Planning & Scheduling Simplified
Planning & Scheduling Simplified
Scheduling Project Start Date – Gearing project with a start date (Not the construction start but conception)
To avoid unnecessary constraints, it is recommended to set up the project start date using scheduling tool
3. Construction – Line 2.
6. Framing/Backing/Anchor/J hook
7. Inspections
Break or crash the tasks as in the picture – Each task represents their trade/inspections/milestone
In other words – It reflects the estimation log and helps the project in controlling & planning costs/disruptions and shutdowns
Productivity and Historic Data
1. The process of calculating duration for each task becomes simple for a person who practically acquired
skills in executing project tasks again and again under different working conditions/areas/countries.
2. This approach is called ‘Historic’ approach and also a best method that saves time in calculating a ball park
or an optimistic/most likely durations.
3. Each area has its own standards and per hour rates. One must consider this data before validating the
schedule.
4. To calculate the project durations and cost accurately, it is important to know the productivity of the
workforce – Carpenters/Masons/Ironworkers or Steel Fixers/Painters and non productive workforce.
Calculation –
1. Man hour / Ton – Iron Workers/Steel Fixers
2. Man hour/Sqft – Formwork/Gyp-board/Framing/Façade etc
3. Man hour/cum – Concrete
Step – 2 : Breakdown into packages
REFRESHER
Fun - You may try your daily schedule as a project – ‘Daily Schedule’
REFRESHER
The Process is explained in detail below – This is to understand how one can manage tasks on a paper
Indent tasks
Select tasks from line 2 to line 27 and click on “Indent” on the menu bar (Green Arrow – pointing right)
Select tasks from line 3 to line 27 and click on “Indent” on the menu bar (Green Arrow – pointing right)
Select tasks from line 4 to line 27 and click on “Indent” on the menu bar (Green Arrow – pointing right)
Step – 4 : Alignment, Outdent
Outdent tasks
Establish Durations for each task: Consider historic data or as per your experience with available man power and
organizational constraints.
Please go through each task to justify the duration that it may take to complete the work.
By default – 1 day duration gets assigned with a question mark. Questions mark means –To validate the task duration. If it
takes one day, just type 1 over (1?).
Consider
Material requirements
Curing Time
Lead Time
Organizational Constraints
Manpower
Delivery date
Budget and other conditions as needed.
Step – 5 : Understanding Relationships/Dependencies
Types of Relationships
SS - Start to Start
FS – Finish to Start
FF – Finish to Finish
SF – Start to Finish (not to be used due to its reverse nature)
Typically used relationship – ‘FS’ - Finish to start and ‘SS’ - Start to start.
It is important to sequence the activities at the beginning of the project and at every
phase of execution. Sequencing ensures that the vendors are engaged properly but not
stacked.
Step – 6 : Assign Predecessors & Successors
Schedule a task in reference to its predecessor – In parallel (SS)/a day after (SS+1) or (FS-1 – goes with the duration) /
Finishing predecessor along with the current one (FF)
Step – 7
Start Column - Type date – 1/1/2018, then click on ‘Details’ – select the radio button yearly.
Select “On Radio Button” – Make sure you see January 1st or type it.
Select “End after” Radio Button and type the number of occurrences ‘lets say 10 till 2027’
Similarly – List out all the calendar holiday’s as per your organization holidays.
Standard calendar will be the project calendar that ensures work only on a work day.
• Follow the process and screen shots to add
holidays to your calendar.
Click on – ‘Details’