayu 19,400.00 19,400.00
C PERALATAN
D Jumlah A + B + C 9,711,900.00
E Overhead & Profit 18.5% 1,796,701.50
F Harga Satuan Pekerjaan (D+E) 11,508,601.50

2 A.4.6.1.5 1 m2 Pembuatan & Pemasangan Daun Pintu Panel, Kayu Merawan 818,799.45
A Tenaga 470,000.00
L.01 1.00 OH Pekerja 95,000.00 95,000.00
L.02 3.00 OH Tukang Kayu 110,000.00 330,000.00
L.03 0.30 OH Kepala Tukang 125,000.00 37,500.00
L.04 0.05 OH Mandor 150,000.00 7,500.00
B Bahan 220,970.00
0.04 m3 Papan Kayu Merawan 5,500,000.00 220,000.00
0.050 kg Lem Kayu 19,400.00 970.00
C PERALATAN
D Jumlah A + B + C 690,970.00
E Overhead & Profit 18.5% 127,829.45
F Harga Satuan Pekerjaan (D+E) 818,799.45

3 A.4.6.1.6 1 m2 Pembuatan & Pemasangan Pintu & Jendela Kaca Kayu Merawan 608,876.70
A Tenaga 376,000.00
L.01 0.800 OH Pekerja 95,000.00 76,000.00
L.02 2.400 OH Tukang Kayu 110,000.00 264,000.00
L.03 0.240 OH Kepala Tukang 125,000.00 30,000.00
L.04 0.040 OH Mandor 150,000.00 6,000.00
B Bahan 137,820.00

375635176.xls 116/67 abk 6-14-kayu


file:///conversion/tmp/scratch/375635176.xls

HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH JUMLAH
Rp Rp
0.024 m3 Papan Kayu Merawan 5,500,000.00 132,000.00
0.300 kg Lem Kayu 19,400.00 5,820.00
C PERALATAN
D Jumlah A + B + C 513,820.00
E Overhead & Profit 18.5% 95,056.70
F Harga Satuan Pekerjaan (D+E) 608,876.70

4 A.4.6.1.7 1 m2 Pembuatan & Pemasangan Pintu & Jendela Jalusi Kayu Merawan 985,564.50
A Tenaga 470,000.00
L.01 1 OH Pekerja 95,000.00 95,000.00
L.02 3 OH Tukang Kayu 110,000.00 330,000.00
L.03 0.3 OH Kepala Tukang 125,000.00 37,500.00
L.04 0.05 OH Mandor 150,000.00 7,500.00
B Bahan 361,700.00
0.064 m3 Papan Kayu Merawan 5,500,000.00 352,000.00
0.5 kg Lem Kayu 19,400.00 9,700.00
C PERALATAN
D Jumlah A + B + C 831,700.00
E Overhead & Profit 18.5% 153,864.50
F Harga Satuan Pekerjaan (D+E) 985,564.50

5 A.4.6.1.8 1 m2 Pembuatan&Pemasangan Pintu kayu lapis (Plywood) Rangkap rangka Kayu Merawan (lbr s/d 90 cm) 631,533.90
A Tenaga 329,000.00
L.01 0.700 OH Pekerja 95,000.00 66,500.00
L.02 2.100 OH Tukang Kayu 110,000.00 231,000.00
L.03 0.210 OH Kepala Tukang 125,000.00 26,250.00
L.04 0.035 OH Mandor 150,000.00 5,250.00
B Bahan 203,940.00
0.025 m3 Papan Kayu Merawan 5,500,000.00 137,500.00
0.030 Kg Paku Biasa 1/2" - 1" 18,000.00 540.00
0.500 Ltr Lem Kayu 19,400.00 9,700.00
1.000 Lbr Plywood tebal 4 mm uk.90x220cm 56,200.00 56,200.00
C PERALATAN
D Jumlah A + B + C 532,940.00
E Overhead & Profit 18.5% 98,593.90
F Harga Satuan Pekerjaan (D+E) 631,533.90

6 A.4.6.1.9 1 m2 Pembuatan&Pemasangan Pintu Plywood rangkap, rangka expose kayu merawan 691,139.40
A Tenaga 376,000.00
L.01 0.800 OH Pekerja 95,000.00 76,000.00
L.02 2.400 OH Tukang Kayu 110,000.00 264,000.00
L.03 0.240 OH Kepala Tukang 125,000.00 30,000.00
L.04 0.040 OH Mandor 150,000.00 6,000.00
B Bahan 207,240.00
0.0256 m3 Papan Kayu Merawan 5,500,000.00 140,800.00
0.03 Kg Paku Biasa 1/2" - 1" 18,000.00 540.00
0.5 Ltr Lem Kayu 19,400.00 9,700.00
1 Lbr Plywood tebal 4 mm uk.90x220cm 56,200.00 56,200.00
C PERALATAN
D Jumlah A + B + C 583,240.00
E Overhead & Profit 18.5% 107,899.40
F Harga Satuan Pekerjaan (D+E) 691,139.40

7 A.4.6.1.10 1 m2 Pembuatan & Pemasangan Jalusi mati Kosen Kayu Merawan 819,546.00
A Tenaga 358,900.00
L.01 0.670 OH Pekerja 95,000.00 63,650.00
L.02 2.000 OH Tukang Kayu 110,000.00 220,000.00
L.03 0.200 OH Kepala Tukang 125,000.00 25,000.00
L.04 0.335 OH Mandor 150,000.00 50,250.00
B Bahan 332,700.00
0.06 m3 Papan Kayu Merawan 5,500,000.00 330,000.00
0.15 Kg Paku Biasa 1/2" - 1" 18,000.00 2,700.00
C PERALATAN
D Jumlah A + B + C 691,600.00
E Overhead & Profit 18.5% 127,946.00
F Harga Satuan Pekerjaan (D+E) 819,546.00

8 A.4.6.1.11 1 m2 Pembuatan & Pemasangan Pintu Teakwood Rangkap, Rangka Expose Kayu Merawan 682,631.10
A Tenaga 376,000.00
L.01 0.80 OH Pekerja 95,000.00 76,000.00
L.02 2.40 OH Tukang Kayu 110,000.00 264,000.00
L.03 0.24 OH Kepala Tukang 125,000.00 30,000.00
L.04 0.04 OH Mandor 150,000.00 6,000.00
B Bahan 200,060.00
0.025 m3 Papan Kayu Merawan 5,500,000.00 137,500.00
0.03 Kg Paku Biasa 1/2" - 1" 18,000.00 540.00
0.3 kg Lem Kayu 19,400.00 5,820.00
1 Lbr Teakwood (90 x 220) cm x 4 mm 56,200.00 56,200.00
C PERALATAN
D Jumlah A + B + C 576,060.00

375635176.xls 116/68 abk 6-14-kayu


file:///conversion/tmp/scratch/375635176.xls

HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH JUMLAH
Rp Rp
E Overhead & Profit 18.5% 106,571.10
F Harga Satuan Pekerjaan (D+E) 682,631.10

9 A.4.6.1.12 1 m2 Pembuatan&Pemasangan Pintu Teakwood Rangkap Lapis Formika,Rangka expose Kayu Merawan 754,649.48
A Tenaga 399,575.00
L.01 0.850 OH Pekerja 95,000.00 80,750.00
L.02 2.550 OH Tukang Kayu 110,000.00 280,500.00
L.03 0.255 OH Kepala Tukang 125,000.00 31,875.00
L.04 0.043 OH Mandor 150,000.00 6,450.00
B Bahan 237,260.00
0.025 m3 Papan Kayu Merawan 5,500,000.00 137,500.00
0.03 Kg Paku Biasa 1/2" - 1" 18,000.00 540.00
0.80 kg Lem Kayu 19,400.00 15,520.00
1 Lbr Teakwood (90 x 220) cm x 4 mm 56,200.00 56,200.00
0.5 Lbr Formika 55,000.00 27,500.00
C PERALATAN
D Jumlah A + B + C 636,835.00
E Overhead & Profit 18.5% 117,814.48
F Harga Satuan Pekerjaan (D+E) 754,649.48

375635176.xls 116/69 abk 6-14-kayu


file:///conversion/tmp/scratch/375635176.xls

HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH JUMLAH
Rp Rp
10 A.4.6.1.17 1 m2 Pemasangan Rangka Atap Genteng Beton, Kayu Kelas II 519,978.00
A Tenaga 22,500.00
L.01 0.1 OH Pekerja 95,000.00 9,500.00
L.02 0.1 OH Tukang Kayu 110,000.00 11,000.00
L.03 0.01 OH Kepala Tukang 125,000.00 1,250.00
L.04 0.005 OH Mandor 150,000.00 750.00
B Bahan 416,300.00
0.014 m3 Kayu usuk 5,800,000.00 81,200.00
0.0570 m3 Reng (2x3) cm 5,800,000.00 330,600.00
0.25 Kg Paku Biasa 2" - 5" 18,000.00 4,500.00
C PERALATAN
D Jumlah A + B + C 438,800.00
E Overhead & Profit 18.5% 81,178.00
F Harga Satuan Pekerjaan (D+E) 519,978.00

11 A.4.6.1.21 1 m' Pemasangan Listplank Uk. (3x20)cm Kayu kelas I atau II 113,700.75
A Tenaga 34,750.00
L.01 0.1 OH Pekerja 95,000.00 9,500.00
L.02 0.2 OH Tukang Kayu 110,000.00 22,000.00
L.03 0.020 OH Kepala Tukang 125,000.00 2,500.00
L.04 0.005 OH Mandor 150,000.00 750.00
B Bahan 61,200.00
0.0108 m3 Kayu merawan 5,500,000.00 59,400.00
0.10 Kg Paku Biasa 2" - 5" 18,000.00 1,800.00
C PERALATAN
D Jumlah A + B + C 95,950.00
E Overhead & Profit 18.5% 17,750.75
F Harga Satuan Pekerjaan (D+E) 113,700.75

12 A.4.6.1.22 1 m' Pemasangan Listplank Uk. (3x30)cm Kayu kelas I atau II 113,937.75
A Tenaga 34,750.00
L.01 0.1 OH Pekerja 95,000.00 9,500.00
L.02 0.2 OH Tukang Kayu 110,000.00 22,000.00
L.03 0.02 OH Kepala Tukang 125,000.00 2,500.00
L.04 0.005 OH Mandor 150,000.00 750.00
B Bahan 61,400.00
0.011 m3 Kayu Merawan 5,500,000.00 60,500.00

375635176.xls 116/70 abk 6-14-kayu


file:///conversion/tmp/scratch/375635176.xls

HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH JUMLAH
Rp Rp
0.05 Kg Paku Biasa 2" - 5" 18,000.00 900.00
C PERALATAN
D Jumlah A + B + C 96,150.00
E Overhead & Profit 18.5% 17,787.75
F Harga Satuan Pekerjaan (D+E) 113,937.75

375635176.xls 116/71 abk 6-14-kayu


file:///conversion/tmp/scratch/375635176.xls

HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH JUMLAH
Rp Rp
VII A.4.1.1 HARGA SATUAN PEKERJAAN BETON
1 A.4.1.1.1 1 m3 Membuat Beton mutu f'c=7,4 Mpa (K100), slum (12±2)cm, w/c = 0,87 896,303.53
A Tenaga 202,950.00
L.01 1.65 OH Pekerja 95,000.00 156,750.00
L.02 0.275 OH Tukang Batu 110,000.00 30,250.00
L.03 0.028 OH Kepala Tukang 125,000.00 3,500.00
L.04 0.083 OH Mandor 150,000.00 12,450.00
B Bahan 553,424.29
247 Kg Portland Semen 1,340.00 330,980.00
1 m3 Pasir Beton 125,000.00 77,589.29
1 m3 Kerikil 261,000.00 144,855.00
215 ltr Air 0.00 -
C PERALATAN
D Jumlah A + B + C 756,374.29
E Overhead & Profit 18.5% 139,929.24
F Harga Satuan Pekerjaan (D+E) 896,303.53
Overhead & Profit 10.0%
2 A.4.1.1.2 1 m3 Membuat Beton mutu f'c=9,8 Mpa (K125), slum (12±2)cm, w/c = 0,78 940,248.41
A Tenaga 202,950.00
L.01 1.65 OH Pekerja 95,000.00 156,750.00
L.02 0.28 OH Tukang Batu 110,000.00 30,250.00
L.03 0.03 OH Kepala Tukang 125,000.00 3,500.00
L.04 0.08 OH Mandor 150,000.00 12,450.00
B Bahan 590,508.57
276 Kg Portland Semen 1,340.00 369,840.00
1 m3 Pasir Beton 125,000.00 73,928.57
1 m3 Kerikil 261,000.00 146,740.00
215 ltr Air 0.00 -
C PERALATAN
D Jumlah A + B + C 793,458.57
E Overhead & Profit 18.5% 146,789.84
F Harga Satuan Pekerjaan (D+E) 940,248.41

3 A.4.1.1.3 1.00 m3 Membuat Beton mutu f'c=12,2 Mpa (K150), slum (12±2)cm, w/c = 0,72 974,560.93
A Tenaga 202,950.00
L.01 1.65 OH Pekerja 95,000.00 156,750.00
L.02 0.28 OH Tukang Batu 110,000.00 30,250.00
L.03 0.03 OH Kepala Tukang 125,000.00 3,500.00
L.04 0.08 OH Mandor 150,000.00 12,450.00
B Bahan 619,464.29
299 Kg Portland Semen 1,340.00 400,660.00
1 m3 Pasir Beton 125,000.00 71,339.29
1 m3 Kerikil 261,000.00 147,465.00
215 ltr Air 0.00 -
C PERALATAN
D Jumlah A + B + C 822,414.29
E Overhead & Profit 18.5% 152,146.64
F Harga Satuan Pekerjaan (D+E) 974,560.93

4 A.4.1.1.4 1.00 m3 Membuat Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0,87 810,951.36
A Tenaga 147,500.00
L.01 1.200 OH Pekerja 95,000.00 114,000.00
L.02 0.200 OH Tukang Batu 110,000.00 22,000.00
L.03 0.020 OH Kepala Tukang 125,000.00 2,500.00
L.04 0.060 OH Mandor 150,000.00 9,000.00
B Bahan 536,847.14
230 Kg Portland Semen 1,340.00 308,200.00
0.638 m3 Pasir Beton 125,000.00 79,732.14
1 m3 Kerikil 261,000.00 148,915.00
200 ltr Air 0.00 -
C PERALATAN
D Jumlah A + B + C 684,347.14
E Overhead & Profit 18.5% 126,604.22
F Harga Satuan Pekerjaan (D+E) 810,951.36
5 A.4.1.1.5 1 m3 Membuat Beton mutu f'c=14,5 MPa (K175), slum (12±2)cm, w/c = 0,66 1,015,369.79
A Tenaga 202,950.00
L.01 1.65 OH Pekerja 95,000.00 156,750.00
L.02 0.275 OH Tukang Batu 110,000.00 30,250.00
L.03 0.028 OH Kepala Tukang 125,000.00 3,500.00
L.04 0.083 OH Mandor 150,000.00 12,450.00
B Bahan 653,902.14
326 Kg Portland Semen 1,340.00 436,840.00
1 Kg Pasir Beton 125,000.00 67,857.14
375635176.xls 116/72 abk 7-14-beton
file:///conversion/tmp/scratch/375635176.xls

HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH JUMLAH
Rp Rp
1 Kg Kerikil 261,000.00 149,205.00
215 ltr Air 0.00 -
C PERALATAN
D Jumlah A + B + C 856,852.14
E Overhead & Profit 18.5% 158,517.65
F Harga Satuan Pekerjaan (D+E) 1,015,369.79

6 A.4.1.1.6 1 m3 Membuat Beton mutu f'c=16,9 MPa (K200), slum (12±2)cm, w/c = 0,61 1,053,930.54
A Tenaga 202,950.00
L.01 1.650 OH Pekerja 95,000.00 156,750.00
L.02 0.275 OH Tukang Batu 110,000.00 30,250.00
L.03 0.028 OH Kepala Tukang 125,000.00 3,500.00
L.04 0.083 OH Mandor 150,000.00 12,450.00
B Bahan 686,442.86
352 Kg Portland Semen 1,340.00 471,680.00
1 m3 Pasir Beton 125,000.00 65,267.86
1 m3 Kerikil 261,000.00 149,495.00
215 ltr Air 0.00 -
C PERALATAN
D Jumlah A + B + C 889,392.86
E Overhead & Profit 18.5% 164,537.68
F Harga Satuan Pekerjaan (D+E) 1,053,930.54

7 A.4.1.1.7 1 m3 Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 1,083,358.32
A Tenaga 202,950.00
L.01 1.650 OH Pekerja 95,000.00 156,750.00
L.02 0.275 OH Tukang Batu 110,000.00 30,250.00
L.03 0.028 OH Kepala Tukang 125,000.00 3,500.00
L.04 0.083 OH Mandor 150,000.00 12,450.00
B Bahan 711,276.43
371 Kg Portland Semen 1,340.00 497,140.00
0 m3 Pasir Beton 125,000.00 62,321.43
1 m3 Kerikil 261,000.00 151,815.00
215 ltr Air 0.00 -
C PERALATAN
D Jumlah A + B + C 914,226.43
E Overhead & Profit 18.5% 169,131.89
F Harga Satuan Pekerjaan (D+E) 1,083,358.32

8 A.4.1.1.8 1 m3 Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 1,101,991.60
A Tenaga 202,950.00
L.01 1.650 OH Pekerja 95,000.00 156,750.00
L.02 0.275 OH Tukang Batu 110,000.00 30,250.00
L.03 0.028 OH Kepala Tukang 125,000.00 3,500.00
L.04 0.083 OH Mandor 150,000.00 12,450.00
B Bahan 727,000.71
384 Kg Portland Semen 1,340.00 514,560.00
0 m3 Pasir Beton 125,000.00 61,785.71
1 m3 Kerikil 261,000.00 150,655.00
215 ltr Air 0.00 -
C PERALATAN
D Jumlah A + B + C 929,950.71
E Overhead & Profit 18.5% 172,040.88
F Harga Satuan Pekerjaan (D+E) 1,101,991.60

9 A.4.1.1.9 1 m3 Membuat Lantai Kerja Beton mutu f'c=24,0 MPa (K275), slum (12±2)cm, w/c = 0,53 1,133,845.24
A Tenaga 202,950.00
L.01 1.650 OH Pekerja 95,000.00 156,750.00
L.02 0.275 OH Tukang Batu 110,000.00 30,250.00
L.03 0.028 OH Kepala Tukang 125,000.00 3,500.00
L.04 0.083 OH Mandor 150,000.00 12,450.00
B Bahan 753,881.43
406 Kg Portland Semen 1,340.00 544,040.00
0 m3 Pasir Beton 125,000.00 61,071.43
1 m3 Kerikil 261,000.00 148,770.00
215 ltr Air 0.00 -
C PERALATAN
D Jumlah A + B + C 956,831.43
E Overhead & Profit 18.5% 177,013.81

375635176.xls 116/73 abk 7-14-beton


file:///conversion/tmp/scratch/375635176.xls

HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH JUMLAH
Rp Rp
F Harga Satuan Pekerjaan (D+E) 1,133,845.24
10 A.4.1.1.10 1 m3 Membuat Beton mutu f'c=26,4 MPa (K300), slum (12±2)cm, w/c = 0,52 1,143,784.01
A Tenaga 202,950.00
L.01 1.650 OH Pekerja 95,000.00 156,750.00
L.02 0.275 OH Tukang Batu 110,000.00 30,250.00
L.03 0.028 OH Kepala Tukang 125,000.00 3,500.00
L.04 0.083 OH Mandor 150,000.00 12,450.00
B Bahan 762,268.57
413 Kg Portland Semen 1,340.00 553,420.00
0 Kg Pasir Beton 125,000.00 60,803.57
1 Kg Kerikil 261,000.00 148,045.00
215 ltr Air 0.00 -
C PERALATAN
D Jumlah A + B + C 965,218.57
E Overhead & Profit 18.5% 178,565.44
F Harga Satuan Pekerjaan (D+E) 1,143,784.01

11 A.4.1.1.11 1 m3 Membuat Beton mutu f'c=28,8 MPa (K325), slum (12±2)cm, w/c = 0,49 1,246,710.57
A Tenaga 258,125.00
L.01 2.1 OH Pekerja 95,000.00 199,500.00
L.02 0.35 OH Tukang Batu 110,000.00 38,500.00
L.03 0.035 OH Kepala Tukang 125,000.00 4,375.00
L.04 0.105 OH Mandor 150,000.00 15,750.00
B Bahan 793,951.43
439 Kg Portland Semen 1,340.00 588,260.00
0 m3 Pasir Beton 125,000.00 59,821.43
1 m3 Kerikil 261,000.00 145,870.00
215 ltr Air 0.00 -
C PERALATAN
D Jumlah A + B + C 1,052,076.43
E Overhead & Profit 18.5% 194,634.14
F Harga Satuan Pekerjaan (D+E) 1,246,710.57

12 A.4.1.1.12 1 m3 Membuat Beton mutu f'c=31,2 MPa (K350), slum (12±2)cm, w/c = 0,48 1,259,653.31
A Tenaga 258,125.00
L.01 2.10 OH Pekerja 95,000.00 199,500.00
L.02 0.350 OH Tukang Batu 110,000.00 38,500.00
L.03 0.035 OH Kepala Tukang 125,000.00 4,375.00
L.04 0.105 OH Mandor 150,000.00 15,750.00
B Bahan 804,873.57
448 Kg Portland Semen 1,340.00 600,320.00
0 m3 Pasir Beton 125,000.00 59,553.57
1 m3 Kerikil 261,000.00 145,000.00
215 ltr Air 0.00 -
C PERALATAN
D Jumlah A + B + C 1,062,998.57
E Overhead & Profit 18.5% 196,654.74
F Harga Satuan Pekerjaan (D+E) 1,259,653.31

13 A.4.1.1.17 10 Kg Pembesian dg Besi Polos 177,483.38


A Tenaga 15,825.00
L.01 0.07 OH Pekerja 95,000.00 6,650.00
L.02 0.07 OH Tukang Besi 110,000.00 7,700.00
L.03 0.007 OH Kepala Tukang 125,000.00 875.00
L.04 0.004 OH Mandor 150,000.00 600.00
B Bahan 133,950.00
10.50 Kg Besi Beton polos 12,500.00 131,250.00
0.150 Kg Kawat Beton 18,000.00 2,700.00
C PERALATAN
D Jumlah A + B + C 149,775.00
E Overhead & Profit 18.5% 27,708.38
F Harga Satuan Pekerjaan (D+E) 177,483.38

13.A A.4.1.1.17.a 10 Kg Pembesian dg Besi Ulir 177,483.38


A Tenaga 15,825.00
L.01 0.07 OH Pekerja 95,000.00 6,650.00
L.02 0.07 OH Tukang Besi 110,000.00 7,700.00
L.03 0.007 OH Kepala Tukang 125,000.00 875.00
L.04 0.004 OH Mandor 150,000.00 600.00
B Bahan 133,950.00

375635176.xls 116/74 abk 7-14-beton


file:///conversion/tmp/scratch/375635176.xls

HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH JUMLAH
Rp Rp
10.50 Kg Besi Beton ulir 12,500.00 131,250.00
0.150 Kg Kawat Beton 18,000.00 2,700.00
C PERALATAN
D Jumlah A + B + C 149,775.00
E Overhead & Profit 18.5% 27,708.38
F Harga Satuan Pekerjaan (D+E) 177,483.38

14 A.4.1.1.18 10 Kg Kabel Presstresed Polos/strand 171,084.38


A Tenaga 11,325.00
L.01 0.05 OH Pekerja 95,000.00 4,750.00
L.02 0.05 OH Tukang Besi 110,000.00 5,500.00
L.03 0.005 OH Kepala Tukang 125,000.00 625.00
L.04 0.003 OH Mandor 150,000.00 450.00
B Bahan 133,050.00
10.5 Kg Besi presstred polos 12,500.00 131,250.00
0.1 Kg Kawat Beton 18,000.00 1,800.00
C PERALATAN
D Jumlah A + B + C 144,375.00
E Overhead & Profit 18.5% 26,709.38
F Harga Satuan Pekerjaan (D+E) 171,084.38

15 A.4.1.1.19 10 Kg Jaring Kawat baja/Wire Mesh 252,760.50


A Tenaga 8,400.00
L.01 0.025 OH Pekerja 95,000.00 2,375.00
L.02 0.025 OH Tukang Besi 110,000.00 2,750.00
L.03 0.025 OH Kepala Tukang 125,000.00 3,125.00
L.04 0.001 OH Mandor 150,000.00 150.00
B Bahan 204,900.00
10.20 Kg Jaring Kawat Baja dilas 20,000.00 204,000.00
0.05 Kg Kawat Beton 18,000.00 900.00
C PERALATAN
D Jumlah A + B + C 213,300.00
E Overhead & Profit 18.5% 39,460.50
F Harga Satuan Pekerjaan (D+E) 252,760.50

16 A.4.1.1.20 1 m2 Memasang Bekisting untuk Pondasi 184,409.70


A Tenaga 85,150.00
L.01 0.52 OH Pekerja 95,000.00 49,400.00
L.02 0.26 OH Tukang Kayu 110,000.00 28,600.00
L.03 0.026 OH Kepala Tukang 125,000.00 3,250.00
L.04 0.026 OH Mandor 150,000.00 3,900.00
B Bahan 70,470.00
0.04 m3 Kayu Klas III (Tahun) 1,600,000.00 64,000.00
0.3 Kg Paku 5" - 10" 18,000.00 5,400.00
0.1 Ltr Minyak Bekisting 10,700.00 1,070.00
C PERALATAN
D Jumlah A + B + C 155,620.00
E Overhead & Profit 18.5% 28,789.70
F Harga Satuan Pekerjaan (D+E) 184,409.70

17 A.4.1.1.21 1 m2 Memasang Bekisting untuk Sloof 193,889.70


A Tenaga 85,150.00
L.01 0.52 OH Pekerja 95,000.00 49,400.00
L.02 0.26 OH Tukang Kayu 110,000.00 28,600.00
L.03 0.026 OH Kepala Tukang 125,000.00 3,250.00
L.04 0.026 OH Mandor 150,000.00 3,900.00
B Bahan 78,470.00
0.045 m3 Kayu Klas III (Tahun) 1,600,000.00 72,000.00
0.3 Kg Paku Biasa 2" - 5" 18,000.00 5,400.00
0.1 Ltr Minyak Bekisting 10,700.00 1,070.00
C PERALATAN
D Jumlah A + B + C 163,620.00
E Overhead & Profit 18.5% 30,269.70
F Harga Satuan Pekerjaan (D+E) 193,889.70

18 A.4.1.1.22 1 m2 Memasang Bekisting untuk Kolom 307,406.78


A Tenaga 108,075.00
L.01 0.66 OH Pekerja 95,000.00 62,700.00
L.02 0.33 OH Tukang Kayu 110,000.00 36,300.00
L.03 0.033 OH Kepala Tukang 125,000.00 4,125.00

375635176.xls 116/75 abk 7-14-beton


file:///conversion/tmp/scratch/375635176.xls

HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH JUMLAH
Rp Rp
L.04 0.033 OH Mandor 150,000.00 4,950.00
B Bahan 151,340.00
0.04 m3 Kayu Klas II (Kruing) 1,600,000.00 64,000.00
0.4 Kg Paku 5" - 12" 18,000.00 7,200.00
0.2 Ltr Minyak Bekisting 10,700.00 2,140.00
0.015 m3 Balok kayu kelas II Kruing 1,400,000.00 21,000.00
0.35 Lbr Plywood tebal 9mm 100,000.00 35,000.00
2 Btg Bambu Ø 8 - 10 cm 4 meter 11,000.00 22,000.00
C PERALATAN
D Jumlah A + B + C 259,415.00
E Overhead & Profit 18.5% 47,991.78
F Harga Satuan Pekerjaan (D+E) 307,406.78

19 A.4.1.1.23 1 m2 Memasang Bekisting untuk Balok 312,383.78


A Tenaga 108,075.00
L.01 0.66 OH Pekerja 95,000.00 62,700.00
L.02 0.33 OH Tukang Kayu 110,000.00 36,300.00
L.03 0.033 OH Kepala Tukang 125,000.00 4,125.00
L.04 0.033 OH Mandor 150,000.00 4,950.00
B Bahan 155,540.00
0.04 m3 Kayu Klas III (Terentang) 1,600,000.00 64,000.00
0.4 Kg Paku 5" - 12" 18,000.00 7,200.00
0.2 Ltr Minyak Bekisting 10,700.00 2,140.00
0.018 m3 Balok Kayu Klas II Kruing 1,400,000.00 25,200.00
0.35 Lbr Plywood tebal 9mm 100,000.00 35,000.00
2 Btg Bambu 8-10 4 meter 11,000.00 22,000.00
C PERALATAN
D Jumlah A + B + C 263,615.00
E Overhead & Profit 18.5% 48,768.78
F Harga Satuan Pekerjaan (D+E) 312,383.78

375635176.xls 116/76 abk 7-14-beton


file:///conversion/tmp/scratch/375635176.xls

HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH JUMLAH
Rp Rp

VIII A.4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP


1 A.4.5.2.30 1 m2 Pemasangan Atap Genteng Beton 1,277,773.65
A Tenaga 32,750.00
L.01 0.2 OH Pekerja 95,000.00 19,000.00
L.02 0.1 OH Tukang Kayu 110,000.00 11,000.00
L.03 0.01 OH Kepala Tukang 125,000.00 1,250.00
L.04 0.01 OH Mandor 150,000.00 1,500.00

B Bahan 1,045,540.00
11 Lbr Genteng Beton Standrad 95,000.00 1,045,000.00
0.03 Kg Paku Biasa 2" - 5" 18,000.00 540.00

C PERALATAN
D Jumlah A + B + C 1,078,290.00
E Overhead & Profit 18.5% 199,483.65

F Harga Satuan Pekerjaan (D+E) 1,277,773.65


Overhead & Profit
2 A.4.5.2.32 1 m2 Pemasangan Atap Genteng Metal 157,901.25
A Tenaga 32,750.00
L.01 0.2 OH Pekerja 95,000.00 19,000.00
L.02 0.1 OH Tukang Kayu 110,000.00 11,000.00
L.03 0.01 OH Kepala Tukang 125,000.00 1,250.00
L.04 0.01 OH Mandor 150,000.00 1,500.00
B Bahan 100,500.00
1.02 m2 Genteng Metal 95,000.00 96,900.00

0.20 Kg Paku Biasa Ø ½" - 1" 18,000.00 3,600.00


C PERALATAN
D Jumlah A + B + C 133,250.00

E Overhead & Profit 18.5% 24,651.25


F Harga Satuan Pekerjaan (D+E) 157,901.25

3 A.4.5.2.36 1 m' Pemasangan Nok Genteng Metal 83,275.88


A Tenaga 44,075.00
L.01 0.250 OH Pekerja 95,000.00 23,750.00
L.02 0.150 OH Tukang Kayu 110,000.00 16,500.00
L.03 0.015 OH Kepala Tukang 125,000.00 1,875.00
L.04 0.013 OH Mandor 150,000.00 1,950.00

B Bahan 26,200.00
1.1 Buah Nok Genteng 23,000.00 25,300.00
0.05 Kg Paku Biasa Ø ½" - 1" 18,000.00 900.00

C PERALATAN
D Jumlah A + B + C 70,275.00
E Overhead & Profit 18.5% 13,000.88
F Harga Satuan Pekerjaan (D+E) 83,275.88

375635176.xls 116/77 abk 8-14-penutup atap


file:///conversion/tmp/scratch/375635176.xls

HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH JUMLAH
Rp Rp

IX A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT


1 A.4.5.1.1 1 m2 Pemasangan Langit-langit PVC 221,914.95
A Tenaga 12,025.00
L.01 0.03 OH Pekerja 95,000.00 2,850.00
L.02 0.07 OH Tukang Kayu 110,000.00 7,700.00
L.03 0.007 OH Kepala Tukang 125,000.00 875.00
L.04 0.004 OH Mandor 150,000.00 600.00
B Bahan 175,245.00
1.0 m2 PVC 175,000.00 175,000.00
0.01 Kg Paku 24,500.00 245.00
C PERALATAN
D Jumlah A + B + C 187,270.00
E Overhead & Profit 18.5% 34,644.95

F Harga Satuan Pekerjaan (D+E) 221,914.95

2 A.4.5.1.7 1 m2 Memasang Langit-langit Gypsu Board, Uk (120x240) tebal 9 mm 51,553.43


A Tenaga 16,375.00
L.01 0.1 OH Pekerja 95,000.00 9,500.00
L.02 0.05 OH Tukang Kayu 110,000.00 5,500.00
L.03 0.005 OH Kepala Tukang 125,000.00 625.00
L.04 0.005 OH Mandor 150,000.00 750.00
B Bahan 27,130.00

0.364 Lbr Gypsum Board 70,000.00 25,480.00


0.11 Kg Paku Sekrup 15,000.00 1,650.00
C PERALATAN

D Jumlah A + B + C 43,505.00
E Overhead & Profit 18.5% 8,048.43
F Harga Satuan Pekerjaan (D+E) 51,553.43

3 A.4.5.1.8 1 m2 Memasang Langit-langit Akuatik Uk (60x120) cm & Rangka Allumunium 276,756.75


A Tenaga 112,500.00
L.01 0.5 OH Pekerja 95,000.00 47,500.00
L.02 0.5 OH Tukang Kayu 110,000.00 55,000.00
L.03 0.05 OH Kepala Tukang 125,000.00 6,250.00
L.04 0.025 OH Mandor 150,000.00 3,750.00
B Bahan 121,050.00
3.6 m' Profil Allumunium "T" 4,000.00 14,400.00
0.15 kg Kawat Ø 4 mm 7,000.00 1,050.00
1.05 bh Ramset 22,000.00 23,100.00
1.5 lmb Akuatik 60 x 120 cm 55,000.00 82,500.00
C PERALATAN
D Jumlah A + B + C 233,550.00
E Overhead & Profit 18.5% 43,206.75
F Harga Satuan Pekerjaan (D+E) 276,756.75

4 A.4.5.1.9 1 m1 List Langit-Langit 34,862.70


A Tenaga 11,325.00
L.01 0.05 OH Pekerja 95,000.00 4,750.00
L.02 0.05 OH Tukang Kayu 110,000.00 5,500.00
L.03 0.005 OH Kepala Tukang 125,000.00 625.00
L.04 0.003 OH Mandor 150,000.00 450.00
B Bahan 18,095.00
1.05 m1 List Gypsum 17,000.00 17,850.00
0.01 Kg Paku 24,500.00 245.00
C PERALATAN
D Jumlah A + B + C 29,420.00
E Overhead & Profit 18.5% 5,442.70
F Harga Satuan Pekerjaan (D+E) 34,862.70

375635176.xls 116/78 abk 9-14-langit2


file:///conversion/tmp/scratch/375635176.xls

HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH JUMLAH
Rp Rp

X A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


1 A.5.1.1.1 1 Unit Memasang Closet Duduk / Mono Blok 3,407,378.63
A Tenaga 458,625.00
L.01 3.3 OH Pekerja 95,000.00 313,500.00
L.02 1.1 OH Tukang Batu 110,000.00 121,000.00
L.03 0.001 OH Kepala Tukang 125,000.00 125.00
L.04 0.16 OH Mandor 150,000.00 24,000.00
Buah Bahan 2,416,800.00
1 Buah Kloset Duduk + Asesoris 2,280,000.00 2,280,000.00
0.06 Kelengkapan 6% dari harga Kloset 2,280,000.00 136,800.00
C PERALATAN
D Jumlah A + B + C 2,875,425.00
E Overhead & Profit 18.5% 531,953.63
F Harga Satuan Pekerjaan (D+E) 3,407,378.63
Overhead & Profit
2 A.5.1.1.2 1 Unit Memasang Closet Jongkok Porselen 771,482.40
A Tenaga 302,750.00
L.01 1 OH Pekerja 95,000.00 95,000.00
L.02 1.5 OH Tukang Batu 110,000.00 165,000.00
L.03 0.15 OH Kepala Tukang 125,000.00 18,750.00
L.04 0.16 OH Mandor 150,000.00 24,000.00
B Bahan 348,290.00
1 Buah Kloset Jongkok 339,000.00 339,000.00
6 Kg Portland Semen 1,340.00 8,040.00
0.01 m3 Pasir Beton 125,000.00 1,250.00
C PERALATAN
D Jumlah A + B + C 651,040.00
E Overhead & Profit 18.5% 120,442.40
F Harga Satuan Pekerjaan (D+E) 771,482.40

3 A.5.1.1.4 1 Unit Memasang Urinoir 3,443,005.65


A Tenaga 225,000.00
L.01 1 OH Pekerja 95,000.00 95,000.00
L.02 1 OH Tukang Batu 110,000.00 110,000.00
L.03 0.1 OH Kepala Tukang 125,000.00 12,500.00
L.04 0.05 OH Mandor 150,000.00 7,500.00
B Bahan 2,680,490.00
1 Buah Urinoir 2,055,000.00 2,055,000.00
0.3 - Perlengkapan 30% Harga Urinoir 2,055,000.00 616,500.00
6 Kg Portland Semen 1,340.00 8,040.00
0.01 m3 Pasir Pasang 95,000.00 950.00
C PERALATAN
D Jumlah A + B + C 2,905,490.00
E Overhead & Profit 18.5% 537,515.65
F Harga Satuan Pekerjaan (D+E) 3,443,005.65

4 A.5.1.1.5 1 Unit Memasang Wastafel 863,521.35


A Tenaga 163,700.00
L.01 1.2 OH Pekerja 95,000.00 114,000.00
L.02 0.145 OH Tukang Batu 110,000.00 15,950.00
L.03 0.15 OH Kepala Tukang 125,000.00 18,750.00
L.04 0.1 OH Mandor 150,000.00 15,000.00
B Bahan 565,010.00
1.2 Buah Wastafel Putih 421,000.00 505,200.00
0.12 - Perlengkapan 30% Harga Wastafel 50,520.00
6 Kg Portland Semen 1,340.00 8,040.00
0.01 m3 Pasir Beton 125,000.00 1,250.00
C PERALATAN
D Jumlah A + B + C 728,710.00
E Overhead & Profit 18.5% 134,811.35
F Harga Satuan Pekerjaan (D+E) 863,521.35

5 A.5.1.1.6 1 Unit Pemasangan Bathcuip porselen 2,428,598.25

375635176.xls116/79 abk 10-14-sanitasi


file:///conversion/tmp/scratch/375635176.xls

HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH JUMLAH
Rp Rp
A Tenaga 99,450.00
L.01 0.075 OH Pekerja 95,000.00 7,125.00
L.02 0.75 OH Tukang Batu 110,000.00 82,500.00
L.03 0.075 OH Kepala Tukang 125,000.00 9,375.00
L.04 0.003 OH Mandor 150,000.00 450.00

B Bahan 1,950,000.00
1 Buah Batchuip 1,750,000.00 1,750,000.00
0.2 - Perlengkapan 20% Harga Bathcuip 1,000,000.00 200,000.00
C PERALATAN
D Jumlah A + B + C 2,049,450.00
E Overhead & Profit 18.5% 379,148.25
F Harga Satuan Pekerjaan (D+E) 2,428,598.25

6 A.5.1.1.7 1 Unit Pemasangan Bak Fibreglass vol.1 m3 1,615,925.25


A Tenaga 921,250.00

L.01 3 OH Pekerja 95,000.00 285,000.00


L.02 4.5 OH Tukang Batu 110,000.00 495,000.00
L.03 0.05 OH Kepala Tukang 125,000.00 6,250.00
L.04 0.9 OH Mandor 150,000.00 135,000.00
B Tukang Batu 442,400.00
1 Buah Bak Fibreglass 395,000.00 395,000.00
0.12 - Perlengkapan 12% Bak Fibreglass 395,000.00 47,400.00
C PERALATAN
D Jumlah A + B + C 1,363,650.00
E Overhead & Profit 18.5% 252,275.25
F Harga Satuan Pekerjaan (D+E) 1,615,925.25

7 A.5.1.1.8 1 Unit Memasang Bak Mandi Batu Bata Vol. 0,30 m3 1,492,957.80
A Tenaga 942,000.00
L.01 6.00 OH Pekerja 95,000.00 570,000.00
L.02 3.00 OH Tukang Batu 110,000.00 330,000.00
L.03 0.30 OH Kepala Tukang 125,000.00 37,500.00
L.04 0.03 OH Mandor 150,000.00 4,500.00
B Bahan 317,880.00
150.0 bh Batu Bata 550.00 82,500.00
120 Kg Portland Semen 11.0% 1,340.00 160,800.00
0.3 m3 Pasir Beton 1.2% 125,000.00 37,500.00
36 buah Porselen 11 x 11 cm 8264.5% 196.67 7,080.00
6 Kg Semen Nat 5,000.00 30,000.00
C PERALATAN
D Jumlah A + B + C 1,259,880.00
E Overhead & Profit 18.5% 233,077.80
F Harga Satuan Pekerjaan (D+E) 1,492,957.80

8 A.5.1.1.12 1 buah Pemasangan Bak Cuci Piring Stainless stell 310,292.25


A Tenaga 41,850.00
L.01 0.030 OH Pekerja 95,000.00 2,850.00
L.02 0.300 OH Tukang Batu 110,000.00 33,000.00
L.03 0.030 OH Kepala Tukang 125,000.00 3,750.00
L.04 0.015 OH Mandor 150,000.00 2,250.00
B Bahan 220,000.00
1 unit Bak Cuci Piring 160,000.00 160,000.00
1 bh Water drain 60,000.00 60,000.00
C PERALATAN
D Jumlah A + B + C 261,850.00
E Overhead & Profit 18.5% 48,442.25
F Harga Satuan Pekerjaan (D+E) 310,292.25

9 A.5.1.1.14 1 buah Pemasangan Floor Drain 164,655.75


A Tenaga 13,950.00
L.01 0.010 OH Pekerja 95,000.00 950.00
L.02 0.100 OH Tukang Batu 110,000.00 11,000.00
L.03 0.010 OH Kepala Tukang 125,000.00 1,250.00
L.04 0.005 OH Mandor 150,000.00 750.00

375635176.xls116/80 abk 10-14-sanitasi


file:///conversion/tmp/scratch/375635176.xls

HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH JUMLAH
Rp Rp
B Bahan 125,000.00
1 bh Floor Drain Stainless 125,000.00 125,000.00

C PERALATAN
D Jumlah A + B + C 138,950.00
E Overhead & Profit 18.5% 25,705.75
F Harga Satuan Pekerjaan (D+E) 164,655.75

10 A.5.1.1.15 1 bh Pemasangan Bak Kontrol Pas.Batu Bata 30x30 tinggi 35 cm 505,615.80


A Tenaga 295,050.00
L.01 2.160 OH Pekerja 95,000.00 205,200.00
L.02 0.720 OH Tukang Batu 110,000.00 79,200.00
L.03 0.072 OH Kepala Tukang 125,000.00 9,000.00
L.04 0.011 OH Mandor 150,000.00 1,650.00
B Bahan 131,630.00
40.00 bh Batu Bata 550.00 22,000.00
44.00 kg Semen Portland 1,340.00 58,960.00
0.07 m3 Pasir Pasang 95,000.00 6,650.00
0.06 m3 Pasir Beton 125,000.00 7,500.00
0.07 m3 Kerikil 236,000.00 16,520.00
1.60 kg Baja Tulangan 12,500.00 20,000.00
C PERALATAN
D Jumlah A + B + C 426,680.00
E Overhead & Profit 18.5% 78,935.80
F Harga Satuan Pekerjaan (D+E) 505,615.80

11 A.5.1.1.16 1 bh Pemasangan Bak Kontrol Pas.Batu Bata 45 x 45 tinggi 50 cm 754,578.38


A Tenaga 434,275.00
L.01 3.200 OH Pekerja 95,000.00 304,000.00
L.02 1.150 OH Tukang Batu 110,000.00 126,500.00
L.03 0.011 OH Kepala Tukang 125,000.00 1,375.00
L.04 0.016 OH Mandor 150,000.00 2,400.00
B Bahan 202,500.00
70.00 bh Batu Bata 550.00 38,500.00
77.00 kg Semen Portland 1,340.00 103,180.00
0.13 m3 Pasir Pasang 95,000.00 12,350.00
0.09 m3 Pasir Beton 125,000.00 11,250.00
0.02 m3 Kerikil 236,000.00 4,720.00
2.60 kg Baja Tulangan 12,500.00 32,500.00
C PERALATAN
D Jumlah A + B + C 636,775.00
E Overhead & Profit 18.5% 117,803.38
F Harga Satuan Pekerjaan (D+E) 754,578.38

12 A.5.1.1.17 1 bh Pemasangan Bak Kontrol Pas.Batu Bata 60x60 tinggi 60 cm 895,359.93


A Tenaga 434,275.00
L.01 3.200 OH Pekerja 95,000.00 304,000.00
L.02 1.150 OH Tukang Batu 110,000.00 126,500.00
L.03 0.011 OH Kepala Tukang 125,000.00 1,375.00
L.04 0.016 OH Mandor 150,000.00 2,400.00
B Bahan 321,303.00
123.00 bh Batu Bata 550.00 67,650.00
114.00 kg Semen Portland 1,340.00 152,760.00
0.184 m3 Pasir Pasang 95,000.00 17,480.00
0.12 m3 Pasir Beton 125,000.00 15,000.00
0.033 m3 Kerikil 236,000.00 7,788.00
4.85 kg Baja Tulangan 12,500.00 60,625.00
C PERALATAN
D Jumlah A + B + C 755,578.00
E Overhead & Profit 18.5% 139,781.93
F Harga Satuan Pekerjaan (D+E) 895,359.93

13 A.5.1.1.18 1 m' Pemasangan Pipa Galvanis Ø ½" 66,800.43


A Tenaga 20,205.00

375635176.xls116/81 abk 10-14-sanitasi


file:///conversion/tmp/scratch/375635176.xls

HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH JUMLAH
Rp Rp
L.01 0.054 OH Pekerja 95,000.00 5,130.00
L.02 0.090 OH Tukang Batu 110,000.00 9,900.00
L.03 0.009 OH Kepala Tukang 125,000.00 1,125.00
L.04 0.027 OH Mandor 150,000.00 4,050.00
B Bahan 36,166.67
1.20 m' Pipa Galvanis Ø ½" 23,333.33 28,000.00
0.35 Ls Perlengkapan 35% x pipa 23,333.33 8,166.67
C PERALATAN
D Jumlah A + B + C 56,371.67
E Overhead & Profit 18.5% 10,428.76
F Harga Satuan Pekerjaan (D+E) 66,800.43

14 A.5.1.1.19a 1 bh Pemasangan Kran Ø ½" atau Ø ¾" 295,005.75


A Tenaga 50,700.00
L.01 0.010 OH Pekerja 95,000.00 950.00
L.02 0.400 OH Tukang Batu 110,000.00 44,000.00
L.03 0.040 OH Kepala Tukang 125,000.00 5,000.00
L.04 0.005 OH Mandor 150,000.00 750.00
B Bahan 198,250.00
1.00 bh Kran Air 198,000.00 198,000.00
0.0250 bh Sealtape 10,000.00 250.00
C PERALATAN
D Jumlah A + B + C 248,950.00
E Overhead & Profit 18.5% 46,055.75
F Harga Satuan Pekerjaan (D+E) 295,005.75

15 A.5.1.1.19b 1 bh Pemasangan Kran Ø ½" atau Ø ¾" 327,000.75


A Tenaga 50,700.00
L.01 0.010 OH Pekerja 95,000.00 950.00
L.02 0.400 OH Tukang Batu 110,000.00 44,000.00
L.03 0.040 OH Kepala Tukang 125,000.00 5,000.00
L.04 0.005 OH Mandor 150,000.00 750.00
B Bahan 225,250.00
1.00 bh Kran Air 225,000.00 225,000.00
0.0250 bh Sealtape 10,000.00 250.00
C PERALATAN
D Jumlah A + B + C 275,950.00
E Overhead & Profit 18.5% 51,050.75
F Harga Satuan Pekerjaan (D+E) 327,000.75

16 A.5.1.1.19c 1 m' Pemasangan Shower 409,660.43


A Tenaga 20,205.00
L.01 0.054 OH Pekerja 95,000.00 5,130.00
L.02 0.090 OH Tukang Batu 110,000.00 9,900.00
L.03 0.009 OH Kepala Tukang 125,000.00 1,125.00
L.04 0.027 OH Mandor 150,000.00 4,050.00
B Bahan 325,500.00
1.20 m' Shower 210,000.00 252,000.00
0.35 Ls Perlengkapan 35% x pipa 210,000.00 73,500.00
C PERALATAN
D Jumlah A + B + C 345,705.00
E Overhead & Profit 18.5% 63,955.43
F Harga Satuan Pekerjaan (D+E) 409,660.43

17 A.5.1.1.20 1 m' Pemasangan Pipa Galvanis Ø ¾" 82,106.68


A Tenaga 20,205.00
L.01 0.054 OH Pekerja 95,000.00 5,130.00
L.02 0.090 OH Tukang Batu 110,000.00 9,900.00
L.03 0.009 OH Kepala Tukang 125,000.00 1,125.00
L.04 0.027 OH Mandor 150,000.00 4,050.00
B Bahan 49,083.33
1.20 m' Pipa Galvanis Ø ¾" 31,666.67 38,000.00
0.35 Ls Perlengkapan 35% x pipa 31,666.67 11,083.33
C PERALATAN

375635176.xls116/82 abk 10-14-sanitasi


file:///conversion/tmp/scratch/375635176.xls

HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH JUMLAH
Rp Rp
D Jumlah A + B + C 69,288.33
E Overhead & Profit 18.5% 12,818.34
F Harga Satuan Pekerjaan (D+E) 82,106.68

18 A.5.1.1.21 1 m' Pemasangan Pipa Galvanis Ø 1" 72,922.93


A Tenaga 20,205.00
L.01 0.054 OH Pekerja 95,000.00 5,130.00
L.02 0.090 OH Tukang Batu 110,000.00 9,900.00
L.03 0.009 OH Kepala Tukang 125,000.00 1,125.00
L.04 0.027 OH Mandor 150,000.00 4,050.00
B Bahan 41,333.33
1.20 m' Pipa Galvanis Ø 1" 26,666.67 32,000.00
0.35 Ls Perlengkapan 35% x pipa 26,666.67 9,333.33
C PERALATAN
D Jumlah A + B + C 61,538.33
E Overhead & Profit 18.5% 11,384.59
F Harga Satuan Pekerjaan (D+E) 72,922.93

19 A.5.1.1.22 1 m' Pemasangan Pipa Galvanis Ø 1½ " 106,523.60


A Tenaga 33,060.00
L.01 0.108 OH Pekerja 95,000.00 10,260.00
L.02 0.180 OH Tukang Batu 110,000.00 19,800.00
L.03 0.018 OH Kepala Tukang 125,000.00 2,250.00
L.04 0.005 OH Mandor 150,000.00 750.00
B Bahan 56,833.33
1.20 m' Pipa Galvanis Ø 1½" 36,666.67 44,000.00
0.35 Ls Perlengkapan 35% x pipa 36,666.67 12,833.33
C PERALATAN

375635176.xls116/83 abk 10-14-sanitasi


file:///conversion/tmp/scratch/375635176.xls

HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH JUMLAH
Rp Rp
D Jumlah A + B + C 89,893.33
E Overhead & Profit 18.5% 16,630.27
F Harga Satuan Pekerjaan (D+E) 106,523.60

20 A.5.1.1.23 1 m' Pemasangan Pipa Galvanis Ø 3" 186,933.75


A Tenaga 41,500.00
L.01 0.135 OH Pekerja 95,000.00 12,825.00
L.02 0.225 OH Tukang Batu 110,000.00 24,750.00
L.03 0.023 OH Kepala Tukang 125,000.00 2,875.00
L.04 0.007 OH Mandor 150,000.00 1,050.00
B Bahan 116,250.00
1.20 m' Pipa Galvanis Ø 3" 75,000.00 90,000.00
0.35 Ls Perlengkapan 35% x pipa 75,000.00 26,250.00
C PERALATAN
D Jumlah A + B + C 157,750.00
E Overhead & Profit 18.5% 29,183.75
F Harga Satuan Pekerjaan (D+E) 186,933.75

21 A.5.1.1.24 1 m' Pemasangan Pipa Galvanis Ø 4" 310,914.38


A Tenaga 41,500.00
L.01 0.135 OH Pekerja 95,000.00 12,825.00
L.02 0.225 OH Tukang Batu 110,000.00 24,750.00
L.03 0.023 OH Kepala Tukang 125,000.00 2,875.00
L.04 0.007 OH Mandor 150,000.00 1,050.00
B Bahan 220,875.00
1.20 m' Pipa Galvanis Ø 4" 142,500.00 171,000.00
0.35 Ls Perlengkapan 35% x pipa 142,500.00 49,875.00
C PERALATAN
D Jumlah A + B + C 262,375.00
E Overhead & Profit 18.5% 48,539.38
F Harga Satuan Pekerjaan (D+E) 310,914.38

22 A.5.1.1.25 1 m' Pemasangan Pipa PVC tipe AW Ø ½" 21,842.51


A Tenaga 11,070.00
L.01 0.036 OH Pekerja 95,000.00 3,420.00
L.02 0.060 OH Tukang Batu 110,000.00 6,600.00
L.03 0.006 OH Kepala Tukang 125,000.00 750.00
L.04 0.002 OH Mandor 150,000.00 300.00
B Bahan 7,362.50
1.20 m' Pipa PVC Ø ½" 4,750.00 5,700.00
0.35 Ls Perlengkapan 35% x pipa 4,750.00 1,662.50
C PERALATAN
D Jumlah A + B + C 18,432.50
E Overhead & Profit 18.5% 3,410.01
F Harga Satuan Pekerjaan (D+E) 21,842.51

23 A.5.1.1.26 1 m' Pemasangan Pipa PVC tipe AW Ø ¾" 21,842.51


A Tenaga 11,070.00
L.01 0.036 OH Pekerja 95,000.00 3,420.00
L.02 0.060 OH Tukang Batu 110,000.00 6,600.00
L.03 0.006 OH Kepala Tukang 125,000.00 750.00
L.04 0.002 OH Mandor 150,000.00 300.00
B Bahan 7,362.50
1.20 m' Pipa PVC Ø ¾" Wavin 4,750.00 5,700.00
0.35 Ls Perlengkapan 35% x pipa 4,750.00 1,662.50
C PERALATAN
D Jumlah A + B + C 18,432.50
E Overhead & Profit 18.5% 3,410.01
F Harga Satuan Pekerjaan (D+E) 21,842.51

24 A.5.1.1.27 1 m' Pemasangan Pipa PVC tipe AW Ø 1" 27,811.95


A Tenaga 11,070.00
L.01 0.036 OH Pekerja 95,000.00 3,420.00
L.02 0.060 OH Tukang Batu 110,000.00 6,600.00

375635176.xls116/84 abk 10-14-sanitasi


file:///conversion/tmp/scratch/375635176.xls

HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH JUMLAH
Rp Rp
L.03 0.006 OH Kepala Tukang 125,000.00 750.00
L.04 0.002 OH Mandor 150,000.00 300.00
B Bahan 12,400.00
1.20 m' Pipa PVC Ø 1" 8,000.00 9,600.00
0.35 Ls Perlengkapan 35% x pipa 8,000.00 2,800.00
C PERALATAN
D Jumlah A + B + C 23,470.00
E Overhead & Profit 18.5% 4,341.95
F Harga Satuan Pekerjaan (D+E) 27,811.95

25 A.5.1.1.28 1 m' Pemasangan Pipa PVC tipe AW Ø 1½" 36,513.80


A Tenaga 16,605.00
L.01 0.054 OH Pekerja 95,000.00 5,130.00
L.02 0.090 OH Tukang Batu 110,000.00 9,900.00
L.03 0.009 OH Kepala Tukang 125,000.00 1,125.00
L.04 0.003 OH Mandor 150,000.00 450.00
B Bahan 14,208.33
1.20 m' Pipa PVC Ø 1½" 9,166.67 11,000.00
0.35 Ls Perlengkapan 35% x pipa 9,166.67 3,208.33
C PERALATAN
D Jumlah A + B + C 30,813.33
E Overhead & Profit 18.5% 5,700.47
F Harga Satuan Pekerjaan (D+E) 36,513.80

26 A.5.1.1.29 1 m' Pemasangan Pipa PVC tipe AW Ø 2" 67,432.43


A Tenaga 16,605.00
L.01 0.054 OH Pekerja 95,000.00 5,130.00
L.02 0.090 OH Tukang Batu 110,000.00 9,900.00
L.03 0.009 OH Kepala Tukang 125,000.00 1,125.00
L.04 0.003 OH Mandor 150,000.00 450.00
B Bahan 40,300.00
1.20 m' Pipa PVC Ø 2" 26,000.00 31,200.00
0.35 Ls Perlengkapan 35% x pipa 26,000.00 9,100.00
C PERALATAN
D Jumlah A + B + C 56,905.00
E Overhead & Profit 18.5% 10,527.43
F Harga Satuan Pekerjaan (D+E) 67,432.43

27 A.5.1.1.31 1 m' Pemasangan Pipa PVC tipe AW Ø 3" 76,875.89


A Tenaga 24,832.50
L.01 0.081 OH Pekerja 95,000.00 7,695.00
L.02 0.135 OH Tukang Batu 110,000.00 14,850.00
L.03 0.0135 OH Kepala Tukang 125,000.00 1,687.50
L.04 0.004 OH Mandor 150,000.00 600.00
B Bahan 40,041.67
1.20 m' Pipa PVC Ø 3" AW 25,833.33 31,000.00
0.35 Ls Perlengkapan 35% x pipa 25,833.33 9,041.67
C PERALATAN
D Jumlah A + B + C 64,874.17
E Overhead & Profit 18.5% 12,001.72
F Harga Satuan Pekerjaan (D+E) 76,875.89

28 A.5.1.1.32 1 m' Pemasangan Pipa PVC tipe AW Ø 4" 108,100.64


A Tenaga 24,832.50
L.01 0.081 OH Pekerja 95,000.00 7,695.00
L.02 0.135 OH Tukang Batu 110,000.00 14,850.00
L.03 0.014 OH Kepala Tukang 125,000.00 1,687.50
L.04 0.004 OH Mandor 150,000.00 600.00
B Bahan 66,391.67
1.20 m' Pipa PVC Ø 4" 42,833.33 51,400.00
0.35 Ls Perlengkapan 35% x pipa 42,833.33 14,991.67
C PERALATAN
D Jumlah A + B + C 91,224.17
E Overhead & Profit 18.5% 16,876.47

375635176.xls116/85 abk 10-14-sanitasi


file:///conversion/tmp/scratch/375635176.xls

HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH JUMLAH
Rp Rp
F Harga Satuan Pekerjaan (D+E) 108,100.64

29 A.5.1.1.40 1 m' Pemasangan Water Heater 2,595,392.93


A Tenaga 20,205.00
L.01 0.054 OH Pekerja 95,000.00 5,130.00
L.02 0.090 OH Tukang Batu 110,000.00 9,900.00
L.03 0.009 OH Kepala Tukang 125,000.00 1,125.00
L.04 0.027 OH Mandor 150,000.00 4,050.00
B Bahan 2,170,000.00
1.20 m' Water Heater 1,400,000.00 1,680,000.00
0.35 Ls Perlengkapan 35% x pipa 1,400,000.00 490,000.00
C PERALATAN
D Jumlah A + B + C 2,190,205.00
E Overhead & Profit 18.5% 405,187.93
F Harga Satuan Pekerjaan (D+E) 2,595,392.93

375635176.xls116/86 abk 10-14-sanitasi


file:///conversion/tmp/scratch/375635176.xls

HARGA
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN BAHAN/UPAH JUMLAH
Rp Rp

XI A.4.2.1 HARGA SATUAN PEKERJAAN BESI & ALLUMUNIUM


1 A.4.2.1.1 1 Kg Pemasangan Besi Profil 31,532.85
A Tenaga 13,500.00
L.01 0.06 OH Pekerja 95,000.00 5,700.00
L.02 0.06 OH Tukang Besi 110,000.00 6,600.00
L.03 0.006 OH Kepala Tukang 125,000.00 750.00
L.04 0.003 OH Mandor 150,000.00 450.00
B Bahan 13,110.00
1.15 Kg Besi Profil 11,400.00 13,110.00

C PERALATAN
D Jumlah A + B + C 26,610.00
E Overhead & Profit 18.5% 4,922.85

F Harga Satuan Pekerjaan (D+E) 31,532.85


Overhead & Profit (contoh 10%)

2 A.4.2.1.2 1 kg Pemasangan Rangka Kuda-kuda Baja IWF 31,532.85

A Tenaga 13,500.00
L.01 0.06 OH Pekerja 95,000.00 5,700.00
L.02 0.06 OH Tukang Besi 110,000.00 6,600.00
L.03 0.006 OH Kepala Tukang 125,000.00 750.00
L.04 0.003 OH Mandor 150,000.00 450.00

B Bahan 13,110.00
1.15 kg Besi Baja IWF 11,400.00 13,110.00
C PERALATAN
D Jumlah A + B + C 26,610.00
E Overhead & Profit 18.5% 4,922.85
F Harga Satuan Pekerjaan (D+E) 31,532.85

3 A.4.2.1.3 100 kg Pengerjaan Pekerjaan Perakitan (Kuda-kuda Baja) 152,693.18


A Tenaga 21,375.00
L.01 0.100 OH Pekerja 95,000.00 9,500.00
L.02 0.100 OH Tukang Besi 110,000.00 11,000.00
L.03 0.001 OH Kepala Tukang 125,000.00 125.00
L.04 0.005 OH Mandor 150,000.00 750.00
B Bahan 11,480.00
1 ltr Solar 9,130.00 9,130.00

0.1 ltr Minyak Pelumas 23,500.00 2,350.00


C PERALATAN 96,000
0.800 jam Sewa Alat 120,000 96,000

D Jumlah A + B + C 128,855.00
E Overhead & Profit 18.5% 23,838.18
F Harga Satuan Pekerjaan (D+E) 152,693.18

4 A.4.2.1.4 1 m2 Pembuatan Pintu Besi Plat Baja tebal 2 mm rangkap, rangka baja Siku 975,497.93
A Tenaga 236,175.00
L.01 1.05 OH Pekerja 95,000.00 99,750.00
L.02 1.05 OH Tukang Besi 110,000.00 115,500.00
L.03 0.105 OH Kepala Tukang 125,000.00 13,125.00
L.04 0.052 OH Mandor 150,000.00 7,800.00
B Bahan 587,030.00
15 Kg Besi Siku L.30.30.3 11,400.00 171,000.00
32.8 Kg Besi Plat Baja 12,600.00 413,280.00
0.05 Kg Kawat Las 55,000.00 2,750.00
C PERALATAN
D Jumlah A + B + C 823,205.00

E Overhead & Profit 18.5% 152,292.93


F Harga Satuan Pekerjaan (D+E) 975,497.93

375635176.xls 116/87 abk 11-14-besi almnium


file:///conversion/tmp/scratch/375635176.xls

HARGA
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN BAHAN/UPAH JUMLAH
Rp Rp

5 A.4.2.1.5 10 cm Pengerjaan Pengelasan dengan Las Listrik 52,274.39


A Tenaga 6,550.00
L.01 0.04 OH Pekerja 95,000.00 3,800.00
L.02 0.02 OH Tukang Besi 110,000.00 2,200.00
L.03 0.002 OH Kepala Tukang 125,000.00 250.00
L.04 0.002 OH Mandor 150,000.00 300.00
B Bahan 3,413.90
0.04 kg Kawat Las 55,000.00 2,200.00

0.03 ltr Solar 9,130.00 273.90


0.04 ltr Minyak Pelumas 23,500.00 940.00
C PERALATAN 34,150
0.170 jam Sewa Alat 200,879 34,150

D Jumlah A + B + C 44,113.41
E Overhead & Profit 18.5% 8,160.98
F Harga Satuan Pekerjaan (D+E) 52,274.39

6 A.4.2.1.8 1 m2 Pemasangan Pintu Lipat (Folding Door) 3,376,065.00


A Tenaga 99,000.00
L.01 0.44 OH Pekerja 95,000.00 41,800.00
L.02 0.44 OH Tukang Besi 110,000.00 48,400.00
L.03 0.044 OH Kepala Tukang 125,000.00 5,500.00
L.04 0.022 OH Mandor 150,000.00 3,300.00
B Bahan 2,750,000.00
1 m2 Pintu Lipat 2,750,000.00 2,750,000.00
C PERALATAN
D Jumlah A + B + C 2,849,000.00
E Overhead & Profit 18.5% 527,065.00
F Harga Satuan Pekerjaan (D+E) 3,376,065.00

7 A.4.2.1.11 1 m' Pemasangan Kusen Pintu Allumunium 78,447.99


A Tenaga 9,667.50
L.01 0.043 OH Pekerja 95,000.00 4,085.00
L.02 0.043 OH Tukang Besi 110,000.00 4,730.00
L.03 0.0043 OH Kepala Tukang 125,000.00 537.50
L.04 0.0021 OH Mandor 150,000.00 315.00

B Bahan 56,533.34
1.1 m' Profil Allumunium 46,666.67 51,333.34
2 buah Skrup Fixer 800.00 1,600.00

0.06 Tube Sealant 60,000.00 3,600.00


C PERALATAN
D Jumlah A + B + C 66,200.84

E Overhead & Profit 18.5% 12,247.15


F Harga Satuan Pekerjaan (D+E) 78,447.99

8 A.4.2.1.12 1 m2 Pemasangan Pintu Allumunium Strip Lebar 8 cm 352,479.25


A Tenaga 19,117.50
L.01 0.085 OH Pekerja 95,000.00 8,075.00
L.02 0.085 OH Tukang Besi 110,000.00 9,350.00
L.03 0.0085 OH Kepala Tukang 125,000.00 1,062.50
L.04 0.0042 OH Mandor 150,000.00 630.00
B Bahan 278,333.35

4.4 m' Profil Allumunium 46,666.67 205,333.35


14.6 m' Allumunium Strip 5,000.00 73,000.00
C PERALATAN

D Jumlah A + B + C 297,450.85
E Overhead & Profit 18.5% 55,028.41
F Harga Satuan Pekerjaan (D+E) 352,479.25

375635176.xls 116/88 abk 11-14-besi almnium


file:///conversion/tmp/scratch/375635176.xls

HARGA
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN BAHAN/UPAH JUMLAH
Rp Rp
9 A.4.2.1.13 1 m2 Pemasangan Pintu Kaca Rangka Allumunium 317,382.52
A Tenaga 19,300.00
L.01 0.085 OH Pekerja 95,000.00 8,075.00
L.02 0.085 OH Tukang Besi 110,000.00 9,350.00
L.03 0.009 OH Kepala Tukang 125,000.00 1,125.00
L.04 0.005 OH Mandor 150,000.00 750.00

B Bahan 248,533.35
4.4 m' Pintu Allumunium 46,666.67 205,333.35
4.5 m' Profil Kaca 6,000.00 27,000.00

0.27 tube Sealant 60,000.00 16,200.00


C PERALATAN
D Jumlah A + B + C 267,833.35
E Overhead & Profit 18.5% 49,549.17

F Harga Satuan Pekerjaan (D+E) 317,382.52

10 A.4.2.1.18 1 m' Pemasangan Talang Datar/Jurai , Seng BJLS 28 Lebar 90 cm 107,331.38

A Tenaga 43,650.00
L.01 0.20 OH Pekerja 95,000.00 19,000.00
L.02 0.2 OH Tukang Kayu 110,000.00 22,000.00

375635176.xls 116/89 abk 11-14-besi almnium


file:///conversion/tmp/scratch/375635176.xls

HARGA
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN BAHAN/UPAH JUMLAH
Rp Rp
L.03 0.020 OH Kepala Tukang 125,000.00 2,500.00
L.04 0.00 OH Mandor 150,000.00 150.00
B Bahan 46,925.00

1.05 Lbr Seng Plaat 19,100.00 20,055.00


0.015 Kg Paku Biasa 1 - 2,5 cm 18,000.00 270.00
0.019 m3 Kayu Papan Klas II atau III 1,400,000.00 26,600.00

C PERALATAN
D Jumlah A + B + C 90,575.00
E Overhead & Profit 18.5% 16,756.38

F Harga Satuan Pekerjaan (D+E) 107,331.38

11 A.4.2.1.19 1 m' Pemasangan Talang 1/2 Lingkaran Ø 15 cm, Seng Plaat BJLS 30 Lebar 45 cm 93,300.98
A Tenaga 52,200.00
L.01 0.15 OH Pekerja 95,000.00 14,250.00
L.02 0.3 OH Tukang Kayu 110,000.00 33,000.00
L.03 0.03 OH Kepala Tukang 125,000.00 3,750.00
L.04 0.008 OH Mandor 150,000.00 1,200.00
B Bahan 26,535.00
1.05 Lbr Seng Plaat 19,100.00 20,055.00

0.01 Kg Paku Biasa 1 - 2,5 cm 18,000.00 180.00


0.5 Kg Besi strip 12,600.00 6,300.00
C PERALATAN
D Jumlah A + B + C 78,735.00
E Overhead & Profit 18.5% 14,565.98
F Harga Satuan Pekerjaan (D+E) 93,300.98

12 A.4.2.1.8 1 m2 Pemasangan Pintu KM/WC Alumunium 455,040.00


A Tenaga 99,000.00
L.01 0.44 OH Pekerja 95,000.00 41,800.00
L.02 0.44 OH Tukang 110,000.00 48,400.00
L.03 0.044 OH Kepala Tukang 125,000.00 5,500.00
L.04 0.022 OH Mandor 150,000.00 3,300.00
B Bahan 285,000.00
1 Unit Pintu Alumunium 285,000.00 285,000.00
C PERALATAN
D Jumlah A + B + C 384,000.00
E Overhead & Profit 18.5% 71,040.00
F Harga Satuan Pekerjaan (D+E) 455,040.00

13 A.4.2.1.20 1 m' Pemasangan rangka Besi Hollow 40.40.3mm 104,342.14


A Tenaga 56,325.00
L.01 0.25 OH Pekerja 95,000.00 23,750.00
L.02 0.25 OH Tukang 110,000.00 27,500.00
L.03 0.025 OH Kepala Tukang 125,000.00 3,125.00
L.04 0.013 OH Mandor 150,000.00 1,950.00
B Bahan 26,500.00
1 Unit Besi Hollow 40.40.3 mm 26,500.00 26,500.00
0.1 m' Assesories 52,274.39 5,227.44
C PERALATAN
D Jumlah A + B + C 88,052.44
E Overhead & Profit 18.5% 16,289.70
F Harga Satuan Pekerjaan (D+E) 104,342.14

14 A.4.6.1.22b 1 m' Pemasangan Listplank PVC 104,738.83


A Tenaga 34,750.00
L.01 0.1 OH Pekerja 95,000.00 9,500.00
L.02 0.2 OH Tukang Kayu 110,000.00 22,000.00
L.03 0.02 OH Kepala Tukang 125,000.00 2,500.00
L.04 0.005 OH Mandor 150,000.00 750.00
B Bahan 53,637.20
0.110 m2 PVC 250,000.00 27,500.00
0.50 Kg Paku 52,274.39 26,137.20

375635176.xls 116/90 abk 11-14-besi almnium


file:///conversion/tmp/scratch/375635176.xls

HARGA
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN BAHAN/UPAH JUMLAH
Rp Rp
C PERALATAN
D Jumlah A + B + C 88,387.20
E Overhead & Profit 18.5% 16,351.63
F Harga Satuan Pekerjaan (D+E) 104,738.83

375635176.xls 116/91 abk 11-14-besi almnium


file:///conversion/tmp/scratch/375635176.xls

HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH JUMLAH
Rp Rp

XII A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI dan KACA


1 A.4.6.2.2 1 Buah Pemasangan Kunci Tanam Biasa 263,010.75
A Tenaga 62,950.00
L.01 0.01 OH Pekerja 95,000.00 950.00
L.02 0.5 OH Tukang Kayu 110,000.00 55,000.00
L.03 0.05 OH Kepala Tukang 125,000.00 6,250.00
L.04 0.005 OH Mandor 150,000.00 750.00
B Bahan 159,000.00
1 Buah Kunci Tanam Biasa 159,000.00 159,000.00
C PERALATAN
D Jumlah A + B + C 221,950.00
E Overhead & Profit 18.5% 41,060.75
F Harga Satuan Pekerjaan (D+E) 263,010.75
Overhead & Profit

2 A.4.6.2.3 1 Buah Pemasangan Kunci Kamar Mandi 150,702.38


A Tenaga 62,175.00
L.01 0.005 OH Pekerja 95,000.00 475.00
L.02 0.5 OH Tukang Kayu 110,000.00 55,000.00
L.03 0.05 OH Kepala Tukang 125,000.00 6,250.00
L.04 0.003 OH Mandor 150,000.00 450.00
B Bahan 65,000.00
1 Buah Kunci Tanam Kamar Mandi 65,000.00 65,000.00
C PERALATAN
D Jumlah A + B + C 127,175.00
E Overhead & Profit 18.5% 23,527.38
F Harga Satuan Pekerjaan (D+E) 150,702.38

3 A.4.6.2.4 1 Buah Pemasangan Kunci Selinder 262,092.38


A Tenaga 62,175.00
L.01 0.005 OH Pekerja 95,000.00 475.00
L.02 0.5 OH Tukang Kayu 110,000.00 55,000.00
L.03 0.05 OH Kepala Tukang 125,000.00 6,250.00
L.04 0.003 OH Mandor 150,000.00 450.00
B Bahan 159,000.00
1 Buah Kunci Selinder 159,000.00 159,000.00
C PERALATAN
D Jumlah A + B + C 221,175.00
E Overhead & Profit 18.5% 40,917.38
F Harga Satuan Pekerjaan (D+E) 262,092.38

4 A.4.6.2.5 1 Buah Pemasangan Engsel Pintu 107,835.00


A Tenaga 21,000.00
L.01 0.015 OH Pekerja 95,000.00 1,425.00
L.02 0.15 OH Tukang Kayu 110,000.00 16,500.00
L.03 0.015 OH Kepala Tukang 125,000.00 1,875.00
L.04 0.008 OH Mandor 150,000.00 1,200.00
B Bahan 70,000.00
1 Buah Engsel pintu 70,000.00 70,000.00
C PERALATAN
D Jumlah A + B + C 91,000.00
E Overhead & Profit 18.5% 16,835.00
F Harga Satuan Pekerjaan (D+E) 107,835.00

5 A.4.6.2.6 1 Buah Pemasangan Engsel Jendela Kupu-kupu 57,205.88


A Tenaga 13,275.00
L.01 0.01 OH Pekerja 95,000.00 950.00
L.02 0.1 OH Tukang Kayu 110,000.00 11,000.00
L.03 0.01 OH Kepala Tukang 125,000.00 1,250.00
L.04 0.0005 OH Mandor 150,000.00 75.00
B Bahan 35,000.00
1 Buah Engsel Jendela 35,000.00 35,000.00

375635176.xls 116/92 abk 12-14-kunci kaca


file:///conversion/tmp/scratch/375635176.xls

HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH JUMLAH
Rp Rp
C PERALATAN
D Jumlah A + B + C 48,275.00
E Overhead & Profit 18.5% 8,930.88
F Harga Satuan Pekerjaan (D+E) 57,205.88

6 A.4.6.2.7 1 Buah Pemasangan Engsel Angin 123,328.88


A Tenaga 34,075.00
L.01 0.10 OH Pekerja 95,000.00 9,500.00
L.02 0.20 OH Tukang Kayu 110,000.00 22,000.00
L.03 0.02 OH Kepala Tukang 125,000.00 2,500.00
L.04 0.0005 OH Mandor 150,000.00 75.00
B Bahan 70,000.00
1 Buah Engsel Angin 70,000.00 70,000.00
C PERALATAN
D Jumlah A + B + C 104,075.00
E Overhead & Profit 18.5% 19,253.88
F Harga Satuan Pekerjaan (D+E) 123,328.88

7 A.4.6.2.9 1 Buah Pemasangan Kait Angin 76,432.50


A Tenaga 21,000.00
L.01 0.015 OH Pekerja 95,000.00 1,425.00
L.02 0.15 OH Tukang Kayu 110,000.00 16,500.00
L.03 0.015 OH Kepala Tukang 125,000.00 1,875.00
L.04 0.008 OH Mandor 150,000.00 1,200.00
B Bahan 43,500.00
1 Buah Kait Angin 43,500.00 43,500.00
C PERALATAN
D Jumlah A + B + C 64,500.00
E Overhead & Profit 18.5% 11,932.50
F Harga Satuan Pekerjaan (D+E) 76,432.50

8 A.4.6.2.10 1 Buah Pasang Door Closer 376,178.25


A Tenaga 66,450.00
L.01 0.05 OH Pekerja 95,000.00 4,750.00
L.02 0.5 OH Tukang Kayu 110,000.00 55,000.00
L.03 0.05 OH Kepala Tukang 125,000.00 6,250.00
L.04 0.0030 OH Mandor 150,000.00 450.00
B Bahan 251,000.00
1 Buah Door Closer 251,000.00 251,000.00
C PERALATAN
D Jumlah A + B + C 317,450.00
E Overhead & Profit 18.5% 58,728.25
F Harga Satuan Pekerjaan (D+E) 376,178.25

9 A.4.6.2.11 1 Buah Pemasangan Kunci Selot 67,011.75


A Tenaga 26,550.00
L.01 0.02 OH Pekerja 95,000.00 1,900.00
L.02 0.2 OH Tukang Kayu 110,000.00 22,000.00
L.03 0.02 OH Kepala Tukang 125,000.00 2,500.00
L.04 0.001 OH Mandor 150,000.00 150.00
B Bahan 30,000.00
1 Buah Kunci Selot 30,000.00 30,000.00
C PERALATAN
D Jumlah A + B + C 56,550.00
E Overhead & Profit 18.5% 10,461.75
F Harga Satuan Pekerjaan (D+E) 67,011.75

10 A.4.6.2.13 1 Buah Pemasangan Door Stop 65,708.25


A Tenaga 13,950.00
L.01 0.01 OH Pekerja 95,000.00 950.00
L.02 0.1 OH Tukang Kayu 110,000.00 11,000.00

375635176.xls 116/93 abk 12-14-kunci kaca


file:///conversion/tmp/scratch/375635176.xls

HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH JUMLAH
Rp Rp
L.03 0.01 OH Kepala Tukang 125,000.00 1,250.00

375635176.xls 116/94 abk 12-14-kunci kaca


file:///conversion/tmp/scratch/375635176.xls

HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH JUMLAH
Rp Rp
L.04 0.0050 OH Mandor 150,000.00 750.00
B Bahan 41,500.00
1 Buah Door Stop 41,500.00 41,500.00
C PERALATAN
D Jumlah A + B + C 55,450.00
E Overhead & Profit 18.5% 10,258.25
F Harga Satuan Pekerjaan (D+E) 65,708.25

11 A.4.6.2.17a 1 m2 Pemasangan Kaca tebal 5 mm 149,096.70


A Tenaga 19,920.00
L.01 0.015 OH Pekerja 95,000.00 1,425.00
L.02 0.15 OH Tukang Kayu 110,000.00 16,500.00
L.03 0.015 OH Kepala Tukang 125,000.00 1,875.00
L.04 0.00080 OH Mandor 150,000.00 120.00
B Bahan 105,900.00
1.1 m2 Kaca tebal 5mm 95,000.00 104,500.00
0.1 Kg Sealent 28,000.00 1,400.00
C PERALATAN
D Jumlah A + B + C 125,820.00
E Overhead & Profit 18.5% 23,276.70
F Harga Satuan Pekerjaan (D+E) 149,096.70

12 A.4.6.2.17b 1 m2 Pemasangan Kaca Reyband 573,397.80


A Tenaga 19,920.00
L.01 0.015 OH Pekerja 95,000.00 1,425.00
L.02 0.15 OH Tukang Kayu 110,000.00 16,500.00
L.03 0.015 OH Kepala Tukang 125,000.00 1,875.00
L.04 0.00080 OH Mandor 150,000.00 120.00
B Bahan 463,960.00
1.1 m2 Kaca Reyband 420,000.00 462,000.00
0.1 Kg Sealent 28,000.00 1,960.00
C PERALATAN
D Jumlah A + B + C 483,880.00
E Overhead & Profit 18.5% 89,517.80
F Harga Satuan Pekerjaan (D+E) 573,397.80

375635176.xls 116/95 abk 12-14-kunci kaca


file:///conversion/tmp/scratch/375635176.xls

HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH JUMLAH
Rp Rp

XIII A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI dan DINDING


1 A.4.4.3.39 1 m' Pemasangan Plint Keramik Ukuran 10x20 cm 32,768.33

A Tenaga 20,325.00
L.01 0.09 OH Pekerja 95,000.00 8,550.00
L.02 0.09 OH Tukang Batu 110,000.00 9,900.00
L.03 0.009 OH Kepala Tukang 125,000.00 1,125.00
L.04 0.005 OH Mandor 150,000.00 750.00
B Bahan 7,327.60
5.3 Buah Keramik 10 x 20 cm 1,000.00 5,300.00
file:///conversion/tmp/scratch/375635176.xls

HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH JUMLAH
Rp Rp
1.14 Kg Portland Semen 1,340.00 1,527.60

0.025 Kg Semen warna 5,000.00 125.00


0.003 m3 Pasir Beton 125,000.00 375.00
C PERALATAN

D Jumlah A + B + C 27,652.60
E Overhead & Profit 18.5% 5,115.73
F Harga Satuan Pekerjaan (D+E) 32,768.33

2 A.4.4.3.36 1 m2 Pemasangan Lantai Keramik 20 x 20 cm 242,718.81


A Tenaga 114,625.00
L.01 0.70 OH Pekerja 95,000.00 66,500.00
file:///conversion/tmp/scratch/375635176.xls

HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH JUMLAH
Rp Rp
L.02 0.35 OH Tukang Batu 110,000.00 38,500.00
L.03 0.035 OH Kepala Tukang 125,000.00 4,375.00
L.04 0.035 OH Mandor 150,000.00 5,250.00
B Bahan 90,201.00
26.5 Buah Keramik 20 x 20 cm 2,360.00 62,540.00
10.40 Kg Portland Semen 1,340.00 13,936.00
1.62 Kg Semen Warna 5,000.00 8,100.00
0.045 m3 Pasir Beton 125,000.00 5,625.00
C PERALATAN
D Jumlah A + B + C 204,826.00
E Overhead & Profit 18.5% 37,892.81
F Harga Satuan Pekerjaan (D+E) 242,718.81

3 A.4.4.3.68 1 m' Pemasangan Plint Keramik Ukuran 10x50 cm 61,423.29


A Tenaga 20,325.00
L.01 0.09 OH Pekerja 95,000.00 8,550.00
L.02 0.09 OH Tukang Batu 110,000.00 9,900.00
L.03 0.009 OH Kepala Tukang 125,000.00 1,125.00
L.04 0.005 OH Mandor 150,000.00 750.00
B Bahan 31,509.00
2.3 Buah Keramik 12,818.00 29,481.40
1.14 Kg Portland Semen 1,340.00 1,527.60
0.003 m3 Pasir Beton 125,000.00 375.00
0.025 Kg Semen Warna 5,000.00 125.00
C PERALATAN
D Jumlah A + B + C 51,834.00
E Overhead & Profit 18.5% 9,589.29
F Harga Satuan Pekerjaan (D+E) 61,423.29

4 A.4.4.3.69 1 m2 Pemasangan Lantai Keramik 50 x 50 cm 247,034.99


A Tenaga 114,625.00
L.01 0.70 OH Pekerja 95,000.00 66,500.00
L.02 0.35 OH Tukang Batu 110,000.00 38,500.00
L.03 0.035 OH Kepala Tukang 125,000.00 4,375.00
L.04 0.035 OH Mandor 150,000.00 5,250.00
B Bahan 93,843.35
2 bh Keramik 30,062.50 69,143.75
8.19 Kg Portland Semen 1,340.00 10,974.60
0.045 m3 Pasir Beton 125,000.00 5,625.00
1.62 Kg Semen Warna 5,000.00 8,100.00
C PERALATAN
D Jumlah A + B + C 208,468.35
E Overhead & Profit 18.5% 38,566.64
F Harga Satuan Pekerjaan (D+E) 247,034.99

5 A.4.4.3.70 1 m2 Pemasangan Lantai Granit 60 x 60 cm 460,374.99


A Tenaga 114,625.00
L.01 0.70 OH Pekerja 95,000.00 66,500.00
L.02 0.35 OH Tukang Batu 110,000.00 38,500.00
L.03 0.035 OH Kepala Tukang 125,000.00 4,375.00
L.04 0.035 OH Mandor 150,000.00 5,250.00
B Bahan 273,877.10
1.87 bh Keramik 133,250.00 249,177.50
8.19 Kg Portland Semen 1,340.00 10,974.60
0.045 m3 Pasir Beton 125,000.00 5,625.00
1.62 Kg Semen Warna 5,000.00 8,100.00
C PERALATAN
D Jumlah A + B + C 388,502.10
E Overhead & Profit 18.5% 71,872.89
F Harga Satuan Pekerjaan (D+E) 460,374.99

6 A.4.4.3.53 1 m2 Pemasangan Dinding Keramik 10x20 cm, 271,171.85


A Tenaga 147,375.00
file:///conversion/tmp/scratch/375635176.xls

HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH JUMLAH
Rp Rp
L.01 0.9 OH Pekerja 95,000.00 85,500.00
L.02 0.45 OH Tukang Batu 110,000.00 49,500.00
L.03 0.045 OH Kepala Tukang 125,000.00 5,625.00
L.04 0.045 OH Mandor 150,000.00 6,750.00
B Bahan 81,462.00
53.0 Buah Keramik 1,000.00 53,000.00
9.3 Kg Portland Semen 1,340.00 12,462.00
0.018 m3 Pasir Beton 125,000.00 2,250.00
2.75 Kg Semen Warna 5,000.00 13,750.00
C PERALATAN
D Jumlah A + B + C 228,837.00
E Overhead & Profit 18.5% 42,334.85
F Harga Satuan Pekerjaan (D+E) 271,171.85

7 A.4.4.3.54.a 1 m2 Pemasangan Dinding Keramik 20x25 cm polos 274,667.60


A Tenaga 147,375.00
L.01 0.9 OH Pekerja 95,000.00 85,500.00
L.02 0.45 OH Tukang Batu 110,000.00 49,500.00
L.03 0.045 OH Kepala Tukang 125,000.00 5,625.00
L.04 0.045 OH Mandor 150,000.00 6,750.00
B Bahan 84,412.00
25.00 m2 Keramik 2,400.00 60,000.00
9.3 Kg Portland Semen 1,340.00 12,462.00
0.018 m3 Pasir Beton 125,000.00 2,250.00
1.94 Kg Semen Warna 5,000.00 9,700.00
C PERALATAN
D Jumlah A + B + C 231,787.00
E Overhead & Profit 18.5% 42,880.60
F Harga Satuan Pekerjaan (D+E) 274,667.60

8 A.4.4.3.58 1 m2 Pemasangan Dinding Batu Andesit Bintik 387,785.33


A Tenaga 114,625.00
L.01 0.70 OH Pekerja 95,000.00 66,500.00
L.02 0.35 OH Tukang Batu 110,000.00 38,500.00
L.03 0.035 OH Kepala Tukang 125,000.00 4,375.00
L.04 0.035 OH Mandor 150,000.00 5,250.00
B Bahan 212,620.00
1.10 m2 Batu Lempeng 175,000.00 192,500.00
11.75 Kg Portland Semen 1,340.00 15,745.00
0.035 m3 Pasir Beton 125,000.00 4,375.00
C PERALATAN
D Jumlah A + B + C 327,245.00
E Overhead & Profit 18.5% 60,540.33
F Harga Satuan Pekerjaan (D+E) 387,785.33

9 A.4.4.3.58 1 m2 Pemasangan Dinding Batu Andesit 413,855.33


A Tenaga 114,625.00
L.01 0.70 OH Pekerja 95,000.00 66,500.00
L.02 0.35 OH Tukang Batu 110,000.00 38,500.00
L.03 0.035 OH Kepala Tukang 125,000.00 4,375.00
L.04 0.035 OH Mandor 150,000.00 5,250.00
B Bahan 234,620.00
1.10 m2 Batu Lempeng 195,000.00 214,500.00
11.75 Kg Portland Semen 1,340.00 15,745.00
0.035 m3 Pasir Beton 125,000.00 4,375.00
C PERALATAN
D Jumlah A + B + C 349,245.00
E Overhead & Profit 18.5% 64,610.33
F Harga Satuan Pekerjaan (D+E) 413,855.33

10 A.4.4.3.64 1 m2 Pemasangan Floor Hardener 76,432.50


file:///conversion/tmp/scratch/375635176.xls

HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH JUMLAH
Rp Rp
Tenaga 27,000.00
L.01 0.12 OH Pekerja 95,000.00 11,400.00
L.02 0.12 OH Tukang Batu 110,000.00 13,200.00
L.03 0.012 OH Kepala Tukang 125,000.00 1,500.00
L.04 0.006 OH Mandor 150,000.00 900.00
Bahan 37,500.00
5 kg Floor hardener 7,500.00 37,500.00

C PERALATAN
D Jumlah A + B + C 64,500.00
E Overhead & Profit 18.5% 11,932.50
F Harga Satuan Pekerjaan (D+E) 76,432.50

11 A.4.4.3.65 1 m2 Pemasangan Paving Block 8 cm 276,312.38


Tenaga 105,125.00
0.025 OH Mandor 95,000.00 2,375.00
0.025 OH Kepala Tukang Batu 110,000.00 2,750.00
0.5 OH Pekerja 125,000.00 62,500.00
0.25 OH Tukang Batu 150,000.00 37,500.00
Bahan 128,050.00
1 m2 Paving block 123,300.00 123,300.00
0.05 kg Pasir urug 95,000.00 4,750.00

C PERALATAN
D Jumlah A + B + C 233,175.00
E Overhead & Profit 18.5% 43,137.38
F Harga Satuan Pekerjaan (D+E) 276,312.38

12 A.4.4.3.67 1 m' Pemasangan Paving Kanstin 206,389.08


Tenaga 41,195.00
0.001 OH Mandor 95,000.00 95.00
0.01 OH Kepala Tukang Batu 110,000.00 1,100.00
0.2 OH Pekerja 125,000.00 25,000.00
0.1 OH Tukang batu 150,000.00 15,000.00
Bahan 132,973.00
0.36 zak PC 67,000.00 24,120.00
1 m' Kanstin 104,478.00 104,478.00
0.035 m3 Pasir Beton 125,000 4,375.00
C PERALATAN
D Jumlah A + B + C 174,168.00
E Overhead & Profit 18.5% 32,221.08
F Harga Satuan Pekerjaan (D+E) 206,389.08
file:///conversion/tmp/scratch/375635176.xls

HARGA
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN BAHAN/UPAH JUMLAH
Rp Rp

XIV A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN

1 A.4.7.1.4 1 m2 Pengecatan Bidang Kayu Baru (1 lp Plamuur, 1 lp Cat dasar, 2 Lp Cat Pen 49,470.20
A Tenaga 8,840.00
L.01 0.070 OH Pekerja 95,000.00 6,650.00
L.02 0.009 OH Tukang Cat 110,000.00 990.00
L.03 0.006 OH Kepala Tukang 125,000.00 750.00
L.04 0.003 OH Mandor 150,000.00 450.00
B Bahan 32,907.00
0.2000 kg Cat Menie 45,100.00 9,020.00
0.1500 kg Plamuur 9,300.00 1,395.00
0.1700 kg Cat Dasar 31,000.00 5,270.00
0.2600 kg Cat Penutup 60,200.00 15,652.00
0.0100 bh Kuas 11,000.00 110.00
0.0300 kg Pengencer 26,000.00 780.00
0.2000 lbr Amplas 3,400.00 680.00
C PERALATAN
D Jumlah A + B + C 41,747.00
E Overhead & Profit 18.5% 7,723.20
F Harga Satuan Pekerjaan (D+E) 49,470.20

2 A.4.7.1.5 1 m2 Pengecatan Bidang Kayu Baru (1 lp Plamuur, 1 lp Cat dasar, 3 Lp Cat Pen 68,107.88
A Tenaga 19,150.00
L.01 0.070 OH Pekerja 95,000.00 6,650.00
L.02 0.105 OH Tukang Cat 110,000.00 11,550.00
L.03 0.004 OH Kepala Tukang 125,000.00 500.00
L.04 0.003 OH Mandor 150,000.00 450.00

375635176.xls 116/101 abk 14-14-cat


file:///conversion/tmp/scratch/375635176.xls

HARGA
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN BAHAN/UPAH JUMLAH
Rp Rp
B Bahan 38,325.00
0.2000 kg Cat Menie 45,100.00 9,020.00
0.1500 kg Plamuur 9,300.00 1,395.00
0.1700 kg Cat Dasar 31,000.00 5,270.00
0.3500 kg Cat Penutup 60,200.00 21,070.00
0.0100 bh Kuas 11,000.00 110.00
0.0300 kg Pengencer 26,000.00 780.00
0.2000 lbr Amplas 3,400.00 680.00
C PERALATAN
D Jumlah A + B + C 57,475.00
E Overhead & Profit 18.5% 10,632.88
F Harga Satuan Pekerjaan (D+E) 68,107.88

3 A.4.7.1.6 1 m2 Pelaburan Bidang Kayu dg Teak Oil 40,497.38


A Tenaga 19,055.00
L.01 0.04 OH Pekerja 95,000.00 3,800.00
L.02 0.063 OH Tukang Cat 110,000.00 6,930.00
L.03 0.063 OH Kepala Tukang 125,000.00 7,875.00
L.04 0.0030 OH Mandor 150,000.00 450.00
B Bahan 15,120.00
0.36 Ltr Teak Oil 42,000.00 15,120.00
C PERALATAN
D Jumlah A + B + C 34,175.00
E Overhead & Profit 18.5% 6,322.38
F Harga Satuan Pekerjaan (D+E) 40,497.38

4 A.4.7.1.7 1 m2 Pelaburan Bidang Kayu dg Politur 62,255.16


A Tenaga 12,850.00
L.01 0.04 OH Pekerja 95,000.00 3,800.00
L.02 0.06 OH Tukang Cat 110,000.00 6,600.00
L.03 0.016 OH Kepala Tukang 125,000.00 2,000.00
L.04 0.0030 OH Mandor 150,000.00 450.00
B Bahan 39,686.00
0.15 Ltr Politur 63,000.00 9,450.00
0.372 Ltr Politur Jadi 63,000.00 23,436.00
2 Lbr Ampelas 3,400.00 6,800.00
C PERALATAN
D Jumlah A + B + C 52,536.00
E Overhead & Profit 18.5% 9,719.16
F Harga Satuan Pekerjaan (D+E) 62,255.16

5 A.4.7.1.8 1 m2 Pelaburan Bidang Kayu dg Cat Residu & Ter 13,671.94


A Tenaga 10,400.00
L.01 0.1 OH Pekerja 95,000.00 9,500.00
L.04 0.006 OH Mandor 150,000.00 900.00
B Bahan 1,137.50
0.35 Ltr Residu atau Ter 3,250.00 1,137.50
C PERALATAN
D Jumlah A + B + C 11,537.50
E Overhead & Profit 18.5% 2,134.44
F Harga Satuan Pekerjaan (D+E) 13,671.94

6 A.4.7.1.9 1 m2 Pelaburan Bidang Kayu dg Vernis 47,168.93


A Tenaga 35,250.00
L.01 0.16 OH Pekerja 95,000.00 15,200.00
L.02 0.16 OH Tukang Cat 110,000.00 17,600.00
L.03 0.016 OH Kepala Tukang 125,000.00 2,000.00
L.04 0.0030 OH Mandor 150,000.00 450.00
B Bahan 4,555.00
0.15 Ltr Vernis 25,000.00 3,750.00
0.05 Ltr Dempul 9,300.00 465.00
0.1 Lbr Ampelas 3,400.00 340.00

C PERALATAN

375635176.xls 116/102 abk 14-14-cat


file:///conversion/tmp/scratch/375635176.xls

HARGA
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN BAHAN/UPAH JUMLAH
Rp Rp
D Jumlah A + B + C 39,805.00
E Overhead & Profit 18.5% 7,363.93
F Harga Satuan Pekerjaan (D+E) 47,168.93

7 A.4.7.1.10a 1 m2 Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar, 2lap cat penutup) 50,737.32
2 lap. Cat Penutup)
A Tenaga 10,067.50
L.01 0.02 OH Pekerja 95,000.00 1,900.00
L.02 0.063 OH Tukang Cat 110,000.00 6,930.00
L.03 0.0063 OH Kepala Tukang 125,000.00 787.50
L.04 0.0030 OH Mandor 150,000.00 450.00
B Bahan 32,748.80
0.1 Kg Plamir 16,600.00 1,660.00
0.1 Kg Cat Dasar 33,000.00 3,300.00
0.26 Kg Cat Penutup 2 kali 106,880.00 27,788.80
C PERALATAN
D Jumlah A + B + C 42,816.30
E Overhead & Profit 18.5% 7,921.02
F Harga Satuan Pekerjaan (D+E) 50,737.32

8 A.4.7.1.10b 1 m2 Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar, 2lap cat penutup) 24,739.84
2 lap. Cat Penutup)
A Tenaga 10,067.50
L.01 0.02 OH Pekerja 95,000.00 1,900.00
L.02 0.063 OH Tukang Cat 110,000.00 6,930.00
L.03 0.0063 OH Kepala Tukang 125,000.00 787.50
L.04 0.0030 OH Mandor 150,000.00 450.00
B Bahan 10,810.00
0.1 Kg Plamir 16,600.00 1,660.00
0.1 Kg Cat Dasar 33,000.00 3,300.00
0.26 Kg Cat Penutup 2 kali 22,500.00 5,850.00
C PERALATAN
D Jumlah A + B + C 20,877.50
E Overhead & Profit 18.5% 3,862.34
F Harga Satuan Pekerjaan (D+E) 24,739.84

9 A.4.7.1.16 1 m2 Pengecatan Permukaan Baja dg Meni Besi 35,757.38


A Tenaga 26,775.00
L.01 0.02 OH Pekerja 95,000.00 1,900.00
L.02 0.2 OH Tukang Cat 110,000.00 22,000.00
L.03 0.020 OH Kepala Tukang 125,000.00 2,500.00
L.04 0.0025 OH Mandor 150,000.00 375.00
B Bahan 3,400.00
0.1 Kg Meni Besi 32,900.00 3,290.00
0.01 Kg Kuas 11,000.00 110.00
C PERALATAN
D Jumlah A + B + C 30,175.00
E Overhead & Profit 18.5% 5,582.38
F Harga Satuan Pekerjaan (D+E) 35,757.38

10 A.4.7.1.17 1 m2 Pengecatan Permukaan Baja dg Meni Besi & Perancah 69,959.44


A Tenaga 52,437.50
L.01 0.25 OH Pekerja 95,000.00 23,750.00
L.02 0.225 OH Tukang Cat 110,000.00 24,750.00
L.03 0.0225 OH Kepala Tukang 125,000.00 2,812.50
L.04 0.0075 OH Mandor 150,000.00 1,125.00
B Bahan 6,600.00
0.1 Kg Meni Besi 32,900.00 3,290.00
0.01 Kg Perekat / Lem 11,000.00 110.00
0.002 m3 Perancah Kayu 1,600,000.00 3,200.00
C PERALATAN
D Jumlah A + B + C 59,037.50
E Overhead & Profit 18.5% 10,921.94
F Harga Satuan Pekerjaan (D+E) 69,959.44

375635176.xls 116/103 abk 14-14-cat


file:///conversion/tmp/scratch/375635176.xls

HARGA
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN BAHAN/UPAH JUMLAH
Rp Rp

11 A.4.7.1.18 1 m2 Pengecatan Anti Rayap 65,337.94


A Tenaga 52,437.50
L.01 0.25 OH Pekerja 95,000.00 23,750.00
L.02 0.225 OH Tukang Cat 110,000.00 24,750.00
L.03 0.0225 OH Kepala Tukang 125,000.00 2,812.50
L.04 0.0075 OH Mandor 150,000.00 1,125.00
B Bahan 2,700.00
0.1 Kg Anti Rayap 27,000.00 2,700.00
C PERALATAN
D Jumlah A + B + C 55,137.50
E Overhead & Profit 18.5% 10,200.44
F Harga Satuan Pekerjaan (D+E) 65,337.94

375635176.xls 116/104 abk 14-14-cat


HARGA
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN BAHAN/UPAH JUMLAH
Rp Rp

HARGA SATUAN PEKERJAAN ELEKTRIKAL

1 1 Unit Pemasangan lampu philip 15 watt 52,228.88

A Tenaga 3,775.00
0.01 OH Pekerja 95,000.00 950.00

0.02 OH Tukang Listrik 110,000.00 2,200.00


0.0050 OH Kepala Tukang Listrik 125,000.00 625.00
B Bahan 40,300.00

1.00 Bh Lampu phillip 15 W 40,300.00 40,300.00


C PERALATAN
D Jumlah A + B + C 44,075.00

E Overhead & Profit 18.5% 8153.875


F Harga Satuan Pekerjaan (D+E) 52,228.88

2 1 Unit Pemasangan lampu 25 watt 93,348.38


A Tenaga 3,775.00
0.01 OH Pekerja 95,000.00 950.00

0.02 OH Tukang Listrik 110,000.00 2,200.00


0.0050 OH Kepala Tukang Listrik 125,000.00 625.00
B Bahan 75,000.00
1.00 Bh Lampu SL 25 watt 75,000.00 75,000.00

C PERALATAN
D Jumlah A + B + C 78,775.00
E Overhead & Profit 18.5% 14,573.38

F Harga Satuan Pekerjaan (D+E) 93,348.38

3 1 Unit Pemasangan lampu downlight 105,198.38


A Tenaga 3,775.00
0.01 OH Pekerja 95,000.00 950.00
0.02 OH Tukang Listrik 110,000.00 2,200.00
0.0050 OH Kepala Tukang Listrik 125,000.00 625.00
B Bahan 85,000.00
1.00 Bh Lampu downlight 85,000.00 85,000.00
C PERALATAN
D Jumlah A + B + C 88,775.00
E Overhead & Profit 18.5% 16,423.38
F Harga Satuan Pekerjaan (D+E) 105,198.38

4 1 Unit Pemasangan lampu baret 211,848.38


A Tenaga 3,775.00

0.01 OH Pekerja 95,000.00 950.00


0.02 OH Tukang Listrik 110,000.00 2,200.00
0.0050 OH Kepala Tukang Listrik 125,000.00 625.00
B Bahan 175,000.00
1.00 Bh Lampu baret 175,000.00 175,000.00
C PERALATAN
D HARGA SATUAN PEKERJAAN ELEKTRIKAL 178,775.00
E 0 18.5% 33,073.38
F Harga Satuan Pekerjaan (D+E) 211,848.38

5 1 Unit Pemasangan lampu sorot 359,973.38


A Tenaga 3,775.00

0.01 OH Pekerja 95,000.00 950.00


0.02 OH Tukang Listrik 110,000.00 2,200.00
0.0050 OH Kepala Tukang Listrik 125,000.00 625.00
B Bahan 300,000.00
1.00 Bh Lampu sorot 300,000.00 300,000.00
C PERALATAN
D Overhead & Profit 303,775.00
E Harga Satuan Pekerjaan (D+E) 18.5% 56,198.38
F Harga Satuan Pekerjaan (D+E) 359,973.38

6 1 Unit Pemasangan lampu taman 832,788.38


A Tenaga 3,775.00

0.01 OH Pekerja 95,000.00 950.00


0.02 OH Tukang Listrik 110,000.00 2,200.00
0.0050 OH Kepala Tukang Listrik 125,000.00 625.00
B Bahan 699,000.00
1.00 Bh Lampu taman 699,000.00 699,000.00
C PERALATAN
D Overhead & Profit 702,775.00
E Harga Satuan Pekerjaan (D+E) 18.5% 130,013.38
F Harga Satuan Pekerjaan (D+E) 832,788.38

7 1 Unit Pemasangan lampu gantung 100,729,473.38


A Tenaga 3,775.00

0.01 OH Pekerja 95,000.00 950.00


0.02 OH Tukang Listrik 110,000.00 2,200.00
0.0050 OH Kepala Tukang Listrik 125,000.00 625.00
B Bahan 85,000,000.00
1.00 Bh Lampu gantung 85,000,000.00 85,000,000.00
C PERALATAN
D Jumlah A + B + C 85,003,775.00
E Overhead & Profit 18.5% 15,725,698.38
F Harga Satuan Pekerjaan (D+E) 100,729,473.38

8 1 Titik Pasang stop kontak 178,342.50


A Tenaga 66,000.00

0.05 OH Pekerja 95,000.00 4,750.00

0.50 OH Tukang Listrik 110,000.00 55,000.00

0.0500 OH Kepala Tukang Listrik 125,000.00 6,250.00


B Bahan 84,500.00
15.00 m' Kabel NYA 1x2,5 Sqmm 3,500.00 52,500.00
1.20 btg Pipa pralon 5/8" 12,500.00 15,000.00
1.0000 bh Stop kontak + indoos 17,000.00 17,000.00
C PERALATAN
D Jumlah A + B + C 150,500.00
E Overhead & Profit 18.5% 27,842.50
F Harga Satuan Pekerjaan (D+E) 178,342.50

9 1 Titik Pasang saklar tunggal 104,398.50


A Tenaga 5,500.00
0.05 OH Tukang Listrik 110,000.00 5,500.00
B Bahan 82,600.00
12.00 m' Kabel NYA 1x2,5 Sqmm 3,500.00 42,000.00
2.00 btg Pipa pralon 5/8" 12,500.00 25,000.00
1.0000 bh Saklar tunggal + indoos 15,600.00 15,600.00
C PERALATAN
D Jumlah A + B + C 88,100.00
E Overhead & Profit 18.5% 16,298.50
F Harga Satuan Pekerjaan (D+E) 104,398.50

10 1 Titik Pasang saklar ganda 106,057.50


A Tenaga 5,500.00
0.05 OH Tenaga 110,000.00 5,500.00
B Bahan 84,000.00
12.00 m' Kabel NYA 1x2,5 Sqmm 3,500.00 42,000.00
2.00 btg Pipa pralon 5/8" 12,500.00 25,000.00
1.0000 bh Saklar ganda + indoos 17,000.00 17,000.00
C PERALATAN
D Jumlah A + B + C 89,500.00
E Overhead & Profit 18.5% 16,557.50
F Harga Satuan Pekerjaan (D+E) 106,057.50

11 1 Titik Pasang saklar panel box + MCB 1,079,090.63


A Tenaga 205,625.00
1.00 OH Pekerja 95,000.00 95,000.00
1.00 OH Tukang Listrik 110,000.00 110,000.00
0.0050 OH Kepala Tukang Listrik 125,000.00 625.00
B Bahan 705,000.00
1.00 Bh Panel box + MCB 2A 705,000.00 705,000.00
12.00 btg Kabel NYA 1 x 2,5 Sqmm 3,500.00 42,000.00
1.0000 bh Isolasi 6,000.00 6,000.00
C PERALATAN
D Jumlah A + B + C 910,625.00
E Overhead & Profit 18.5% 168,465.63
F Harga Satuan Pekerjaan (D+E) 1,079,090.63
Penanaman rumput Gajah Mini 1 m2
Dihitung 1.1
Harga Satuan Jumlah Total Harga
No Kebutuhan Satuan Indeks Bahan / Upah (Rp) (Rp)
(Rp)
Bahan Rumput Gajah Mini m2 1 35,000 35,000
Tanah Subur m3 0.25 18,250 4,563
A Pupuk kandang kg 1.5 6,250 9,375

48,938
Tenaga Kerja Pekerja OH 0.05 48,500 2,425
Mandor OH 0.005 65,000 325
B
2,750
Peralatan
C
D Jumlah harga, tenaga, bahan dan peralatan (A + B + C) 51,688
E Ovehead dan Profit 10% x D 5,169
F Jumlah harga per satuan pekerjaan ( D + E) 56,856

Penanaman Kucai Jepang


Dihitung 1.2
Harga Satuan Jumlah Total Harga
No Kebutuhan Satuan Indeks Bahan / Upah (Rp) (Rp)
(Rp)
Bahan Tanaman kucai jepang m2 1 7,000 7,000
Tanah Subur m3 0.025 18,500 463
A Pupuk kandang kg 0.025 6,250 156

7,619
Tenaga Kerja Pekerja OH 0.4 48,500 19,400
Mandor OH 0.04 65,000 2,600
B
22,000
Peralatan
C
D Jumlah harga, tenaga, bahan dan peralatan (A + B + C) 29,619
E Ovehead dan Profit 10% x D 2,962
F Jumlah harga per satuan pekerjaan ( D + E) 32,581

Penanaman Anggrek Tanah


Dihitung 1.3
Harga Satuan Jumlah Total Harga
No Kebutuhan Satuan Indeks Bahan / Upah (Rp) (Rp)
(Rp)
Bahan Anggrek Tanah m2 1 10,000 10,000
Tanah Subur m3 0.025 18,500 463
A Pupuk kandang kg 0.025 6,250 156

10,619
Tenaga Kerja Pekerja OH 0.5 48,500 24,250
Mandor OH 0.05 65,000 3,250
B
27,500
Peralatan
C
D Jumlah harga, tenaga, bahan dan peralatan (A + B + C) 38,119
E Ovehead dan Profit 10% x D 3,812
F Jumlah harga per satuan pekerjaan ( D + E) 41,931

Penanaman Pohon Cemara Lilin


Dihitung 1.4
Harga Satuan Jumlah Total Harga
No Kebutuhan Satuan Indeks Bahan / Upah (Rp) (Rp)
(Rp)
Bahan Pohon Pucuk Merah m2 1 125,000 125,000
Tanah Subur m3 0.05 18,500 925
A Pupuk kandang kg 0.05 6,250 313

126,238
Tenaga Kerja Pekerja OH 0.5 48,500 24,250
Mandor OH 0.05 65,000 3,250
B
27,500
Peralatan
C
D Jumlah harga, tenaga, bahan dan peralatan (A + B + C) 153,738
E Ovehead dan Profit 10% x D 15,374
F Jumlah harga per satuan pekerjaan ( D + E) 169,111
Mata Pembayaran :
Analisa EI-241
VI.003

KAB / KOTA : PALEMBANG


PROP : PROVINSI JAWA TENGAH
ITEM PEMBAYARAN NO. : VI.007
JENIS PEKERJAAN : Galian Biasa

SATUAN PEMBAYARAN : m³

HARGA JUMLAH
PERKIRAAN SATUAN HARGA
No. KOMPONEN SATUAN
KUANTITAS
( Rp. ) ( Rp. )

A. TENAGA
1 @Pekerja / Kenek Upah O.H 0.0218 50,000.00 1,090.00
2 @Mandor / Pengawas Upah O.H 0.0109 72,500.00 790.25
3
4
5
6
JUMLAH HARGA TENAGA 1,880.25

B. BAHAN
1
2
3
4
5
6
7
JUMLAH HARGA BAHAN -

C. PERALATAN
1 Excavator Alat Jam 0.0109 660,000.00 7,194.00
2 Dump Truck Alat Jam 0.0902 420,000.00 37,884.00
3
4
5
6
7
8
Alat Bantu Ls 1.0000 1,000.00 1,000.00
JUMLAH HARGA UPAH 46,078.00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 47,958.25


E. OVERHEAD 10 % x D 4,795.83
F. HARGA SATUAN PEKERJAAN ( D + E ) VI.007 52,754.08
G. DIBULATKAN 53,000.00
TIME SCHEDULE
KABUPATEN : DAERAH ISTIMEWA YOGYAKARTA
LOKASI : KAPLING LEMPONGSARI
NAMA KEGIATAN : PEMBANGUNAN GEDUNG RUMAH TINGGAL
TAHUN ANGGARAN : 2016

BOBOT
NO URAIAN PEKERJAAN PEK. BULAN KE I BULAN KE II BULAN KE III BULAN KE IV
Skala Ket
%
I II III IV I II III IV I II III IV I II III IV
1 2 8
I PEKERJAAN PERSIAPAN
1 Pengukuran dan Pemasangan Bouwplank 0.31 0.31

Pemeliharaan 180 Hari


2 Membersihkan Lapangan dan Perataan 0.26 0.26
3 Pemasangan bowplank 0.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 100
II PEKERJAAN TANAH
1 Menggali Tanah Biasa Sedalam 1 m
a galian tanah pondasi 0.90 0.90
b Galian tanah 0.42 0.42
c galian tanah pondasi batukali 0.01 0.01
2 Pengurugan Kembali 0.16 0.16
3 Urugan Pasir
a urugan pasir bawah pondasi #REF! #REF!
b urugan pasir bawah paving block #REF! #REF!

Pemeliharaan 180 Hari


4 - #REF! #REF!
III PEKERJAAN PONDASI
1 Pemasangan Pondasi Batu Belah 1SP : 5PB
a pondasi untuk bangunan #REF! #REF!
b pondasi untuk pagar 1.43 1.43
2 Urugan sirtu peninggian lantai
a pondasi untuk bangunan 1.50 1.50
b pondasi untuk pagar 0.46 0.46
IV PEKERJAAN PASANGAN DINDING
1 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Teba 4.14 1.38 1.38 1.38
2 #REF! 6.63 2.21 2.21 2.21

Pemeliharaan 180 Hari


3 Pemasangan Dinding Terawang (Rooster) Uk, (12x11x24)c 0.22 0.07 0.07 0.07
V HARGA SATUAN PEKERJAAN PLESTERAN
1 pintu (3) 7.94 7.94
2 Pemasangan Acian 4.64 4.64
3 roster 0.20 0.20
VI PEKERJAAN BETON
1 SLOOF 1
A Memasang Bekisting untuk Sloof 1.71 1.71
B Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, 0.64 0.64
C Pembesian dg Besi Polos 0.98 0.98
2 KOLOM KP (kolom praktis)
A Memasang Bekisting untuk Kolom 4.47 4.47

Pemeliharaan 180 Hari


B Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, 0.69 0.69
C Pembesian dg Besi Polos 1.39 1.39
3 BALOK 1
A Memasang Bekisting untuk Balok 3.50 3.50
B Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, 0.64 0.64
C Pembesian dg Besi Polos 1.23 1.23
4 TOPI-TOPI BETON BERTULANG
A Memasang Bekisting untuk Pondasi 0.19 0.19
B Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, 0.08 0.08
C Pembesian dg Besi Polos 0.11 0.11
5 MEJA DAPUR
A Memasang Bekisting untuk Lantai 0.15 0.15
0.05

Pemeliharaan 180 Hari


B Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, 0.05
C Pembesian dg Besi Polos 0.05 0.05
6 RABAT BETON
A Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, 0.03 0.03
VII PEKERJAAN KAYU
a Memasang bekisting untuk pelat
b Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, 1.68 0.56 0.56 0.56
c Pembesian dg Besi Polos 2.28 0.76 0.76 0.76
11 Memasang dag lantai atas 1.29 0.64 0.64
a Memasang bekisting untuk dag 0.73 0.36 0.64
b Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, 0.90 0.90
c Pembesian dg Besi Polos 5.42 5.42

Pemeliharaan 180 Hari


0 - 0.95 0.95
PEKERJAAN KAYU - 1.67 1.67
VIII PEKERJAAN PENUTUP ATAP
1 pintu jendela (6) 1.72 1.72
2 pintu (3) 0.58 0.58
IX PEKERJAAN BESI & ALLUMUNIUM
1 Pintu KM 0.26 0.26
2 Pembuatan & Pemasangan Pintu & Jendela Kaca Kayu Me 3.50 1.75 1.75
3 jendela (12) 0.44 0.44
X PEKERJAAN PENUTUP LANGIT-LANGIT
1 Pasang trangka plafon hollow galvanis 1.34 1.34

Pemeliharaan 180 Hari


2 Memasang Langit-langit Gypsu Board, Uk (120x240) tebal 0.68 0.68
3 List Langit-Langit Kayu Profil 0.37 0.37 50
XI PEKERJAAN PENUTUP LANTAI dan DINDING
1 Pemasangan Lantai Keramik 40 x 40 cm 2.95 2.95
2 Pemasangan Lantai Keramik 20 x 20 cm 0.29 0.29
3 Pemasangan Dinding Keramik 20x25 cm, 1.83 1.83
4 - 0.15 0.15
5 - 0.09 0.09
6 Pengecat Tembok Eksterior 1.22 1.22
XII PEKERJAAN PENGECATAN
1 Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar 3.10 3.10
Pemeliharaan 180 Hari

2 - 0.51 0.51
XIII PEKERJAAN PENGGANTUNG DAN PENGUNCI
1 Pemasangan Engsel Jendela Kupu-kupu 0.37 0.37
2 Pemasangan Kait Angin 0.10 0.10
3 Pasang Handle pintu 0.13 0.13
4 Pemasangan Grendel Pintu 0.08 0.08
5 Pemasangan Grendel Jendela 0.11 0.11
6 Pemasangan Handle Jendela 0.24 0.24
7 Pemasangan kaca t = 5 mm 0.18 0.18
8 - 0.18 0.18
9 - 0.48 0.48
Pemeliharaan 180 Hari

XIV PEKERJAAN ELEKTRIKAL


1 Titik Lampu 0.75 0.38 0.38
3 Pemasangan lampu baret 0.03 0.01 0.01
4 Pemasangan lampu gantung besar 0.32 0.16 0.16
5 Pasang saklar panel box + MCB 0.34 0.17 0.17
6 Pasang saklar tunggal 0.25 0.12 0.12
7 Pasang stop kontak 0.23 0.12 0.12
8 Pasang saklar ganda 0.07 0.04 0.04
XV PEKERJAAN SANITASI
1 Sumur resapan 0.53 0.53
2 Memasang Closet Duduk / Mono Blok 0.55 0.55
3 Septictank 1.23 1.23
Pemeliharaan 180 Hari

4 Wastafel 0.21 0.21


5 - 0.14 0.14
6 Pemasangan Floor Drain 0.03 0.03
7 Taman pohon kecil 0.16 0.16
8 - 0.21 0.21
9 Pemasangan Bak Kontrol Pas.Batu Bata 60x60 tinggi 60 cm 0.24 0.24
10 - 0.06 0.06
11 Pemasangan Kran Ø ½" atau Ø ¾" 0.07 0.07
12 - 0.28 0.28
13 - 0.18 0.18
14 - 0.35 0.35
15 Pemasangan Pipa PVC tipe AW Ø ¾" 0.20 0.05 0.05 0.05
Pemeliharaan 180 Hari

16 Pemasangan Pipa PVC tipe AW Ø 3" 0.78 0.19 0.19 0.19


17 Pemasangan Pipa PVC tipe AW Ø 4" 0.76 0.25 0.25 0.25

XVI PEKERJAAN LANSCAPE


1 - 0.19 0.19
2 - 0.06 0.06

JUMLAH
PROGRES RENCANA PER MINGGU #REF! #REF! 5.29 7.35 5.37 4.41 5.86 6.75 3.51 1.75 2.75 18.85 11.54 #REF! 6.57 0.25
PROGRESS RENCANA KOMULATIF #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
file:///conversion/tmp/scratch/375635176.xls
DAFTAR HAR GA SAT UAN PE K E R JAAN

D A E R A H PALEMBANG

URAIAN PEKERJAAN HARGA SATUAN


NO. KODE SAT PEKERJAAN
(Rp)

I A. 2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN


1 A.2.2.1.2 Pagar Sementara dari Seng Gelombang Tinggi 2,00 m m' 335,827.82
2 A.2.2.1.4 Pengukuran dan Pemasangan Bouwplank m' 65,720.10
3 A.2.2.1.6 Pembuatan Rumah Jaga (Konstruksi Kayu) m2 970,218.75
4 A.2.2.1.7 Pembuatan Gudang Semen dan Peralatan m2 924,531.08
5 A.2.2.1.9 Membersihkan Lapangan dan Perataan m2 20,145.00
6 A.2.2.1.10 Pembuatan Steger/Perancah dari Bambu m2 429,800.45
7 A.2.2.1.11 Pembuatan Kotak Adukan ukuran 40cmx50cmx25cm bh #REF!

II A.2.3.1 HARGA SATUAN PEKERJAAN TANAH


1 A.2.3.1.1 Menggali Tanah Biasa Sedalam 1 m m3 88,875.00
2 A.2.3.1.2 Menggali Tanah Biasa Sedalam 2 m m3 109,316.25
3 A.2.3.1.3 Menggali Tanah Biasa Sedalam 3 m m3 130,113.00
4 A.2.3.1.4 Menggali Tanah Keras Sedalam 1 m m3 118,263.00
5 A.2.3.1.5 Menggali Tanah Cadas Sedalam 1 m m3 179,527.50
6 A.2.3.1.6 Menggali Tanah Lumpur Sedalam 1 m m3 143,088.75
7 A.2.3.1.7 Mengerjakan Striping Tebing Setinggi 1 m m2 6,517.50
8 A.2.3.1.8 MembuangTanah sejauh 30 m' m3 38,927.25
9 A.2.3.1.9 Pengurugan Kembali m3 21,725.00
10 A.2.3.1.10 Pemadatan Tanah (per 20 cm) m3 65,175.00
11 A.2.3.1.11 Pengurugan 1 m3 dengan Pasir Urug m3 170,640.00
12 A.2.3.1.12 Lapisan Pudel Cmp. 1Kp : 3Ps : 7TL m3 293,974.80
13 A.2.3.1.13 Pemasangan Lapisan Ijuk tebal 10 cm unt Bidang Resapan m2 75,010.50
14 A.2.3.1.14 Mengurug Sirtu Padat m3 368,179.50

III A.3.2.1. HARGA SATUAN PEKERJAAN PONDASI


1 A.3.2.1.1 Pemasangan Pondasi Batu Belah 1SP : 3 PB m3 1,181,381.01
2 A.3.2.1.2 Pemasangan Pondasi Batu Belah 1SP : 4 PB m3 1,124,655.06
3 A.3.2.1.3 Pemasangan Pondasi Batu Belah 1SP : 5 PB m3 1,085,300.03
4 A.3.2.1.4 Pemasangan Pondasi Batu Belah 1SP : 6 PB m3 1,057,648.05
5 A.3.2.1.5 Pemasangan Pondasi Batu Belah 1SP : 8 PB m3 1,019,769.53
6 A.3.2.1.6 Pemasangan Pondasi Batu Belah 1SP : 1KP : 2PB m3 895,534.13
7 A.3.2.1.7 Pemasangan Pondasi Batu Belah, 1 SP : 3 KP : 10 PB m3 979,408.43
8 A.3.2.1.8 Pemasangan Pondasi Batu Belah, ¼ SP : 1KP : 4 PB m3 945,375.23
9 A.3.2.1.9 Pemasang Batu Kosong/Anstamping m3 697,686.53
10 A.3.2.1.10 Pasang Pondasi Siklop, 60% Beton Camp. 1PC : 2PB : 3KR & 40% Batu Belah m3 3,139,222.61
11 A.3.2.1.11 Pasang Pondasi Sumuran diameter 100 cm m3 1,093,112.73

IV A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING


1 A.4.4.1.1 Pemasangan Dinding Bata Merah ukuran (5x11x22) cm Tebal 1 bata Camp. 1SP: 2PB m2 274,078.65
2 A.4.4.1.2 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 3PB m2 258,955.68
3 A.4.4.1.3 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 4PB m2 249,089.37
4 A.4.4.1.4 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 5PB m2 243,515.13
5 A.4.4.1.5 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 6PB m2 240,602.40
6 A.4.4.1.6 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 3 KP :10PB m2 226,773.09
7 A.4.4.1.7 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 2PB m2 130,946.06
8 A.4.4.1.8 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 3PB m2 125,320.62
9 A.4.4.1.9 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 4PB m2 119,679.08
10 A.4.4.1.10 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1/2 Bata Camp. 1SP : 5PB m2 117,014.25
11 A.4.4.1.11 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 6PB m2 115,305.00
12 A.4.4.1.12 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 8PB m2 112,527.60
13 A.4.4.1.13 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 3KP : 10PB m2 111,484.80
14 A.4.4.1.14 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 1SM : 1PB m2 104,576.25
15 A.4.4.1.15 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1KP : 1SM : 2PB m2 104,374.80
16 A.4.4.1.20 Pemasangan Dinding HB/CB 10, speci camp. 1SP : 3PB m2 176,439.86
17 A.4.4.1.21 Pemasangan Dinding HB/CB 10, speci camp. 1SP : 4PB m2 174,330.33
18 A.4.4.1.22 Pemasangan Dinding Terawang (Rooster) Uk, (12x11x24)cm Camp. 1SP : 3PB m2 805,936.28
19 A.4.4.1.23 Pemasangan Dinding Terawang (Rooster) Uk, (12x11x24)cm Camp. 1SP : 4PB m2 804,692.03

V A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN


1 A,4,4,2.1 Pemasangan Plesteran 1 Pc : 1 PB Tebal 15 mm m2 85,201.93
2 A,4,4,2.2 Pemasangan Plesteran 1 Pc : 2 PB Tebal 15 mm m2 77,410.31
3 A,4,4,2.3 Pemasangan Plesteran 1 Pc : 3 PB Tebal 15 mm m2 73,967.51

375635176.xls 111/116 sat.pekerjaan


file:///conversion/tmp/scratch/375635176.xls

URAIAN PEKERJAAN HARGA SATUAN


NO. KODE SAT PEKERJAAN
(Rp)
4 A,4,4,2.4 Pemasangan Plesteran 1 Pc : 4 PB Tebal 15 mm m2 71,676.62
5 A,4,4,2.5 Pemasangan Plesteran 1 Pc : 5 PB Tebal 15 mm m2 70,296.05
6 A,4,4,2.6 Pemasangan Plesteran 1 Pc : 6 PB Tebal 15 mm m2 69,224.67
7 A,4,4,2.7 Pemasangan Plesteran 1 Pc : 7 PB Tebal 15 mm m2 68,610.60
8 A,4,4,2.8 Pemasangan Plesteran 1 Pc : 8 PB Tebal 15 mm m2 67,996.53
9 A.4.4.2.9 Pemasangan Plesteran 1 Pc : 1/2 Kp : 3 PB Tebal 15 mm m2 72,644.53
10 A,4,4,2.10 Pemasangan Plesteran 1 Pc : 2 Kp : 8 PB Tebal 15 mm m2 69,583.20
11 A,4,4,2.11 Pemasangan Plesteran 1 SM : 1 Kp : 1 PB Tebal 15 mm m2 65,465.33
12 A,4,4,2.12 Pemasangan Plesteran 1 SM : 1 Kp : 2 PB Tebal 15 mm m2 65,690.48
13 A,4,4,2.13 Pemasangan Plesteran 1 Pc : 1 PB Tebal 20 mm m2 103,618.63
14 A,4,4,2.14 Pemasangan Plesteran 1Pc : 3PB Tebal 20 mm m2 68,918.12
15 A,4,4,2.15 Pemasangan Plesteran 1 Pc : 4 PB Tebal 20 mm m2 95,924.33
16 A,4,4,2.16 Pemasangan Plesteran 1Pc : 5PB Tebal 20 mm m2 94,132.94
17 A,4,4,2.17 Pemasangan Plesteran 1Pc : 6PB Tebal 20 mm m2 92,655.06
18 A,4,4,2.18 Pemasangan Plesteran 1 SM : 2 Kp : 2 PB Tebal 20 mm m2 91,031.70
19 A,4,4,2.19 Pemasangan Berapen 1 Pc : 5PB Tebal 15 mm m2 41,352.42
20 A,4,4,2.20 Pemasangan Skoning 1 Pc : 2PB, lebar 10 mm m' 70,501.58
21 A,4,4,2.23 Pemasangan Plesteran Ciprat 1Pc : 2 PB m2 58,703.48
22 A,4,4,2.24 Pemasangan Finishing Siar Pasangan Dinding Bata Merah (=20 m') m2 34,204.69
23 A,4,4,2.25 Pemasangan Finishing Siar Pasangan Dinding Conblock ekspose (=8 m') m2 16,286.64
24 A,4,4,2.26 Pemasangan Finishing Siar Pas.Batu Kali Adukan 1Pc : 2PB m2 70,057.91
25 A,4,4,2.27 Pemasangan Acian m2 43,969.43

VI A.4.6.1 HARGA SATUAN PEKERJAAN K A Y U


1 A.4.6.1.1 Pembuatan & Pemasangan Kosen Pintu & Jendela Kayu Kelas I m3 11,508,601.50
2 A.4.6.1.2 #REF! m3 #REF!
3 A.4.6.1.3 #REF! m2 #REF!
4 A.4.6.1.4 #REF! m2 #REF!
5 A.4.6.1.5 Pembuatan & Pemasangan Daun Pintu Panel, Kayu Merawan m2 818,799.45
6 A.4.6.1.6 Pembuatan & Pemasangan Pintu & Jendela Kaca Kayu Merawan m2 608,876.70
7 A.4.6.1.7 Pembuatan & Pemasangan Pintu & Jendela Jalusi Kayu Merawan m2 985,564.50
8 A.4.6.1.8 Pembuatan&Pemasangan Pintu kayu lapis (Plywood) Rangkap rangka Kayu Merawan (lbr s/d 90 cm) m2 631,533.90
9 A.4.6.1.9 Pembuatan&Pemasangan Pintu Plywood rangkap, rangka expose kayu merawan m2 691,139.40
10 A.4.6.1.10 Pembuatan & Pemasangan Jalusi mati Kosen Kayu Merawan m2 819,546.00
11 A.4.6.1.11 Pembuatan & Pemasangan Pintu Teakwood Rangkap, Rangka Expose Kayu Merawan m2 682,631.10
12 A.4.6.1.12 Pembuatan&Pemasangan Pintu Teakwood Rangkap Lapis Formika,Rangka expose Kayu Merawan m2 754,649.48
13 A.4.6.1.13 #REF! m3 #REF!
14 A.4.6.1.14 #REF! m3 #REF!
15 A.4.6.1.15 #REF! m3 #REF!
16 A.4.6.1.16 #REF! m2 #REF!
17 A.4.6.1.17 Pemasangan Rangka Atap Genteng Beton, Kayu Kelas II m2 519,978.00
18 A.4.6.1.18 #REF! m2 #REF!
19 A.4.6.1.19 #REF! m2 #REF!
20 A.4.6.1.20 #REF! m2 #REF!
21 A.4.6.1.21 Pemasangan Listplank Uk. (3x20)cm Kayu kelas I atau II m' 113,700.75
22 A.4.6.1.22 Pemasangan Listplank Uk. (3x30)cm Kayu kelas I atau II m' 113,937.75
23 A.4.6.1.23 Pemasangan Rangka Dinding Pemisah (60x120) cm kayu kelas II atau III m2 87,278.81
24 A.4.6.1.24 Pemasangan Dinding Pemisah Teakwood Rangkap Rangka Kayu Klas II m2 157,426.07
25 A.4.6.1.25 Pemasangan Dinding Pemisah Plywood Rangkap Rangka Kayu Klas II m2 164,921.19
26 A.4.6.1.26 Pemasangan Dinding Lambriziring dari Papan klas I m2 384,591.75
27 A.4.6.1.27 Pemasangan Dinding Lambriziring dari Plywood ukuran (120x240) cm m2 45,829.88
28 A.4.6.1.28 Pemasangan Dinding Bilik, Rangka Kayu Klas III atau IV m2 #REF!

VII A.4.1.1 HARGA SATUAN PEKERJAAN BETON


1 A.4.1.1.1 Membuat Beton mutu f'c=7,4 Mpa (K100), slum (12±2)cm, w/c = 0,87 m3 896,303.53
2 A.4.1.1.2 Membuat Beton mutu f'c=9,8 Mpa (K125), slum (12±2)cm, w/c = 0,78 m3 940,248.41
3 A.4.1.1.3 Membuat Beton mutu f'c=12,2 Mpa (K150), slum (12±2)cm, w/c = 0,72 m3 974,560.93
4 A.4.1.1.4 Membuat Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0,87 m3 810,951.36
5 A.4.1.1.5 Membuat Beton mutu f'c=14,5 MPa (K175), slum (12±2)cm, w/c = 0,66 m3 1,015,369.79
6 A.4.1.1.6 Membuat Beton mutu f'c=16,9 MPa (K200), slum (12±2)cm, w/c = 0,61 m3 1,053,930.54
7 A.4.1.1.7 Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 m3 1,083,358.32
8 A.4.1.1.8 Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 m3 1,101,991.60
9 A.4.1.1.9 Membuat Lantai Kerja Beton mutu f'c=24,0 MPa (K275), slum (12±2)cm, w/c = 0,53 m3 1,133,845.24
10 A.4.1.1.10 Membuat Beton mutu f'c=26,4 MPa (K300), slum (12±2)cm, w/c = 0,52 m3 1,143,784.01
11 A.4.1.1.11 Membuat Beton mutu f'c=28,8 MPa (K325), slum (12±2)cm, w/c = 0,49 m3 1,246,710.57
12 A.4.1.1.12 Membuat Beton mutu f'c=31,2 MPa (K350), slum (12±2)cm, w/c = 0,48 m3 1,259,653.31
13 A.4.1.1.17 Pembesian dg Besi Polos 10 kg 177,483.38
13.a A.4.1.1.17.a Pembesian dg Besi Ulir 10 kg 177,483.38
14 A.4.1.1.18 Kabel Presstresed Polos/strand 10 kg 171,084.38
15 A.4.1.1.19 Jaring Kawat baja/Wire Mesh 10 kg 252,760.50

375635176.xls 112/116 sat.pekerjaan


file:///conversion/tmp/scratch/375635176.xls

URAIAN PEKERJAAN HARGA SATUAN


NO. KODE SAT PEKERJAAN
(Rp)
16 A.4.1.1.20 Memasang Bekisting untuk Pondasi m2 184,409.70
17 A.4.1.1.21 Memasang Bekisting untuk Sloof m2 193,889.70
18 A.4.1.1.22 Memasang Bekisting untuk Kolom m2 307,406.78
19 A.4.1.1.23 Memasang Bekisting untuk Balok m2 312,383.78
20 A.4.1.1.24 Memasang Bekisting untuk Lantai m2 359,546.78
21 A.4.1.1.25 Memasang Bekisting untuk Dinding m2 335,846.78
22 A.4.1.1.26 Memasang Bekisting untuk Tangga m2 287,812.80
23 A.4.1.1.27 Memasang Jembatan Cor m2 94,936.28
24 A.4.1.1.28 Membuat Pondasi Beton Bertulang (150 kg Besi + Bekisting) m3 4,685,999.55
25 A.4.1.1.29 Membuat Sloof Beton Bertulang (200 kg Besi + Bekisting) m3 5,756,724.08
26 A.4.1.1.30 Membuat Kolom Beton Bertulang (300 kg Besi + Bekisting) m3 8,860,096.88
27 A.4.1.1.31 Membuat Balok Beton Bertulang (200 kg Besi + Bekisting) m3 6,760,656.08
28 A.4.1.1.32 Membuat Balok Beton Bertulang (150 kg Besi + Bekisting) m3 5,913,440.33
29 A.4.1.1.33 Membuat Dinding Beton Bertulang (150 kg Besi + Bekisting) m3 5,723,395.95
30 A.4.1.1.34 Membuat Tangga Beton Bertulang (200 kg Besi + Bekisting) m3 6,400,676.78
31 A.4.1.1.35 Membuat Kolom Penguat Beton Bertulang (11 x 11) cm m' 89,999.57
32 A.4.1.1.36 Membuat Ring Balok Beton Bertulang (10 x 15) cm m' 125,698.88

VIII A.4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP


### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
1 A.4.5.2.30 Pemasangan Atap Genteng Beton m2 1,277,773.65
2 A.4.5.2.32 Pemasangan Atap Genteng Metal m2 157,901.25
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
3 A.4.5.2.36 Pemasangan Nok Genteng Metal m' 83,275.88
16 A.4.5.2.37 Pemasangan Nok Sirap m' 67,782.00
17 A.4.5.2.38 Pemasangan Atap Seng Gelombang m2 64,357.35
18 A.4.5.2.39 Pemasangan Atap Nok Seng m' 46,386.83
19 A.4.5.2.42 Pasang Allumunium Foil / Sisalation m2 #REF!

IX A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT


1 A.4.5.1.1 Pemasangan Langit-langit PVC m2 221,914.95
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
2 A.4.5.1.7 Memasang Langit-langit Gypsu Board, Uk (120x240) tebal 9 mm m2 51,553.43
3 A.4.5.1.8 Memasang Langit-langit Akuatik Uk (60x120) cm & Rangka Allumunium m2 276,756.75
4 A.4.5.1.9 List Langit-Langit m1 34,862.70

X A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


1 A.5.1.1.1 Memasang Closet Duduk / Mono Blok Unit 3,407,378.63
2 A.5.1.1.2 Memasang Closet Jongkok Porselen Unit 771,482.40
3 A.5.1.1.4 Memasang Urinoir Unit 3,443,005.65
4 A.5.1.1.5 Memasang Wastafel Unit 863,521.35
5 A.5.1.1.6 Pemasangan Bathcuip porselen Unit 2,428,598.25
6 A.5.1.1.7 Pemasangan Bak Fibreglass vol.1 m3 Unit 1,615,925.25
7 A.5.1.1.8 Memasang Bak Mandi Batu Bata Vol. 0,30 m3 Unit 1,492,957.80
8 A.5.1.1.12 Pemasangan Bak Cuci Piring Stainless stell buah 310,292.25
9 A.5.1.1.14 Pemasangan Floor Drain buah 164,655.75
10 A.5.1.1.15 Pemasangan Bak Kontrol Pas.Batu Bata 30x30 tinggi 35 cm bh 505,615.80
11 A.5.1.1.16 Pemasangan Bak Kontrol Pas.Batu Bata 45 x 45 tinggi 50 cm bh 754,578.38
12 A.5.1.1.17 Pemasangan Bak Kontrol Pas.Batu Bata 60x60 tinggi 60 cm bh 895,359.93
13 A.5.1.1.18 Pemasangan Pipa Galvanis Ø ½" m' 66,800.43
15 A.5.1.1.19b Pemasangan Kran Ø ½" atau Ø ¾" bh 327,000.75
17 A.5.1.1.20 Pemasangan Pipa Galvanis Ø ¾" m' 82,106.68
18 A.5.1.1.21 Pemasangan Pipa Galvanis Ø 1" m' 72,922.93
19 A.5.1.1.22 Pemasangan Pipa Galvanis Ø 1½ " m' 106,523.60
20 A.5.1.1.23 Pemasangan Pipa Galvanis Ø 3" m' 186,933.75
21 A.5.1.1.24 Pemasangan Pipa Galvanis Ø 4" m' 310,914.38
22 A.5.1.1.25 Pemasangan Pipa PVC tipe AW Ø ½" m' 21,842.51
375635176.xls 113/116 sat.pekerjaan
file:///conversion/tmp/scratch/375635176.xls

URAIAN PEKERJAAN HARGA SATUAN


NO. KODE SAT PEKERJAAN
(Rp)
23 A.5.1.1.26 Pemasangan Pipa PVC tipe AW Ø ¾" m' 21,842.51
24 A.5.1.1.27 Pemasangan Pipa PVC tipe AW Ø 1" m' 27,811.95
25 A.5.1.1.28 Pemasangan Pipa PVC tipe AW Ø 1½" m' 36,513.80
26 A.5.1.1.29 Pemasangan Pipa PVC tipe AW Ø 2" m' 67,432.43
27 A.5.1.1.31 Pemasangan Pipa PVC tipe AW Ø 3" m' 76,875.89
28 A.5.1.1.32 Pemasangan Pipa PVC tipe AW Ø 4" m' 108,100.64
27 A.5.1.1.33 Pemasangan Pipa Air Limbah Jenis Pipa Tanah Ø 20 cm m' 97,004.10
28 A.5.1.1.34 Pemasangan Pipa Air Limbah Jenis Pipa Tanah Ø 15 cm m' 33,436.20

29 A.5.1.1.35 Pemasangan Pipa Beton Ø 20 cm m' 902,869.63

30 A.5.1.1.36 Pemasangan Pipa Beton Ø 100 cm m' #REF!

XI A.4.2.1 HARGA SATUAN PEKERJAAN BESI & ALLUMUNIUM

1 A.4.2.1.1 Pemasangan Besi Profil Kg 31,532.85

2 A.4.2.1.2 Pemasangan Rangka Kuda-kuda Baja IWF kg 31,532.85

3 A.4.2.1.3 Pengerjaan Pekerjaan Perakitan (Kuda-kuda Baja) 100 kg 152,693.18

4 A.4.2.1.4 Pembuatan Pintu Besi Plat Baja tebal 2 mm rangkap, rangka baja Siku m2 975,497.93

5 A.4.2.1.5 Pengerjaan Pengelasan dengan Las Listrik 10 cm 52,274.39

### #REF! #REF! #REF! #REF!

6 A.4.2.1.8 Pemasangan Pintu Lipat (Folding Door) m2 3,376,065.00

### #REF! #REF! #REF! #REF!

### #REF! #REF! #REF! #REF!

7 A.4.2.1.11 Pemasangan Kusen Pintu Allumunium m' 78,447.99

8 A.4.2.1.12 Pemasangan Pintu Allumunium Strip Lebar 8 cm m2 352,479.25

9 A.4.2.1.13 Pemasangan Pintu Kaca Rangka Allumunium m2 317,382.52

### #REF! #REF! #REF! #REF!

### #REF! #REF! #REF! #REF!

### #REF! #REF! #REF! #REF!

### #REF! #REF! #REF! #REF!

10 A.4.2.1.18 Pemasangan Talang Datar/Jurai , Seng BJLS 28 Lebar 90 cm m' 107,331.38

11 A.4.2.1.19 Pemasangan Talang 1/2 Lingkaran Ø 15 cm, Seng Plaat BJLS 30 Lebar 45 cm m' 93,300.98

XII A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI dan KACA

1 A.4.6.2.2 Pemasangan Kunci Tanam Biasa Buah 263,010.75

2 A.4.6.2.3 Pemasangan Kunci Kamar Mandi Buah 150,702.38

3 A.4.6.2.4 Pemasangan Kunci Selinder Buah 262,092.38

4 A.4.6.2.5 Pemasangan Engsel Pintu Buah 107,835.00

5 A.4.6.2.6 Pemasangan Engsel Jendela Kupu-kupu Buah 57,205.88

6 A.4.6.2.7 Pemasangan Engsel Angin Buah 123,328.88

7 A.4.6.2.9 Pemasangan Kait Angin Buah 76,432.50

8 A.4.6.2.10 Pasang Door Closer Buah 376,178.25

9 A.4.6.2.11 Pemasangan Kunci Selot Buah 67,011.75

10 A.4.6.2.13 Pemasangan Door Stop Buah 65,708.25

### #REF! #REF! #REF! #REF!

### #REF! #REF! #REF! #REF!

### #REF! #REF! #REF! #REF!

11 A.4.6.2.17a Pemasangan Kaca tebal 5 mm m2 149,096.70

12 A.4.6.2.17b Pemasangan Kaca Reyband m2 573,397.80

XIII A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI dan DINDING

### #REF! #REF! #REF! #REF!

### #REF! #REF! #REF! #REF!

### #REF! #REF! #REF! #REF!

### #REF! #REF! #REF! #REF!

### #REF! #REF! #REF! #REF!

### #REF! #REF! #REF! #REF!

### #REF! #REF! #REF! #REF!

1 A.4.4.3.39 Pemasangan Plint Keramik Ukuran 10x20 cm m' 32,768.33

### #REF! #REF! #REF! #REF!

### #REF! #REF! #REF! #REF!

### #REF! #REF! #REF! #REF!

375635176.xls 114/116 sat.pekerjaan


file:///conversion/tmp/scratch/375635176.xls

URAIAN PEKERJAAN HARGA SATUAN


NO. KODE SAT PEKERJAAN
(Rp)
2 A.4.4.3.36 Pemasangan Lantai Keramik 20 x 20 cm m2 242,718.81

375635176.xls 115/116 sat.pekerjaan


file:///conversion/tmp/scratch/375635176.xls

URAIAN PEKERJAAN HARGA SATUAN


NO. KODE SAT PEKERJAAN
(Rp)
### #REF! #REF! #REF! #REF!

3 A.4.4.3.68 Pemasangan Plint Keramik Ukuran 10x50 cm m' 61,423.29

### #REF! #REF! #REF! #REF!

### #REF! #REF! #REF! #REF!

### #REF! #REF! #REF! #REF!

### #REF! #REF! #REF! #REF!

### #REF! #REF! #REF! #REF!

### #REF! #REF! #REF! #REF!

5 A.4.4.3.70 Pemasangan Lantai Granit 60 x 60 cm m2 460,374.99

### #REF! #REF! #REF! #REF!

Pemasangan Dinding Keramik 20x25 cm polos 274,667.60

6 A.4.4.3.53 Pemasangan Dinding Keramik 10x20 cm, m2 271,171.85

### #REF! #REF! #REF! #REF!

8 A.4.4.3.58 Pemasangan Dinding Batu Andesit Bintik m2 387,785.33

9 A.4.4.3.58 Pemasangan Dinding Batu Andesit m2 413,855.33

### #REF! #REF! #REF! #REF!

10 A.4.4.3.64 Pemasangan Floor Hardener m2 76,432.50

XIV A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN

### #REF! #REF! #REF! #REF!

### #REF! #REF! #REF! #REF!

### #REF! #REF! #REF! #REF!

1 A.4.7.1.4 Pengecatan Bidang Kayu Baru (1 lp Plamuur, 1 lp Cat dasar, 2 Lp Cat Penutup) m2 49,470.20

2 A.4.7.1.5 Pengecatan Bidang Kayu Baru (1 lp Plamuur, 1 lp Cat dasar, 3 Lp Cat Penutup) m2 68,107.88

3 A.4.7.1.6 Pelaburan Bidang Kayu dg Teak Oil m2 40,497.38

4 A.4.7.1.7 Pelaburan Bidang Kayu dg Politur m2 62,255.16

5 A.4.7.1.8 Pelaburan Bidang Kayu dg Cat Residu & Ter m2 13,671.94

6 A.4.7.1.9 Pelaburan Bidang Kayu dg Vernis m2 47,168.93

8 A.4.7.1.10b Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar, 2lap cat penutup) m2 24,739.84

### #REF! #REF! #REF! #REF!

### #REF! #REF! #REF! #REF!

### #REF! #REF! #REF! #REF!

### #REF! #REF! #REF! #REF!

### #REF! #REF! #REF! #REF!

9 A.4.7.1.16 Pengecatan Permukaan Baja dg Meni Besi m2 35,757.38

10 A.4.7.1.17 Pengecatan Permukaan Baja dg Meni Besi & Perancah m2 69,959.44

375635176.xls 116/116 sat.pekerjaan