Name of work: Upgrading the Road From Thiruchuli - Kamuthi Road to Muthaneri - Kurunthankulam Road v
Naduvapacheri, Regunathamadai, Kulalikulam (Km 3.991 - 6.786) upto Union Limit Km. 0/0 - 2/750
Proving Ring
Penetration (mm) Actual Load Corrected Load Standard Load
Reading
0.00 0.00 0.00
0.50 6.80 7.60
1.00 15.60 17.43
1.50 22.90 25.59
2.00 31.60 35.32
2.50 40.50 45.26 45.26 1370.00
3.00 48.20 53.87
4.00 60.40 67.50
5.00 75.80 84.71 84.71 2055.00
7.50 96.70 108.07
10.00 118.10 131.99
L o a d o n p i s t o n i n ( k g /c m 2 )
150
100
50
0
0.00 2.50 5.00 7.50 10.00 12.50 15.00
Penetration (mm)
CBR (%)
4.12
thankulam Road via
0 - 2/750
1.11757 Kg
10 kN
1.88 gm/cc
CBR
3.30
4.12
50 15.00
GS Associates
GEO-TECH ENGINEERING DIVISION
Name of work: Upgrading the Road From Thiruchuli - Kamuthi Road to Muthaneri - Kurunthankulam Road v
Naduvapacheri, Regunathamadai, Kulalikulam (Km 3.991 - 6.786) upto Union Limit Km. 0/0 - 2/750
Proving Ring
Penetration (mm) Actual Load Corrected Load Standard Load
Reading
0.00 0.00 0.00
0.50 5.20 5.81
1.00 13.40 14.98
1.50 21.00 23.47
2.00 30.70 34.31
2.50 38.90 43.47 43.47 1370.00
3.00 46.80 52.30
4.00 57.10 63.81
5.00 73.80 82.48 82.48 2055.00
7.50 95.50 106.73
10.00 113.90 127.29
L o a d o n p i s t o n i n ( k g /c m 2 )
150
100
50
0
0.00 2.50 5.00 7.50 10.00 12.50 15.00
Penetration (mm)
CBR (%)
4.01
thankulam Road via
0 - 2/750
1.11757 Kg
10 kN
1.93 gm/cc
CBR
3.17
4.01
50 15.00
GS Associates
GEO-TECH ENGINEERING DIVISION
Name of work: Upgrading the Road From Thiruchuli - Kamuthi Road to Muthaneri - Kurunthankulam Road v
Naduvapacheri, Regunathamadai, Kulalikulam (Km 3.991 - 6.786) upto Union Limit Km. 0/0 - 2/750
Proving Ring
Penetration (mm) Actual Load Corrected Load Standard Load
Reading
0.00 0.00 0.00
0.50 5.40 6.03
1.00 10.80 12.07
1.50 18.40 20.56
2.00 26.60 29.73
2.50 34.20 38.22 38.22 1370.00
3.00 42.40 47.38
4.00 54.60 61.02
5.00 69.20 77.34 77.34 2055.00
7.50 86.90 97.12
10.00 109.10 121.93
L o a d o n p i s t o n i n ( k g /c m 2 )
150
100
50
0
0.00 2.50 5.00 7.50 10.00 12.50 15.00
Penetration (mm)
CBR (%)
3.76
thankulam Road via
0 - 2/750
1.11757 Kg
10 kN
1.92 gm/cc
CBR
2.79
3.76
50 15.00