Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

PROJECT PROFILE

Project Name : : Project Area (Has):


Developer :
No. of Lots :
Project Classification: : Selling Price :
Location :
DEVELOPMENT STANDARDS

HLURB PROPOSED
PARAMETERS PLANNING STANDARDS
STANDARDS OF PROJECT
PD 957 BP PD 957 BP
OM MC 220 SH OM MC 220 SH
Parks & Playground Allocation: (No. of lots/ha) % of gross area for PP:
BP 220 PD 957 .
 150 % below 20 & below 3.5 % 3.5%
 161-175 21 - 25 4.0 5.0
 176-200 26 - 35 5.0 6.0
 201-225 36 - 50 6.0 7.0
 Above 225 51-65 7.0 9.0
Above 65 9.0 -
Community Facilities Allocation (No. of lots/ha) % of gross area for CF:
 150 & below Mandatory 1.0%
 151-225 regardless of 1.5%
density
 Above 225 2.0%
Minimum Lot Area (sq,m)
 Single Detached 120 100 72 64
 Duplex/Single Attached 96 80 54 48
 Row house 60 50 36 28
Roads-right-of-Way:
 Major 10-15 8-15 8-12
 Collector 10-12- 8-10 8-10
 Minor 8-10 6.5 6.5
 Motor Court 6
 Alley 2
 Pathway - - - 3
Planting Strip (PS)
 15 m ROW 1.30
 12.0 m ROW 0.80
 10.0 m ROW 0.80
 8.0 m ROW 0.40
 6.5 m ROW Optional
Side Walk (SW)
 15 m ROW 1.20
 12.0 m ROW 1.20
 10.0 m ROW 1.20
 8.0 m ROW 0.4 0.60
 6.5 m ROW (6 m service road for Optional 0.50 .
PD 957
Evaluation (in bullet statements):

 Site Zoning Classification:


 Other Permits/Clearances from other Agencies:
 Status of Development:
 Other findings & evaluation (e.g. drainage outfall, terrain of location, complaints, etc.)

Recommendations (in bullet statements):

Prepared By: Reviewed By: Noted By:

You might also like