QUALITY MANAGEMENT SYSTEM Page 1 of 32

MTSC
Procedure Title: Fabrication Procedure Procedure No.:
Mitsui Thang Long
for CABLE ANCHORAGE ANC-QS-001-0
Steel Construction
The Cuu Long (Can Tho) Bridge Construction Project.
Co., Ltd. Revision: 0

REVISION HISTORY
Revision Date Section Page Revision Summary
0 6/3/07 All All 1st Issue for Approval.

NIPPON STEEL CORPORATION

Originator Company
Originator General Manager
Dept. Approval Approval

Name: T.M. Cuong T.H. Thang Y. Yamaguchi

Project Technical
POS: Director General
Coordinator Manager

SIG.:

Date
QUALITY MANAGEMENT SYSTEM Page 2 of 32
MTSC
Procedure Title: Fabrication Procedure Procedure No.:
Mitsui Thang Long
for CABLE ANCHORAGE ANC-QS-001-0
Steel Construction
The Cuu Long (Can Tho) Bridge Construction Project.
Co., Ltd. Revision: 0

CONTENTS
SECTION 1 GENERAL
1.1 Scope of Application
1.2 Standards and Codes
1.3 General Outline of the Project
1.4 Fabrication Yard

SECTION 2 MATERIAL
2.1 Steel Material
2.2 Welding consumables
2.3 Paint Materials

SECTION 3 FULL SIZE DRAWING


3.1 Full Size Drawing
3.2 Review of Design Drawings and Full Size Drawings

SECTION 4 FABRICATION
4.1 Marking
4.2 Cutting
4.3 Drilling
4.4 Forming

SECTION 5 ASSEMBLY
5.1 General
5.2 Assembly
5.3 Fitting Tolerances on Weld Joints
5.4 Run-on and Run-off Tab

SECTION 6 WELDING
6.1 Welder and Welding Operator
6.2 Welding Procedure
6.3 Application of Welding Process
6.4 Welding Position
6.5 Storage of Welding Consumables
6.6 Welding Sequence
6.7 Workmanship
6.8 Turning over Blocks
QUALITY MANAGEMENT SYSTEM Page 3 of 32
MTSC
Procedure Title: Fabrication Procedure Procedure No.:
Mitsui Thang Long
for CABLE ANCHORAGE ANC-QS-001-0
Steel Construction
The Cuu Long (Can Tho) Bridge Construction Project.
Co., Ltd. Revision: 0

SECTION 7 - COATING
7.1 Paint Applicator
7.2 Paint Materials
7.3 Atmospheric Condition
7.4 Surface Condition
7.5 Surface Treatment
7.6 Coating

SECTION 8 - INSPECTION
8.1 In-Process Inspection
8.2 Dimensional Inspection
8.3 Visual Inspection of Weld Profile and Base Metal
8.4 Repairs
8.5 Inspection and Test Records

SECTION 9 - PACKING AND TRANSPORTATION


9.1 Packing Products
9.2 Piece Mark
9.3 Transportation

SECTION 10 - PROGRESS REPORT


10.1 Progress Report and Photos

Attachments
Fabrication Sequence
Master Schedule (later)