PRE REVIEW MEETING WITH

SUPERINTENDING ENGINEER (R&B) CIRCLE,


KAKINADA ON 03.05.17
STATUS OF BUILDINGS WORKS
DETAILS OF (R&B) DIVISION, KAKINADA
Name of the scheme:- BUILDINGS Plan.(Pushkaram works)

Expenditu
Contract Target re
T.P. Date of
Sl. Length in A/S. T.S. No. T/S. Name of the Value/ date of incurred
Name of work Mandal Assembly Parliament Excess/ Commenc
No. KMs. Amount. and date. Amount. Contractor. Working completio upto
Less ement
Estimate n 31.03.201
7

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

PUSHKARAM WORKS
1 Construction of New Kakinada Kakinada Kakinada 1 No. 200.00 200.00 M/s Tirumala 2.89% 116.11 18.11.15 17.02.16 60.60
Inspection Bungalow at Constructions, Excess 1st EOT
Kakinada in E.G.District Contractors, 30.08.16
Bhimavaram 2nd EOT
31.01.17
3rd EOT
30.06.17
(to be
approved)

Total:- 200.00 -- 116.11 0.00 60.60


UILDINGS Plan.(Pushkaram works)

Balance
Work value of
Physical
LOC Expenditure Cumulat done yet work to be
status of work
released incurred in ive to be done
(Elobrate Remarks.
during the year Expendi paid. excluding
actual stage of
2017-18 2017-18 ture (LOC work done
work)
required) yet to be
paid.

16 17 18 19 20 21 22

0.00 0.00 60.60 15.00 124.40 Slab for


ground floor
and First floor
completed.
Brick work
Completed.
Plasterings
are in
progress

0.00 0.00 60.60 15.00 124.40


Name of the scheme:- BUILDINGS NON - Plan

Expenditu
Contract Target re
T.P. Date of
Sl. Length in A/S. T.S. No. T/S. Name of the Value/ date of incurred
Name of work Mandal Assembly Parliament Excess/ Commenc
No. KMs. Amount. and date. Amount. Contractor. Working completio upto
Less ement
Estimate n 31.03.201
7

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Office Buildings
1 Annual Maintenance to Pithapuram Pithapuram Kakinada 1 No. -- -- 4.96 Sri P.Rama 2.39% 2.23 12.07.16 28.02.17 --
(R&B) Inpspection DR No. Raju, Less
Bungalow at Pithapuram 48/16-17 Contractor,Vis
for the year 2016-17 akahpatanam

2 Annual Maintenance to Kakinada Kakinada Kakinada 1 No. -- -- 10.00 Sri 4.94% 3.83 15.07.16 28.02.17 --
(R&B) Inpspection DR No. K.V.Suresh, Excess
Bungalow at Kakinada for 49/16-17 Contrator,
the year 2016-17 Kakinada.

3 Urgent Repairs to Kakinada Kakinada Kakinada 1 No. -- -- 1.00 Sri M.Siva Estimat 0.81 23.08.16 23.09.16 --
Inspection Bungalow at DR No. Kesavar Rao, e Rates
Kakinada 67/16-17 Kakinada.

4 Annual Repairs to (R&B) Kakinada Kakinada Kakinada 1 No. -- -- 1.00 Sri M.Siva Estimat 0.95 15.10.16 28.02.16 --
Circle Office, Kakinada for DR No. Kesavar Rao, e Rates
2016-17 69/16-17 Kakinada.
Expenditu
Contract Target re
T.P. Date of
Sl. Length in A/S. T.S. No. T/S. Name of the Value/ date of incurred
Name of work Mandal Assembly Parliament Excess/ Commenc
No. KMs. Amount. and date. Amount. Contractor. Working completio upto
Less ement
Estimate n 31.03.201
7

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
5 Annual Repairs to (R&B) Kakinada Kakinada Kakinada 1 No. -- -- 1.00 Sri V.Srinivasa 0.01% 0.95 06.10.16 28.02.17 --
Division Office, Kakinada DR No.70 Rao, less
for 2016-17 /16-17 pithapuram

6 AR to the East and West Kakinada Kakinada Kakinada 1 No. -- -- 0.80 Sri B.Pola 0.50% 0.75 15.10.16 28.02.17 --
Sub Division Buildings of DR No. Rao, less
(R&B) Division Office at 71/16-17 Kakinada.
Kakinada for 2016-17

7 UR to Kerbs and footh Kakinada Kakinada Kakinada 1 No. -- -- 1.00 Sri M.Siva Estimat 0.94 15.10.16 14.12.16 --
paths to (R&B) Division DR No. Kesava rao, e Rates
Office, Kakinada 72/16-17 Kakinada .

Total:- 0.00 -- 6.06 0.00 0.00


Expenditu
Contract Target re
T.P. Date of
Sl. Length in A/S. T.S. No. T/S. Name of the Value/ date of incurred
Name of work Mandal Assembly Parliament Excess/ Commenc
No. KMs. Amount. and date. Amount. Contractor. Working completio upto
Less ement
Estimate n 31.03.201
7

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Residentail Quarters
1 UR to OLD C5,C6,C7 &C8 (4 Kakinada Kakinada Kakinada 1 No. -- -- 1.00 Sri B.Pola Estimat 0.94 26.08.16 25.09.16 --
NOs.) in TDC DR NO. Rao, e Rates
Compound,Kakinada 68/2016- Kakinada.
17

2 UR to the toilet block in RHS Kakinada Kakinada Kakinada 1 No. -- -- 1.00 Sri M.Siva Estiamt 0.95 15.10.16 14.12.16 --
quarters in SPs Bungalow DR NO. Kesavar Rao e Rates
Compound at KKD 72/2016-
17

Total:- 2.00 1.89

Barricading and Helipad Arrangements


1 Providing barricading Kakinada Kakinada Kakinada 1 No. -- DR No. / 1.00 Sri Estimat 0.89 21.10.16 22.10.16 --
arrangments at Kakinada 2016-17 R.S.R.Satya e rates
Ananda Bharathi Grounds for Dev,
the visit of Hon'ble Chief
Minister of Government of Kakinada.
Andhra Pradesh on
22.10.2016

2 Construcion of Helipad on Ramachandr Ramachandr Amalapura 1 No. -- DR No. / 3.00 M/s 0.05% 2.77 03.01.17 04.01.17 --
ensuing visit of Hon'ble Chief apuram apuram m 2016-17 Shanmuka less
Minister of AP to Consultancy,
Ramachandrapuram in
E.G.District on 05.01.2017 Kakinada.
Expenditu
Contract Target re
T.P. Date of
Sl. Length in A/S. T.S. No. T/S. Name of the Value/ date of incurred
Name of work Mandal Assembly Parliament Excess/ Commenc
No. KMs. Amount. and date. Amount. Contractor. Working completio upto
Less ement
Estimate n 31.03.201
7

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
3 Construcion of Helipad on Ramachandr Ramachandr Amalapura 1 No. -- DR No. / 3.00 Sri 0.04% 2.72 03.01.17 04.01.17 --
ensuing visit of Hon'ble Chief apuram apuram m 2016-17 K.V.Suresh, less
Minister of AP to Pithapuram Kakinada.
in E.G.District on 05.01.2017

4 Providing barricading Ramachandr Ramachandr Amalapura 1 No. -- DR No. / 1.00 M/s 0.01% 0.93 03.01.17 04.01.17 --
arrangements at Helipad site apuram apuram m 2016-17 Shanmuka less
on ensuing visit of Hon'ble Consultancy,
Chief Minister of AP to
Ramachandrapuram in Kakinada.
E.G.District on 05.01.2017

5 Providing barricading Ramachandr Ramachandr Amalapura 1 No. -- DR No. / 1.00 M/s 0.06% 0.92 03.01.17 04.01.17 --
arrangements at meeting apuram apuram m 2016-17 Shanmuka less
place in VSM College Consultancy,
grounds, Ramachandrapuram
on ensuing visit of Hon'ble Kakinada.
Chief Minister of AP to
Ramachandrapuram in
E.G.District on 05.01.2017

6 Providing barricading Pithapuram Pithapuram Kakinada 1 No. -- DR No. / 1.00 Sri 0.07% 0.85 03.01.17 04.01.17 --
arrangements at Helipad site 2016-17 K.V.Suresh, less
on ensuing visit of Hon'ble Kakinada.
Chief Minister of AP to
Pithapuram in E.G.District on
05.01.2017
Expenditu
Contract Target re
T.P. Date of
Sl. Length in A/S. T.S. No. T/S. Name of the Value/ date of incurred
Name of work Mandal Assembly Parliament Excess/ Commenc
No. KMs. Amount. and date. Amount. Contractor. Working completio upto
Less ement
Estimate n 31.03.201
7

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
7 Providing barricading Pithapuram Pithapuram Kakinada 1 No. -- DR No. / 1.00 Sri 0.10% 0.87 03.01.17 04.01.17 --
arrangements at meeting 2016-17 K.V.Suresh, less
place at Pithapuram on Kakinada.
ensuing visit of Hon'ble Chief
Minister of AP to
Ramachandrapuram in
E.G.District on 05.01.2017

8 Construction of Barricading Kakinada Kakinada Kakinada 1 No. -- DR No. / 0.50 Sri Estimat 0.47 21.03.17 22.03.17 --
arrangements for AP BC 2016-17 K.V.Suresh, e rates
commission public heraing Kakinada.
Rangaraya Medical College @
Kakinada on 22.03.17

Total:- 11.50 10.42


me:- BUILDINGS NON - Plan

Balance
Work value of
Physical
LOC Expenditure Cumulat done yet work to be
status of work
released incurred in ive to be done
(Elobrate Remarks.
during the year Expendi paid. excluding
actual stage of
2017-18 2017-18 ture (LOC work done
work)
required) yet to be
paid.

16 17 18 19 20 21 22

-- -- -- 2.24 -- Work
Completed.
Final bill to be
paid.

-- -- -- 7.11 -- Work
Completed.
Final bill to be
paid.

-- -- -- 0.83 -- Work
Completed.
Final bill to be
paid.

-- -- -- 1.05 -- Work
Completed.
Final bill to be
paid.
Balance
Work value of
Physical
LOC Expenditure Cumulat done yet work to be
status of work
released incurred in ive to be done
(Elobrate Remarks.
during the year Expendi paid. excluding
actual stage of
2017-18 2017-18 ture (LOC work done
work)
required) yet to be
paid.

16 17 18 19 20 21 22
-- -- -- 1.00 -- Work
Completed.
Final bill to be
paid.

-- -- -- 0.79 -- Work
Completed.
Final bill to be
paid.

-- -- -- 0.99 -- Work
Completed.
Final bill to be
paid.

0.00 0.00 0.00 9.35 0.00


Balance
Work value of
Physical
LOC Expenditure Cumulat done yet work to be
status of work
released incurred in ive to be done
(Elobrate Remarks.
during the year Expendi paid. excluding
actual stage of
2017-18 2017-18 ture (LOC work done
work)
required) yet to be
paid.

16 17 18 19 20 21 22

-- -- -- 1.00 -- Work
Completed.
Final bill to be
paid.

-- -- -- 0.98 -- Work
Completed.
Final bill to be
paid.

1.98

-- -- -- 1.00 -- Work
completed.
Final bill to be
paid.

-- -- -- 3.00 -- Work
completed.
Final bill to be
paid.
Balance
Work value of
Physical
LOC Expenditure Cumulat done yet work to be
status of work
released incurred in ive to be done
(Elobrate Remarks.
during the year Expendi paid. excluding
actual stage of
2017-18 2017-18 ture (LOC work done
work)
required) yet to be
paid.

16 17 18 19 20 21 22
-- -- -- 3.00 -- Work
completed.
Final bill to be
paid.

-- -- -- 1.00 -- Work
completed.
Final bill to be
paid.

-- -- -- 1.00 -- Work
completed.
Final bill to be
paid.

-- -- -- 1.00 -- Work
completed.
Final bill to be
paid.
Balance
Work value of
Physical
LOC Expenditure Cumulat done yet work to be
status of work
released incurred in ive to be done
(Elobrate Remarks.
during the year Expendi paid. excluding
actual stage of
2017-18 2017-18 ture (LOC work done
work)
required) yet to be
paid.

16 17 18 19 20 21 22
-- -- -- 1.00 -- Work
completed.
Final bill to be
paid.

-- -- -- 0.5 -- Work
completed.
Final bill to be
paid.

11.50
Name of the scheme:- COURT BUILDINGS PLAN

Expenditu
Contract Target re
T.P. Date of
Sl. Length in T.S. No. T/S. Name of the Value/ date of incurred
Name of work Mandal Assembly Parliament A/S. Amount. Excess/ Commenc
No. KMs. and date. Amount. Contractor. Working completio upto
Less ement
Estimate n 31.03.201
7

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

1 Constrution of III Addl. Kakinada Kakinada Kakinada 1 No. 675.00 -- -- -- -- -- -- -- --


Distrit court Buildings at G.O.Ms.No.
kakinada. 58
Home(Courts
.B) Dept. Dt.
12.04.2017

2 Constrution of (3) Floors Kakinada Kakinada Kakinada 1 No. 507.00 -- -- -- -- -- -- -- --


over the existing excise G.O.Ms.No.
court Building at Kakinada 58
to accommodate the III Home(Courts
Addl. Sr. Civil Judge's court .B) Dept. Dt.
in the 3rd Floor, V Addl. 12.04.2017
Judl Magistrate of First
Class Court in the 4th Floor
and conference hall in the
5th floor
Expenditu
Contract Target re
T.P. Date of
Sl. Length in T.S. No. T/S. Name of the Value/ date of incurred
Name of work Mandal Assembly Parliament A/S. Amount. Excess/ Commenc
No. KMs. and date. Amount. Contractor. Working completio upto
Less ement
Estimate n 31.03.201
7

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
3 Construction of Building to Pithapuram Pithapuram Kakinada 1 No. 650.00 -- -- -- -- -- -- -- --
accommodate the newly G.O.Ms.No.
established Addl. District 58
and Sessions court, Home(Courts
Pithapuram .B) Dept. Dt.
12.04.2017

Total:- 1832.00 -- 0.00 0.00 0.00


me:- COURT BUILDINGS PLAN

Balance
Work value of
Physical
LOC Expenditure Cumulat done yet work to be
status of work
released incurred in ive to be done
(Elobrate Remarks.
during the year Expendi paid. excluding
actual stage of
2017-18 2017-18 ture (LOC work done
work)
required) yet to be
paid.

16 17 18 19 20 21 22

-- -- -- -- 675.00 Estimates to
be submitted.

-- -- -- -- 507.00 Estimates to
be submitted.
Balance
Work value of
Physical
LOC Expenditure Cumulat done yet work to be
status of work
released incurred in ive to be done
(Elobrate Remarks.
during the year Expendi paid. excluding
actual stage of
2017-18 2017-18 ture (LOC work done
work)
required) yet to be
paid.

16 17 18 19 20 21 22
-- -- -- -- 650.00 Estimates to
be submitted.

0.00 0.00 0.00 0.00 1832.00


Name of the scheme:- JUDICIAL BUILDINGS (NON -PLAN)

LOC
Cumulativ
Date of Expenditu recived
Sl. Estimate Agreemen Name of the e
District Division Name of Work Reference to Sanction. Technical DHS DFC re upto during the
No. Amount t Amount Contractor Expenditu
sanction. 3/2017 year
re upto
2017-18

1 2 3 4 5 6 7 7 8 9 10 11 12 13
Head of Account : 2059 PW - 01 Office Builidings - MH 053 Mtc. & Repairs - SH 09 - Buildings of High court 270- 272 Maintenance.

1 East R&B Construction of toilet block in the ROC No. 519/2011-DII(B) 3.50 2.95 30.01.12 29.03.12 M/s VNR -- -- --
Godavari Division premises of court complex at Dt. 02.12.2011 of the lakhs Lakhs EOT upto Construction,
Kakinada Pithapuram (Two toilets for gents High Court of Andhra DR No. DR 30.11.12 Kakinada.
and two toilets for ladies) Pradesh, Hyderabad. 128/2011- Agt.No.
Received on 19.12.2011 12 111/2011-
12

3 East R&B Effecting alterations of the cellar to ROC No. 522/2012- 8.00 4.21 4.2.13 03.04.13 Sri R.V. 3.18 -- 3.18
Godavari Division accommodated newly sanctioned DII(B) Dt. 04.12.2012 of Lakhs Bhavani
Kakinada regualr Addl. District and Sessions the High Court of Andhra DR Shankar,
court in the existing Senior Civil Pradesh, Hyderabad. Agt.No. Kakinada.
Judge's Court Building at 102/2012-
Pithapuram in E.G. District. 13

4 East R&B Urgent repairs to the Judicial guest ROC No. 616/2013- 21.00 11.65 13.10.14 12.02.15 Sri V.Srinivasa 16.92 0.54 17.46
Godavari Division house at Kakinada. DII(B) Dt.19.03.2014 of lakhs CR Rao,
Kakinada the High Court of Andhra CR No. Agt.No. / Pithapuram
Pradesh. 3/2014-15 2014-15
Dt.23.04.1
4

5 East R&B Urgent repairs to special mobile ROC No. 513/2014- 2.00 lakhs 1.63 lakhs 26.08.14 27.11.14 Sri M.Siva -- -- --
Godavari Division judicial court magistrate centre at DII(B) Dt. 17.07.2014 of DR No. DR Kesava Rao,
Kakinada Kakinada in E.G.Dist. the High Court of Andhra 30 /2014- Agt.No. Kakinada
Pradesh, Hyderabad 15 42 /2014-
received on 21.07.14 15
LOC
Cumulativ
Date of Expenditu recived
Sl. Estimate Agreemen Name of the e
District Division Name of Work Reference to Sanction. Technical DHS DFC re upto during the
No. Amount t Amount Contractor Expenditu
sanction. 3/2017 year
re upto
2017-18

1 2 3 4 5 6 7 7 8 9 10 11 12 13
6 East R&B Construction of toilet to attenders, ROC No. 513/2014- 2.80 lakhs 2.11 05.01.15 04.04.15 Sri V.Srinivasa 2.08 0.17 2.25
Godavari Division providing cement flooring and DII(B) Dt. 19.09.2014 of DR lakhs Rao,
Kakinada providing water storage sump to the High Court of Andhra No. / DR Pithapuram
the residential quarters of the Pradesh, Hyderabad 2014-15 Agt.No.
Chairman LRAT cum IV Addl. /2014-15
District Judge, Kakinada in the unit
of E.G.District.

13 East R&B Urgent repiars to quarter No.B2 in ROC No. 327/2015- 6.06 lakhs 5.10 22.11.16 21.02.16 Smt -- -- --
Godavari Division Sub Judge and Munsif Magistrate DII(B) Dt. 09.09.2016 of DR No. DR No. / K.Butchamma,
Kakinada `quarters (10 Nos) Kakinada., East the High Court of /2016-17 2016-17 Contractor,
Godavari District. Judicature at Hyderabad Kirlampudi
for the state of Telangana Mandal,
and the state of Andhra E.G.District.
Pradesh

14 East R&B Most urgent repairs to toilets in first ROC No. 327/2015- 2.60 lakhs 1.89 24.11.16 23.02.16 Sri B.Murali -- -- --
Godavari Division floor of the new court complex at DII(B) Dt. 15.09.2016 of DR No. DR No. / Krishna,
Kakinada Kakinada. the High Court of /2016-17 2016-17 Contractor,
Judicature at Hyderabad Visakhaptana
for the state of Telangana m
and the state of Andhra
Pradesh

15 East R&B Providing cattle guard at main ROC No. 493/2016- 0.95 lakhs 0.89 lakhs -- 06.2.17 5.3.17 Sri M.Siva -- -- --
Godavari Division gate in sub judge and Munisiff DII(B) Dt. 16.12.2016 of DR No. DR No. Kesava Rao,
Kakinada Magistrate quarter (10 Nos) at the High Court of /2016-17 /2016-17 Kakinada
Kakinada , East Godavari District, Judicature at Hyderabad
Kakinada for the state of Telangana
and the state of Andhra
Pradesh
LOC
Cumulativ
Date of Expenditu recived
Sl. Estimate Agreemen Name of the e
District Division Name of Work Reference to Sanction. Technical DHS DFC re upto during the
No. Amount t Amount Contractor Expenditu
sanction. 3/2017 year
re upto
2017-18

1 2 3 4 5 6 7 7 8 9 10 11 12 13
16 East R&B Urgent minor repairs to the ROC No. 493/2016- 1.00 lakh 0.95 lakhs -- 06.2.17 5.3.17 Sri V.Srinivasa -- -- --
Godavari Division residential quarter of the III Addl. DII(B) Dt. 07.01.2017 of DR No. DR No. Rao,Pithapura
Kakinada District Judge, Kakinada the High Court of /2016-17 /2016-17 m
Judicature at Hyderabad
for the state of Telangana
and the state of Andhra
Pradesh

17 East R&B Construction of toilets for litigant ROC No. 327/2015- 3.90 lakhs 2.98 lakhs -- 9.3.17 8.4.17 P.Satyanaraya -- -- --
Godavari Division public in the Prl. Junior Civil DII(B) Dt. 15.09.2016 of DR No. DR No. na Reddy,
Kakinada Judge's Court Complex at the High Court of /2016-17 /2016-17 Ravulapalem
Alamuru Judicature at Hyderabad
for the state of Telangana
and the state of Andhra
Pradesh

18 East R&B Construction of Collapsed ROC No. 493/2016- 9.00 8.79 -- 7.4.17 6.9.17 P.Satyanaraya -- -- --
Godavari Division compound wall of Court Complex DII(B) Dt. 09.02.2017 of DR Lakhs na
Kakinada at Ramachandrapuram the High Court of No. / DR No. Reddy,Kakinad
Judicature at Hyderabad 2017-18 /2017-18 a
for the state of Telangana
and the state of Andhra
Pradesh received on
15.02.17
LOC
Cumulativ
Date of Expenditu recived
Sl. Estimate Agreemen Name of the e
District Division Name of Work Reference to Sanction. Technical DHS DFC re upto during the
No. Amount t Amount Contractor Expenditu
sanction. 3/2017 year
re upto
2017-18

1 2 3 4 5 6 7 7 8 9 10 11 12 13
19 East R&B Urgent Repairs Senior Civil Judge ROC No. 493/2016- 10.00 8.00 -- 7.4.17 6.9.17 P.Satyanaraya -- -- --
Godavari Division Court building at DII(B) Dt. 09.02.2017 of DR No. / Lakhs na
Kakinada Ramachandrapuram the High Court of 2017-18 DR No. Reddy,Kakinad
Judicature at Hyderabad /2017-18 a
for the state of Telangana
and the state of Andhra
Pradesh received on
15.02.17

20 East R&B Painting ot the exterior wal lof ROC No. 493/2016- 4.45 -- -- -- -- -- -- -- --
Godavari Division Judicial officers quarters (10 DII(B) Dt. 09.02.2017 of DR No. /
Kakinada Nos,) at Kakinada the High Court of 2017-18
Judicature at Hyderabad
for the state of Telangana
and the state of Andhra
Pradesh received on
16.03.17

Total:- 22.18 0.71 22.89


scheme:- JUDICIAL BUILDINGS (NON -PLAN)

Value of Balance
work value of
Stage of work
done to work to
be paid be done

14 15 16

3.07 -- Work completed. Final bill


to be paid.

1.82 -- Work completed. Final bill


to be paid.

-- -- Work completed. Final bill


paid

-- 2.00 Work started. Working


estimate along with
deviations as requested by
the Judicial local officer
submitted to Spl. Mobile
court judge and approval
is awaited.
Value of Balance
work value of
Stage of work
done to work to
be paid be done

14 15 16
-- -- Work completed. Final bill
paid.

-- 5.10 Agency settled. Work to


be taken up.

2.10 -- Work Completed.


Final Bill to be paid.

0.95 -- Work Completed.


Final Bill to be paid.
Value of Balance
work value of
Stage of work
done to work to
be paid be done

14 15 16
1.00 -- Work Completed.
Final Bill to be paid.

-- 3.90 Work is in Progress.

-- 9.00 Work is in Progress.


Value of Balance
work value of
Stage of work
done to work to
be paid be done

14 15 16
-- 10.00 Work is in Progress.

-- 4.45 Received Lr.No. Nil


Dated 27.02.2017 from
Prl.Sr.Civil Judge Court,
KKD mentioned that
work entrusted to Kumar
Colour Corner, Kakinada
and depute concerned
official to oversee the
work in the procss of
execution and submit bill
to department completion
of work.

8.94 34.45
BUDGET REQUIREMENT FOR CONSTRUCTION OF AWC BUILDINGS UNDER RIDF WORKS - XVI,XIX
Head of Account : "4235-02-102-07-04-530-531" GENERAL
Schemes covered : RIDF-XVI, RIDF-XIX & RIDF-XX

Tender Percentage
Name of the Scheme/
Constituency

mated cost
District

Mandal

Tranche
Division/ Amount Expen
S. Name of the

Esti
Name of the AWC Executive ECV TCV DHS TDC released so diture
No. Contractor
Engineer far incurred

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Construction of Anganwadi Executive 6.19% 10.17 9.54 M/s Amul 8.12.16 07.04.17 …. …
East Godavari

Pithapuram

Pithapuram

Centre Building in Engineer less Constructions, EOT

RIDF XX
Kandrada village ( Code (R&B), Kakinada 05.07.17
1 No.20) of Pithapuram 12.00 Kakinada (to be
Mandal in East Godavari approved)
District

Construction of Anganwadi Executive 7.17% 10.17 9.44 M/s Amul 8.12.16 07.04.17 …. …
East Godavari East Godavari East Godavari

Pithapuram

Pithapuram

Centre Building in RIDF XX Engineer less Constructions, EOT


Kandrada village ( Code (R&B), Kakinada 05.07.17
2 No.21) of Pithapuram 12.00 Kakinada (to be
Mandal in East Godavari approved)
District

Construction of Anganwadi Executive 1.00% 10.01 9.91 Sri G. 01.02.17 31.05.17 …. …


Kothapeta

Centre Building in Alamuru Engineer less Venkateswara


Alamuru

RIDF XX

village ( Code No.167) of (R&B), Rao,


3 Alamuru Mandal in East 12.00 Kakinada Merlapalem.
Godavari District

Construction of Anganwadi Executive 4.99% 10.03 10.53 Sri G. 31.03.17 30.07.17 …. …


Kothapeta

Centre Building in Engineer Excess Venkateswara


Alamuru

RIDF XX

Pedapalla village ( Code (R&B), Rao,


4 No.179) of Alamuru Mandal 12.00 Kakinada Merlapalem.
in East Godavari District
Construction of Anganwadi Executive 3.79% 10.02 10.40 Sri G. 01.02.17 31.05.17 …. …

East Godavari
Centre Building in Penikeru Engineer Excess Venkateswara

Kothapeta

Alamuru

RIDF XX
village ( Code No.201) of (R&B), Rao,
5 Alamuru Mandal in East 12.00 Kakinada Merlapalem.
Godavari District

Total 60.00 49.82


WC BUILDINGS UNDER RIDF WORKS - XVI,XIX & XX (GENERAL)
5-02-102-07-04-530-531" GENERAL
RIDF-XVI, RIDF-XIX & RIDF-XX
Budget requirement

additional
Pending further
( over and
Total
Pending requiremen amount Remarks
bills above
bills with t within the
estimated cost required
amount estimated
EEs to complete
with PAO cost
the building)

17 18 19 20 21 22
… … 12.00 … 12.00 Work completed
upto lintel level.

… … 12.00 … 12.00 Work completed


upto lintel level.

… … 12.00 … 12.00 Work is in


progress

… … 12.00 … 12.00 Agreement


concluded. Work
to be started.
… … 12.00 … 12.00 Work is in
progress

60.00 60.00