Download as pdf
Download as pdf
You are on page 1of 1
[i] WorleyParsons Level3 | Block 9 | 90" treet | Sector |S" Settlement | New Cara | Cao | Eeyet Te +202 226148600 |FAX: +202 26348899 DOCUMENT / DRAWING TRANSMITTAL ERC Refinery Project Sheet: 1 of 4 To: GS Engineering & Construction Date: 11-Aug-16 131 Omar Bakeer St. Sth Floor from Osman Ebn Affan St Heiopis Cairo Egypt TR. No. PS-GS-7-1983 TEL: (20)2-2634 1556/1557/1653, Ret. No: GS-ES-T-3104 Attn: Mr. K.S. Jung / Project Director ‘Subject: Field Change Notoe-Desin Chango fr Fence of Foundaton Related EETC Cable sim] Document’ Drawing No. | Rev. |categor| Description Title status | Shuvol 7 FONT 7] 1 — Fait Change Natio: Design Change for Fance of Foundation] 7] 2 [Related EETC Cable Lena [em cots space rari ole FGhang NFO yo ha ein po ay cnt or ohana he rn fre [Noto [enna sasnool Fenton orn ant ra ay pre eo ort ny veo ie rnp a Farah Distibuted to Ena atau, || Apowe/Reiwesh no cones 68/caN0 gor 3 ommentsas Noted and Amend and Resubmit 445 Revised and Rese WP /Soou Scones merry Saebincon otierwsar seas aT Manager Project Director [rect roqured Pease acronodge hs recip and return wn rate) The above documert octet

You might also like