Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

Measurement of PS RAB assignment failure per cell(RAB.EstFailPs.

Cell) Page 1 of 4

Measurement of PS RAB assignment failure per cell


(RAB.EstFailPs.Cell)
Overview

The CN in PS domain initiates the radio access bearer setup procedure by sending a RAB ASSIGNMENT
REQUEST message to the RNC.
After receiving the RAB ASSIGNMENT REQUEST message, the RNC selects an appropriate cell, allocates
resources, and performs admission control based on the information in the message (such as service type,
QoS, and priority), the traffic load of the system, and the networking strategy (such as DRD). The
requirements of high-priority users are met preferentially(That is, when the resources are insufficient and
the UEs with low-priority cannot set up the RAB, the RNC sends to the CN a RAB ASSGNMENT
RESPONSE message if the queuing algorithm is enabled, indicating that the RAB is in the queue to wait for
resources). If the admission of the RAB succeeds, the RNC starts the Iu transport connection setup
procedure, the Iub radio bearer setup procedure, and the Uu radio bearer setup procedure. At last, the RNC
sends to the CN a RAB ASSNMENT RESPONSE, indicating whether the RAB setup is successful.
If DRD is enabled during the RAB setup, the RAB setup measurement is performed on the DRD target cell.
Otherwise, the RAB setup measurement is performed on the DRD source cell.
The RAB setup procedure is as follows.
Figure 1 RAB Setup Flow

mk:@MSITStore:C:\Solutions\VendorDocumentation\UTRAN\Huawei\R12\BSC690... 24/07/2013
Measurement of PS RAB assignment failure per cell(RAB.EstFailPs.Cell) Page 2 of 4

mk:@MSITStore:C:\Solutions\VendorDocumentation\UTRAN\Huawei\R12\BSC690... 24/07/2013
Measurement of PS RAB assignment failure per cell(RAB.EstFailPs.Cell) Page 3 of 4

Table 1 describes the measurement points shown in Figure1.

Measurement points Description


E VS.RAB.FailEstabPS.DLIUBBand.Cong,
VS.RAB.FailEstabPS.ULIUBBand.Cong,
VS.RAB.FailEstabPS.ULCE.Cong,
VS.RAB.FailEstabPS.DLCE.Cong,
VS.RAB.FailEstabPS.Code.Cong,
VS.RAB.FailEstabPS.ULPower.Cong,
VS.RAB.FailEstabPS.DLPower.Cong
N VS.RAB.FailEstabPS.TNL
F VS.RAB.FailEstabPS.IubFail,
VS.RAB.FailEstabPS.ULCE.Cong,
VS.RAB.FailEstabPS.DLCE.Cong
G VS.RAB.FailEstabPS.UuFail,
VS.RAB.FailEstabPS.UuNoReply,
VS.RAB.FailEstabPS.RBIncCfg,
VS.RAB.FailEstabPS.RBCfgUnsupp,
VS.RAB.FailEstabPS.PhyChFail
K VS.RAB.FailEstabPS.RNL, VS.RAB.FailEstabPS.TNL

Measurement Counters

ID Counter Description Original


Release
67192612 VS.RAB.FailEstabPS.DLIUBBand.Cong Number of Failed PS RAB Establishments Earlier than
for Cell (DL Iub Bandwidth Congestion) V900R011
67192613 VS.RAB.FailEstabPS.ULIUBBand.Cong Number of Failed PS RAB Establishments Earlier than
for Cell (UL Iub Bandwidth Congestion) V900R011
67189556 VS.RAB.FailEstabPS.RNL Number of Failed PS RAB Establishments Earlier than
for Cell (Radio Network Layer Cause) V900R011
67189557 VS.RAB.FailEstabPS.TNL Number of Failed PS RAB Establishments Earlier than
for Cell (Transport Network Layer Cause) V900R011
67190408 VS.RAB.FailEstabPS.ULCE.Cong Number of Failed PS RAB Establishments Earlier than
for Cell (UL CE Congestion) V900R011
67190409 VS.RAB.FailEstabPS.DLCE.Cong Number of Failed PS RAB Establishments Earlier than
for Cell (DL CE Congestion) V900R011
67179967 VS.RAB.FailEstabPS.Code.Cong Number of Failed PS RAB Establishments Earlier than
for Cell (Code Congestion) V900R011
67193540 VS.RAB.FailEstabPS.RBIncCfg Number of Failed PS RAB Establishments V900R012
for Cell (UU interface invalid configuration)
67193541 VS.RAB.FailEstabPS.RBCfgUnsupp Number of Failed PS RAB Establishments V900R012
for Cell (Configuration unsupported of UE
during the RB setup procedure)
67193543 VS.RAB.FailEstabPS.UuNoReply Number of Failed PS RAB Establishments V900R012
for Cell (No reply of UE during the RB
setup procedure)
67193542 VS.RAB.FailEstabPS.PhyChFail Number of Failed PS RAB Establishments V900R012
for Cell (Physical channel failure of UE
during the RB setup procedure)
67193613 VS.RAB.FailEstabPS.ULPower.Cong Number of Failed PS RAB Establishments V900R012
for Cell (UL Power Congestion)
67193614 VS.RAB.FailEstabPS.DLPower.Cong Number of Failed PS RAB Establishments V900R012

mk:@MSITStore:C:\Solutions\VendorDocumentation\UTRAN\Huawei\R12\BSC690... 24/07/2013
Measurement of PS RAB assignment failure per cell(RAB.EstFailPs.Cell) Page 4 of 4

for Cell (DL Power Congestion)


73393837 VS.RAB.FailEstabPS.IubFail Number of Failed PS RAB Establishments V900R012
Due to Radio Link Configuration Failure for
Cell
73393838 VS.RAB.FailEstabPS.UuFail Number of Failed PS RAB Establishments V900R012
Due to Uu Interface Configuration Failure
for Cell
67179930 VS.RAB.FailEstabPS.Unsp Number of Failed PS RAB Establishments Earlier than
for Cell (Unsupported Capabilities) V900R011
73394298 VS.RAB.FailEstabPS.Cong Number of Failed PS RAB Establishments V900R012
for Cell (Congestion)

Counter Relationship

Counter Sub Counter


VS.RAB.FailEstabPS.UuFail VS.RAB.FailEstabPS.RBIncCfg
VS.RAB.FailEstabPS.RBCfgUnsupp
VS.RAB.FailEstabPS.UuNoReply
VS.RAB.FailEstabPS.PhyChFail
VS.RAB.FailEstabPS.RNL VS.RAB.FailEstabPS.IubFail
VS.RAB.FailEstabPS.UuFail
VS.RAB.FailEstabPS.Unsp VS.RAB.FailEstabPS.Cong

Huawei Proprietary and Confidential


Copyright © Huawei Technologies Co., Ltd.

mk:@MSITStore:C:\Solutions\VendorDocumentation\UTRAN\Huawei\R12\BSC690... 24/07/2013

You might also like