This Project Quality Plan document outlines a checklist for marking and installing sleeves and ducts for a construction project. The checklist includes 8 points to verify such as having approved shop drawings, checking material availability, verifying invert levels and locations match approved drawings, checking joint requirements are met, blocking of ends, ensuring adequate sizes, and protecting during concrete/mortar works. The document includes spaces for signatures and dates from the site engineer, MEP engineer, project engineer, project manager, HSEQ, and QA/QC incharge.
This Project Quality Plan document outlines a checklist for marking and installing sleeves and ducts for a construction project. The checklist includes 8 points to verify such as having approved shop drawings, checking material availability, verifying invert levels and locations match approved drawings, checking joint requirements are met, blocking of ends, ensuring adequate sizes, and protecting during concrete/mortar works. The document includes spaces for signatures and dates from the site engineer, MEP engineer, project engineer, project manager, HSEQ, and QA/QC incharge.
This Project Quality Plan document outlines a checklist for marking and installing sleeves and ducts for a construction project. The checklist includes 8 points to verify such as having approved shop drawings, checking material availability, verifying invert levels and locations match approved drawings, checking joint requirements are met, blocking of ends, ensuring adequate sizes, and protecting during concrete/mortar works. The document includes spaces for signatures and dates from the site engineer, MEP engineer, project engineer, project manager, HSEQ, and QA/QC incharge.
Project No. 19 Project Name Project detail/ Location
Check list for Marking & Installation of Sleeves / Ducts
Location: Sheet No.
S. No. Points to be verified Yes No N/A Remarks
1 Are the shop drawings approved and available at site 2 Approval of material and availability at site 3 Are the invert levels cross checked with the approved drawings 4 Are location and entry of sleeves/ducts cross checked with the approved drawings 5 Joints of sleeves / ducts checked as per requirement 6 Blocking of ends for sleeves / ducts 7 Are the sizes of sleeves and ducts adequate for the cable or pipe to pass easily 8 Protection while concreting / mortar works Other special requirements/Remarks: