C - SUPER STRUCTURE Page-05

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

C-1 CONCRETING WORK


1.-1 1:2:4 (3/4") column shaft up to slab Cube 1.13 35435.00 40041.55

1.-2 1:2:4 (3/4") RCC beam Cube 1.80 35435.00 63783.00

1.-3 1:2:4 (3/4") slab (Not exceeding 0'-5" ) Cube 7.14 35435.00 253005.90

1.-4 1:2:4(3/4") concreting work for stair case Item 1.00 35000.00 35000.00

Total Carried to summary 391830.45

C-2 REINFORCEMENT ORK


2.-1 in 9"x9" column sharfts Kg 160 135.00 21600.00
2.-2 beam in floor slabs Kg 600 135.00 81,000.00
2.-3 Slab Kg 1400 135.00 189,000.00

Total Carried to summary 291,600.00

C-3 FORMWORK
3.-1 For sides of columns Sqrs 5.61 8,049.00 45154.89
3.-2 For side of beams Sqrs 7.21 8,049.00 58033.29
3.-3 For sides and soffit of slab Sqrs 17.13 8,049.00 137879.37

Total Carried to summary 241067.55

C-4 MASONARY WORK


4.-1 Brick work for walls Sqrs 18.15 16000.00 290400.00
4.-2 5/8" thick masonry cement plaster finish smooth
with lime putty in all internal walls including reveals Sqrs 22.3 7200.00 160560.00
4.-3 5/8" thick masonry cement plaster finish smooth
with lime putty in soffit of slab Sqrs 17.13 7200.00 123336.00

Total Carried to summary 574296.00

C-5 FLOOR FINISHES


5.-1 16"x12" non-slip floor tiles to complete with the bedding
& finished with cement grout to match the colour
including skirting at only main building area
Sqrs 7.26 24875.00 180592.50
5.-2 2" Thick cement Rendering for rooms floor area
3 Sqrs 8.6 11665.00 100435.65
Total Carried to summary 281028.15

Page -06
ITEM DESCRIPTION UNIT QTY RATE AMOUNT

C-6 PAINTING
6.-1 Applying two coat of filler and tow coat of emulsion
paint on all internal surfaces of the wall Sqrs 11.15 4900.00 54635.00

6.-2 Applying two coat of filler and tow coat of emulsion


paint to slab soffit Sqrs 17.13 4900.00 83937.00

6.-3 Applying one coat of filler and tow coat of wether gurd
paint to all external walls Sqrs 11.15 5400.00 60210.00

Total Carried to summary 198782.00

C-7 DOOR AND WINDOWS

7.-1 8'x4' Panel door Item 1 84000.00 84000.00


7.-2 8'X7' Foldering Door Item 1 36600.00 36600.00
7.-3 3'x7' Wooden Door Item 2 19500.00 39000.00
7.-4 2'6"x 7' Panel door Item 1 22600.00 22600.00
7.-5 5'-6"x6'-10" French windows Item 2 34650.00 69300.00
7.-6 8'-0"x4'-0" casement window Item 1 30400.00 30400.00
7.-7 8'-0"x 8'6" Windows Item 1 52000.00 52000.00
7.-8 3'-7"x 6'-10" Fitglass Panel Item 1 18400.00 18400.00
7.-9 2'-0"x 3'-0" glazed fanlight Item 1 5200.00 5200.00

Total Carried to summary 357500.00


SUMMARY OF BOQ
C SUPER STRUCTURE
C-1 CONCRETING WORK 391,830.45
C-2 REINFORCEMENT ORK 291,600.00
C-3 FORMWORK 241,067.55
C-4 MASONARY WORK 574,296.00
C-5 FLOOR FINISHES 281,028.15
C-6 PAINTING 198,782.00
C-7 DOOR AND WINDOWS 332,500.00

Total Of Ground Floor - Super Structure 2,311,104.15

Sub structure total 633,804.92

Super structure total 2,311,104.15

TOTAL COST FOR THE CONSTRUCTION 2,944,909.07

Thank You
……………………………………………………..
BRILLIANT CONSTRUCTIONS
QS / Draftsman
BILL OF QUANTITIES