Proposed Site Layout Plan For Piling Work (5C Stage in Central Divider of Portion I)

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Legend:

H beam / sheet pile fencing


Prelim pile
Proposed Site Layout Plan for Piling Work
寄位窿(12m
Silo automatic grouting
station (9mx2.5m) depth) (5C Stage in central divider of portion I)
Waste water treatment plant

Water tank(3mx3m or 6m x
2.5m)

Water tank(2.5m dia.)

Storage Area of H pile


(12m length)

610mm Soakway pile


(~20m depth)

Site office / resting room

Air compressor & air chamber

Water filled barrier

Piling rig / crane (~5mx~8m)

Slurry tank (2.5m dia.) Prelim Pile


Swept path of Long Vehicles
only (exit the site and enter the
Western Harbour Crossing)

Silo automatic
grouting station

Soakway Pile

A3 SIZE SCALE 1:600