05
Gas Sweetening
Introduction
Design Basis
Each package is typically designed and built as a complete
turn-key ready package with particular emphasis on specific
client requirements.
Process Group is able to combine our expertise with
proprietary sour gas process simulation software to tailor
process designs to suit each application. BHP Zamzama CO2 removal plant
Location: Pakistan
As a result of our significant design and installation experience,
Process Group offers a complete range of process solutions to
remove CO2 and H2S impurities by selecting from a range of Australia
solvents including generic amines, proprietary amine blends Process Group Pty Ltd
and physical solvents. 5 Hobbs Court, Rowville, (Melbourne), VIC 3178, Australia.
Phone: +61 3 9212 7100 Fax: +61 3 9212 7199
The design of each gas sweetening plant is unique for each E-mail: sales@processgroup.com.au Web: www.processgroup.com.au
application. Where amines or physical solvents are selected
Process Group is able to choose from a range of commercial Singapore
and generic solvents, the solvent that is best suited to meet the Process Group Pte Ltd
needs of each specific application in terms of CAPEX, OPEX 298 Tiong Bahru Road #12-02/03 Central Plaza, Singapore 168730
and environmental issues is selected. Phone: +65 6276 8349 Fax: +65 6274 2005
E-mail: sales@processgroup.com.sg Web: www.processgroup.com.sg
In many cases, plant operating flexibility is a major factor and
Process Group is able to provide a plant that is compatible Middle East
with a number of different solvents. Process Group International Ltd
P.O. Box 46153, Abu Dhabi, UAE.
Phone: +971 2 5500 899 Fax: +971 2 5500898
E-mail: sales@processgroupintl.com Web: www.processgroupintl.com
Represented by:
Rev 08/2014
A.05
Gas Sweetening
Process Group ensures each plant is optimised for the Membranes offer specific advantages over solvent
following considerations: based processes including:
• To meet sales gas H2S & CO2 specifications, • Low operator requirement
• Impurity removal to minimise foaming, • Elimination of solvents from plant environment
• Operating efficiency, • Simple operation
• Materials compatibility. • Ideal for onshore and offshore applications
• No moving parts
Reference Clients
In the same manner that Process Group evaluates
• BP solvents for CO2 removal, Process Group reviews the
• RAK Gas suitability of membranes for a given application and
• BOC works with the membrane vendor to provide a solution
• AGL that is specifically tailored to suit the requirements of
• BHP Billiton each application.
• Black & Veatch
This includes developing the optimum overall
• CB&I
plant configuration and pre-treatment to ensure the
membranes are protected from contamination by heavy
Membranes hydrocarbons and other impurities.
Design Basis Where CO2 levels are high enough a plant design
combining membrane and amine solvent may offer the
Each package is typically designed and built as a best overall plant solution.
complete turn-key ready package with particular
emphasis on specific client requirements. Reference Clients
The design of CO2 removal systems is unique for each • Origin Energy
application and so a design basis is determined by • Santos
first gaining a thorough understanding of the client • BHP Billiton
requirements.