Piping Checklist
Piping Checklist
Project:
Location: Date:
Report no:
All welding machines are calibrated & valid within 6 months from the date
1 of calibration.
All ovens, Quivers are calibrated & valid within 6 months from the date of
2 calibration.
3 All gas cylinders are having test certificate & purity certificates.
Applicable WPS is posted in the area, and the welder is aware of the
4 location and applicable WPS
Weld joints are properly identified and marked up with the joint details,
6 welder no, wps no, date, heat no etc.on the pipe.
Conducted By:
Date:
Signature: