Instrumentasi Bendung Logung
Instrumentasi Bendung Logung
A INSTRUMENTASI
1 Pneumatic Pizometer Itm Soil
2 Vibrating Wire Pizometer Itm Soil
3 Seepage Water Measuring Device Itm Soil
4 Crest Settlement Point LOKAL
5 Surface Settlement Point Up Stream LOKAL
6 Surface Settlement Point Down Stream LOKAL
7 Inclinometer Combine with Multi Layer Settlement Itm Soil
B MEKANIKAL - ELEKTRIKAL
1 Pintu Penutup Konduit (Closure Gate)
2 Katup Utama Pengambilan (Bulkhead Gate)
3 Katup Kontrol (Guard Gate)
4 Katup Pengatur (Control Valve)
5 Pengeluaran (Outlet) Air Baku
6 Lainnya
RALATAN HIDROMEKANIKAL DAN INSTRUMENTASI BENDUNGAN LOGUNG
LOKASI
JENIS LOKASI
No SIMBOL LABEL OFFSET DARI ELEVASI JUMLAH PEMBACAAN
INSTRUMEN STA
AS DAM
1 SD-1 11 150,0 m D/S 42.00 2 Diukur pada
Seepage
SD-2 11 150,0 m D/S 42.00 lokasi V-Notch
Measuring
Device
2 CSD-1 17 6.0 m D/S 94.00 8
CSD-2 15 6.0 m D/S 94.00
CSD-3 13 6.0 m D/S 94.00
Crest CSD-4 11 6.0 m D/S 94.00 Survey
Settlement
Point CSD-5 9 6.0 m D/S 94.00 topografi
CSD-6 7 6.0 m D/S 94.00
CSD-7 5 6.0 m D/S 94.00
CSD-8 3 6.0 m D/S 94.00
3 SSU-1 15 14.0 m U/S 90.00 6
Surface SSU-2 13 14.0 m U/S 90.00
Settlement SSU-3 11 14.0 m U/S 90.00 Survey
Point SSU-4 9 14.0 m U/S 90.00 topografi
Upstream
SSU-5 7 14.0 m U/S 90.00
SSU-6 5 14.0 m U/S 90.00
4 SSD-1 15 36.0 m D/S 81.00 17
SSD-2 13 36.0 m D/S 81.00
SSD-3 11 36.0 m D/S 81.00
SSD-4 9 36.0 m D/S 81.00
SSD-5 7 36.0 m D/S 81.00
SSD-6 5 36.0 m D/S 81.00
SSD-7 15 66.0 m D/S 70.00
Surface SSD-8 13 66.0 m D/S 70.00 Survey
Settlement
Point SSD-9 11 66.0 m D/S 70.00 topografi
Downstream SSD-10 9 66.0 m D/S 70.00
SSD-11 7 66.0 m D/S 70.00
SSD-12 15 96.0 m D/S 58.00
SSD-13 13 96.0 m D/S 58.00
SSD-14 11 96.0 m D/S 58.00
SSD-15 9 96.0 m D/S 58.00
SSD-16 11 131.0 m D/S 48.00
SSD-17 9 131.0 m D/S 48.00
5 Inclinometer IM-1 8+4 As Dam 94.00 3 Puncak
with Multi IM-2 12 + 16 As Dam 94.00 bendungan
Layer
Settlement IM-3 4 As Dam 94.00
6 OW-1 16 + 5 80.0 m D/S 5
OW-2 15 130.0 m D/S Diukur pada
Observation
Well OW-3 7 + 15 160.0 m D/S tiap lubang
6
Observation
Well
OW-4 7+8 111.0 m D/S
OW-5 2 15.0 m D/S
7 Automatic 1
Water Level AWLR-1
Recorder
8 TSC-1/1 8 As Dam 73.00 4
TSC-1/2 8 1.0 m U/S 73.00 Terminal box 3
TSC-1/3 8 As Dam 73.00
TSC-2/1 8 As Dam 47.50
TSC-2/2 8 1.0 m U/S 47.50 Terminal box 3
Total Stress TSC-2/3 8 As Dam 47.50
Cell TSC-3/1 13 As Dam 67.50
TSC-3/2 13 1.0 m U/S 67.50 Terminal box 3
TSC-3/3 13 As Dam 67.50
TSC-4/1 13 As Dam 39.30
TSC-4/2 13 As dam 39.30 Terminal box 3
TSC-4/3 13 As Dam 39.30
9 SMA-1 10 + 12 10.0 m D/S 93.00 3 Diukur pada
Strong Motion
Accelograph SMA-2 10 + 12 60.0 m D/S 78.00 lokasi alat
SMA-3 8 160 .0 m D/S 50.00
10 SP-1 10 14.0 m U/S 70.00 3 Diukur pada
Stand Pipe
Piezometer SP-2 10 8.0 m D/S 65.00 tiap lubang
SP-3 10 25.0 m D/S 60.00
11 P-1 12+18 9,0 m U/S 24.00 25
P-2 12+18 9,0 m D/S 24.00
P-3 12+18 9,0 m U/S 34.00
P-4 12+18 9,0 m D/S 34.00
P-5 12+18 9,0 m U/S 41.00
P-6 12+18 As Dam 41.00
P-7 12+18 9,0 m D/S 41.00
P-8 12+18 9,0 m U/S 51.50
P-9 12+18 9,0 m D/S 51.50
P-10 12+18 5.0 m U/S 67.50
P-11 12+18 5.0 m D/S 67.50
P-12 12+18 30.0 m D/S 67.50
Vibrating Wire
P-13 12+18 As Dam 84.00 Terminal box 2
Piezometer
P-14 5 6.0 U/S 55.00
P-15 5 6.0 D/S 55.00
P-16 5 6.0 U/S 62.50
P-17 5 6.0 D/S 62.50
P-18 5 4.0 U/S 80.00
P-19 5 4.0 D/S 80.00
P-20 15 +10 6.0 U/S 48.50
P-21 15 +10 6.0 D/S 48.50
P-22 15 +10 6.0 U/S 55.50
P-23 15 +10 6.0 D/S 55.50
P-24 15 +10 4.0 U/S 75.00
P-25 15 +10 4.0 D/S 75.00
12 PP-1 8 7.5 m U/S 30.00 13
PP-2 8 7.5 m D/S 30.00
PP-3 8 7.5 m U/S 40.00
PP-4 8 7.5 m D/S 40.00
PP-5 8 7.5 m U/S 47.50
PP-6 8 As Dam 47.50
Pneumatic
PP-7 8 7.5 m D/S 47.50 Terminal box 1
Piezometer
PP-8 8 7.5 m U/S 62.00
PP-9 8 7.5 m D/S 62.00
PP-10 8 5.0 m U/S 73.00
PP-11 8 5.0 m D/S 73.00
PP-12 8 30.0 m D/S 73.00
PP-13 8 As Dam 84.00
KETERANGAN
Magnet plate
interval 10 m
Kedalaman bor 1 m
di bawah muka air
tanah
Kedalaman bor 1 m
di bawah muka air
tanah
Horisontal
450 U/S
450 L/B
Horisontal
450 U/S
450 L/B
Horisontal
450 U/S
450 L/B
Horisontal
450 U/S
450 L/B
Elevasi piezometer
tip
Elevasi piezometer
tip
Elevasi piezometer
tip
NO Nama Instrument/Hidromekanikal Merk/Seri
1 Pneumatic Pizometer
kolam retensi,/tandon
Jeruji besi tegak, removable
Pipa dengan diameter 1,2 meter
Katup kupu-kupu (Butterfly Valve)
Bonetic Gate
Katup pancar rongga (Hollow Jet Valve)
Katup kupu-kupu (Butterfly Valve)
Cara Pengoperasian/Buku Panduan
Memonitor tekanan air pori dengan cara mengontrol data dari settlement plate
suatu alat sensor yang dipasang pada kedalaman dan jenis lapisan batupasir (akifer) untuk mengetahui
intensitas tekanan air.
Instrumen yang dapat digunakan untuk menentukan laju aliran melintasi antarmuka air sedimen.
mengukur pergerakan di permukaan dari Bendungan baik horizontal maupun vertikal.
Bor lubang bor ke kedalaman sedikit dangkal dari kedalaman yang akan dimasukkan Jangkar Flush puing dari luban
untuk memantau penyelesaian vertikal di permukaan tanggul, tanah, massa, dan lain-lain
untuk mengukur pergerakan horizontal yang terjadi di dalam tubuh bendungan (gerakan internal).
Sumur pengamatan untuk mengukur elevasi muka air tanah di sekitar bendungan.
alat pengganti sistem pengukuran tinggi air konvensional dan perekaman masih secara manual.
alat perekam hujan sistem digital yang mengumpulkan kejadian hujan, tanggal dan jam yang memberikan peringata
sebagai alat pencatat data getaran-getaran seismik secara digital.
Alat ini memiliki lubang-lubang pada ujungnya dimasukkan melalui lubang bor ke dalam tanah.
mengukur kebocoran air pada tubuh bendung menggunakan listrik
dengan cara merawas dari jembatan dengan menggunakan perahu dengan menggunakan winch cable way dan den