1024 1020

1023 1019
1022 1018
1021 1017
1020 1016
1019 1015
1018 1014
1017 1013
1016 1012
1015 1011
1014 1010
1013 1009
1012 1008
1011 1007
1010 1006
1009 1005
1008 1004 Existing PCCP (LL) to be Removed and Replaced
1007 1003
1006 1002 Proposed Widening Block
1005 Existing PCCP (LL) to be Removed and Replaced 1001
1004 1000
1003 Proposed Widening Block 999
Selected Embankment
1002 998
1001 997
1000 996
Gabion Terramesh 5-2x1x0.5M
999 Selected Embankment 995
998 994
997 993
996 Gabion Terramesh 5-2x1x0.5M 992
995 991
994 990
993 989
992 988
Item 103 = 111.99 sq m
991 987
Item 104 = 104.49 sq m
990 986
989 985
988 984
987 983 Reno Mattress 5x2x0.3
Item 103 = 149.77 sq m
986 982
Item 104 = 105.90 sq m
985 981
984 980
Reno Mattress 5x2x0.3
983 979
982 978
981 977
980 976
979 975
978 974
977 973
976 972
975 971
974 970
973 969
972 968
971 967
970 966
969 965
968 964

FGE=999.215
OGE=999.22
FGE=999.580

967 963
OGE=999.58

966 962
965 961
964 960
963 959
962 958
961 957
960 956
959 955
958 954
957 953
956 952
955 951
954 950
-50-49-48-47-46-45-44-43-42 -41-40-39-38-37-36-35-34-33-32 -31-30-29-28-27-26-25-24-23-22 -21-20-19-18-17-16-15-14-13-12 -11-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 -50-49-48-47-46-45-44-43-42 -41-40-39-38-37-36-35-34-33-32 -31-30-29-28-27-26-25-24-23-22 -21-20-19-18-17-16-15-14-13-12 -11-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

314+510.00
314+515.00

PROJECT TITLE/LOCATION: SHEET CONTENT: SHEET NO.

E.K.C. CONSTRUCTION AND AGGREGATES


LA TRINIDAD EUSEBIO K. CUPIDO ISMAEL B. DELA CRUZ CLIFTON D. VALENCERINA ANGELITA B. MABITAZAN ALBERTO N. GAHID DANILO E. DEQUITO, CESO III
E.K.C MANAGER DPWH PROJECT ENGINEER CHIEF CONSTRUCTION DIVISION CHIEF PLANNING & DESIGN DIVISION OIC-ASSISTANT REGIONAL DIRECTOR, CAR. REGIONAL DIRECTOR, CAR.